HomeMy WebLinkAboutResolution - 101267F - Pavement Improvements - Kerr Construction Co - John W. Jarrott Addition - 10_12_1967RESOLUTION 1 �^ RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in<,conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Lot 1, Block 3, John W. Jarrott Addition, made arrangements with Kerr Construction Company for the construction of paving improve- ments on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Lot 1, Block 3, John W. Jarrott Addition including the following street: The South Access Road to 19th Street from 18 feet West of the West Property Line of Quaker Avenue to its intersection with aline 10 feet East of the East Property Line of Lot 1, Block 9, John W. Jarrott Addition known and designated as Unit Number 2170. AND WHEREAS, the construction of the above improvements on the abovemention ed street was performed under the supervision of the City Engineer, and said im- provements have been completed and have been inspected and found to have been con- structed in accordance with City specifications and in accordance with the provisio of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money passage. II. This resolution shall take effect and be in force from and after its PASSED AND APPROVED THIS 12TH DAY ATTE ZL La enia..Iowe; C ty Secretary APPRO D: r9 l amuel W. Wahl, City Engineer APPROVED: red 0. 'Senter, Jr. , City IAtto ey POrter 2-6411 P. O. Box 2000 LUBBOCK, TEXAS 7 0 4 0 6 October 12, 1967 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Co., paving contractor, under their contract with the subdividers of Lot 1, Block 3, John W. Jarrott Add. and find the improvements on the South Access Road to 19th Street from Quaker Avenue to 290' East of Quaker Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Y44 our very t ly, 4mue W. a 1 City Engineer r CONSOLIDATED FINAL ESTIMATE JOHN W. JARROTT ADDITION LOT 1, BLOCK 3 Accepted October 12, 1967 QUANTITIES S.Y. S.Y. S.Y. Reinforced Unit & Paving L.F. Valley 6" Gutter Sub -Unit Location 6" Base C & G Gutter Base L. F. 2170 The South Access Road to 1004.12 242.62 70.56 68.48 77.00 19th Street from 18' W.of the WPL of Quaker Ave. to 10' E. of the east line of Lot 1, Block 3, John W. Jarrott Add. COST ESTIMATE 1004.12 S.Y. Paving 6" Base @ $1.69 $ 1,696.96 242.62 L.F. Curb & Gutter @ $1.59 385.77 77.00 L.F. Reinforced Curb & Gutter @ $2.00 154.00 70.56 S.Y. Valley Gutter @ $6.25 441.00 68.48 S.Y. Extra Base 6" @ $0.81 55.47 CONTRACT COST $2733.20 COST DISTRIBUTION Unit & Contract Property Owner Sub -Unit Cost Cost 2170 $ 2,733.20 $ 2,733.20