Loading...
HomeMy WebLinkAboutResolution - 101267C - Street Improvements - Kerr Construction Co - Live Oak Addition - 10/12/196711 RESOLUTION 10 RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES .-� 11AS LISTED BELOW: WHEREAS, the City of Lubbock passed a resolution on May 11, 1967 authorizin the construction of street improvements by Kerr Construction Company on portions of the following streets: The North 1/2 of 66th Street from its intersection with the West Property Line of Lot B, Live Oak Addition to its intersection with a line 5 feet West of the West Lip Line of Elgin Avenue known and designated as New Subdivision Unit Number 1699. The West 1/2 of Elgin Avenue from its intersection with the North Property Line of Lot B, Live Oak Addition to its intersection with the North Lip Line of 66th Street known and designated as New Subdivision Unit Number 1700. AND WHEREAS, the improvements upon the said portions of the abovementioned streets have been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS I. That the improvements on said portions of the abovementioned streets be, and the same are hereby accepted and the City Engineer be and he is hereby authorize to direct the payment of the City's share and release escrow money. I1. This resolution shall take effect and be in force after its passage. PASSED AND APPROVED THIS 12TH DAY ATTEST: Lave 'a_Lowe, Cit Secretary APPROVED: f amuel W. Waht, dilty Engineer Porter 2-6411 P. O, Box 2000 LUBBOCK, TEXAS 794015 October 12, 1967 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, as authorized by a resolution passed on May 11, 1967 and find the improvements on the West 1/2 of Elgin Avenue from 64th Street to 66th Street and on the North 1/2 of 66th Street from Elgin Avenue to 660' West of Elgin Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improve- ments on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yo s very my mue ah City Engineer CONSOLIDATED FINAL ESTIMATE GWO 2922 Accepted October 12, 1967 UANTITIES S.Y. S.Y. S.Y. , S.Y. Reinforced Unit & Paving L.F. Alley Valley Re-sur- Gutter Sub -Unit Location 6" Base C & G Return Gutter facing L. F. NS 1699 The N 1/2 of 66th St. from 1175.11 615.00 25.56 304.89 30.00 the WPL of Lot B, Live Oak Add. to 5' W. of the West Lip Line of Elgin Ave. NS 1700 The W 1/2 of Elgin Avenue 1178.67 628.67 12.22 17.38 339.60 32.00 from the N. line of Lot B Live Oak Add. to the N. Lip Line of 66th St. TOTALS 2353.78 1243.67 37.78 17.38 644.49 62.00 COST ESTIMATE 2353.78 S.Y. Paving 6" Base 1243.67 L.F. Curb & Gutter 62.00 L.F. Reinforced Curb & Gutter 37.78 S.Y. Alley Return 17.38 S.Y. Valley Gutter 644.49 S.Y. Resurface @ $1.72 $ 4,048.50 @ $1.60 1,989.87 @ $2.00 124.00 @ $6.00 226.68 @ $6.35 110.36 @$12.00 773.40 CONTRACT COST $ 7,272-.81 COST DISTRIBUTION Property Owner City to Unit & Contract Cost Contractor Sub -Unit Cost (Escrow) NOW NS 1699 3,584.42 3,208.15 376.27 NS 1700 3,688.39 3,608.46 79.93 TOTALS $7,272.81 $ 6,816.61 $ 456.20