Loading...
HomeMy WebLinkAboutResolution - 101267D - Pavement Improvements - Kerr Construction Co - Southgate Addition - 10_12_1967RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Southgate Addition, Lots 95-100, made arrangements with Kerr Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Southgate Addition including the following street: The North 1/2 of 54th Street from its intersection with a line 16 feet East of the East Property Line of Memphis Avenue to its intersection with the center line of the alley East of Memphis Avenue (N. Leg) known and designated as New Subdivision Unit Number 1340. The South 1/2 of 54th Street from its intersection with a line 16 feet East of the East Property Line of Memphis Avenue to its intersection with the East line of Lot 100 Southgate Addition known and designated as New Subdivision Unit Number 1449. AND WHEREAS, the construction of the above improvements on the abovemention ed street was performed under the supervision of the City Engineer, and said improve ments have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passa€ C� n PASSED -,AND APPROVED THIS 12th DAY OF R, 967. ITA.D. R ATTEST' Lav nia Lowe. _40it Secretary APPRO. lk ✓ r a S(amuel W. Wahl, City Engineer APP OVE�pD : }}-- ed O.''Senter, Jr., City r., =�fin§L CJ POrter 2-641 1 P. O. Box 2000 LUBBOCK, TEXAS 72408 October 12, 1967 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, under their contract with the subdividers of Southgate Addition Lots 95-100 and find the improvements on 54th Street from Memphis Avenue to the alley East of Memphis Avenue (E.Leg) as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yo s very tr ly, Samuel W. Wahl City Engineer 0 rA r CONSOLIDATED FINAL ESTIMATE SOUTHGATE ADDITION LOTS 95 - 100 Accepted October 12, 1967 QUANTITIES S.Y. S.Y. Unit & Paving L.F. Alley Sub -Unit Location 6/° Base C & G Return NS 1340 The N 1/2 of 54th St. from 16' E. of the EPL of Memphis Ave. to the E of the alley E. of Memphis Ave. (N. Leg) NS 1449 The S 1/2 of 54th St. from 16' E. of the EPL of Memphis Ave. to the E. line of Lot 100 Southgate Addition ��W COST ESTIMATE 1400.88 S.Y. Paving 6" Base 795.00 L.F. Curb & Gutter 7.78 S.Y. Alley Return 700.44 401.00 7.78 700.44 394.00 1400.88 795.00 7.78 @ $1.60 $ 2,241.40 @ $1.60 1,272.00 @ $6.50 50.57 CONTRACT COST $3,563.97 COST DISTRIBUTION Property City to Unit & Contract Owner Contractor Prepaid Sub -Unit Cost Cost NOW Paving NS 1340 1,812.87 243.44 1,569.43 NS 1449 1,751.10 1,751.10 TOTALS 3,563.97 1,751.10 243.44 1,569.43 M