HomeMy WebLinkAboutResolution - 101267D - Pavement Improvements - Kerr Construction Co - Southgate Addition - 10_12_1967RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Southgate Addition, Lots 95-100, made arrangements
with Kerr Construction Company for the construction of paving improvements on a
certain street dedicated in said subdivision under the provisions of said Ordinance
prior to the recording of the subdivision plat of Southgate Addition including the
following street:
The North 1/2 of 54th Street from its intersection with a line 16 feet East of the
East Property Line of Memphis Avenue to its intersection with the center line of the
alley East of Memphis Avenue (N. Leg) known and designated as New Subdivision Unit
Number 1340.
The South 1/2 of 54th Street from its intersection with a line 16 feet East of the
East Property Line of Memphis Avenue to its intersection with the East line of Lot
100 Southgate Addition known and designated as New Subdivision Unit Number 1449.
AND WHEREAS, the construction of the above improvements on the abovemention
ed street was performed under the supervision of the City Engineer, and said improve
ments have been completed and have been inspected and found to have been constructed
in accordance with City specifications and in accordance with the provisions of
City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be and
the same are hereby accepted and the City Engineer be and he is hereby authorized
to direct the payment of the City's portion of the cost and to release escrow money.
II.
This resolution shall take effect and be in force from and after its passa€
C� n
PASSED -,AND APPROVED THIS 12th DAY OF R, 967.
ITA.D. R
ATTEST'
Lav nia Lowe. _40it Secretary
APPRO. lk ✓
r
a
S(amuel W. Wahl, City Engineer
APP OVE�pD : }}--
ed O.''Senter, Jr., City
r.,
=�fin§L
CJ
POrter 2-641 1
P. O. Box 2000
LUBBOCK, TEXAS 72408
October 12, 1967
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under their contract with the
subdividers of Southgate Addition Lots 95-100 and find the improvements
on 54th Street from Memphis Avenue to the alley East of Memphis Avenue
(E.Leg) as listed on the final estimate sheet to have been completed
in accordance with the plans and specifications and recommend that you
accept the improvements on said street, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due them by the City of Lubbock.
Yo s very tr ly,
Samuel W. Wahl
City Engineer
0
rA
r
CONSOLIDATED FINAL ESTIMATE
SOUTHGATE ADDITION
LOTS 95 - 100
Accepted October 12, 1967
QUANTITIES
S.Y. S.Y.
Unit & Paving L.F. Alley
Sub -Unit Location 6/° Base C & G Return
NS 1340 The N 1/2 of 54th St. from 16' E.
of the EPL of Memphis Ave. to the
E of the alley E. of Memphis Ave.
(N. Leg)
NS 1449 The S 1/2 of 54th St. from 16' E.
of the EPL of Memphis Ave. to the
E. line of Lot 100 Southgate
Addition
��W
COST ESTIMATE
1400.88 S.Y. Paving 6" Base
795.00 L.F. Curb & Gutter
7.78 S.Y. Alley Return
700.44 401.00 7.78
700.44 394.00
1400.88 795.00 7.78
@ $1.60 $ 2,241.40
@ $1.60 1,272.00
@ $6.50 50.57
CONTRACT COST $3,563.97
COST DISTRIBUTION
Property City to
Unit & Contract Owner Contractor Prepaid
Sub -Unit Cost Cost NOW Paving
NS 1340 1,812.87 243.44 1,569.43
NS 1449 1,751.10 1,751.10
TOTALS 3,563.97
1,751.10 243.44 1,569.43
M