RESOLUTION
10 RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
.-� 11AS LISTED BELOW:
WHEREAS, the City of Lubbock passed a resolution on May 11, 1967 authorizin
the construction of street improvements by Kerr Construction Company on portions of
the following streets:
The North 1/2 of 66th Street from its intersection with the West Property Line of
Lot B, Live Oak Addition to its intersection with a line 5 feet West of the West
Lip Line of Elgin Avenue known and designated as New Subdivision Unit Number 1699.
The West 1/2 of Elgin Avenue from its intersection with the North Property Line of
Lot B, Live Oak Addition to its intersection with the North Lip Line of 66th Street
known and designated as New Subdivision Unit Number 1700.
AND WHEREAS, the improvements upon the said portions of the abovementioned
streets have been inspected and found to have been constructed according to the
approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portions of the abovementioned streets be,
and the same are hereby accepted and the City Engineer be and he is hereby authorize
to direct the payment of the City's share and release escrow money.
I1.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 12TH DAY
ATTEST:
Lave 'a_Lowe, Cit Secretary
APPROVED:
f
amuel W. Waht, dilty Engineer
Porter 2-6411
P. O, Box 2000
LUBBOCK, TEXAS 794015
October 12, 1967
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, as authorized by a resolution
passed on May 11, 1967 and find the improvements on the West 1/2 of
Elgin Avenue from 64th Street to 66th Street and on the North 1/2 of
66th Street from Elgin Avenue to 660' West of Elgin Avenue as listed
on the final estimate sheet to have been completed in accordance with
the plans and specifications and recommend that you accept the improve-
ments on said streets and/or avenues, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due them by the City of Lubbock.
Yo s very my
mue ah
City Engineer
CONSOLIDATED FINAL ESTIMATE
GWO 2922
Accepted October 12, 1967
UANTITIES
S.Y.
S.Y. S.Y. ,
S.Y.
Reinforced
Unit &
Paving
L.F. Alley Valley
Re-sur-
Gutter
Sub -Unit Location
6" Base
C & G Return Gutter
facing
L. F.
NS 1699 The N 1/2 of 66th
St. from
1175.11
615.00 25.56
304.89
30.00
the WPL of Lot B,
Live Oak
Add. to 5' W. of
the West
Lip Line of Elgin
Ave.
NS 1700 The W 1/2 of Elgin Avenue 1178.67 628.67 12.22 17.38 339.60 32.00
from the N. line of Lot B
Live Oak Add. to the N. Lip
Line of 66th St.
TOTALS 2353.78 1243.67 37.78 17.38 644.49 62.00
COST ESTIMATE
2353.78
S.Y.
Paving 6" Base
1243.67
L.F.
Curb & Gutter
62.00
L.F.
Reinforced Curb & Gutter
37.78
S.Y.
Alley Return
17.38
S.Y.
Valley Gutter
644.49
S.Y.
Resurface
@ $1.72
$ 4,048.50
@ $1.60
1,989.87
@ $2.00
124.00
@ $6.00
226.68
@ $6.35
110.36
@$12.00
773.40
CONTRACT COST $ 7,272-.81
COST DISTRIBUTION
Property Owner City to
Unit & Contract Cost Contractor
Sub -Unit Cost (Escrow) NOW
NS 1699 3,584.42 3,208.15 376.27
NS 1700 3,688.39 3,608.46 79.93
TOTALS $7,272.81 $ 6,816.61 $ 456.20