Loading...
HomeMy WebLinkAboutResolution - 091467F - Accept Paving Improvements - Kerr Construction Co - Avenue P - 09/14/1967F RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED WHEREAS, the City of Lubbock passed a resolution on April 27, 1967 authorizing the construction of street improvements by Kerr Construction Company on a portion of the following street: Avenue "P" from its intersection with a line 3 feet South of South Property Line of alley North of 70th Place to its intersection with a line 3 feet South of North Property Line of Loop 289 known and designated as Sub -Unit Number 1 of Unit Number 2113. AND WHEREAS, the improvements upon the said portion of the abovementioned street have been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS I. That the improvements on said portion of the abovementioned street be, and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's share and release escrow money. II. This resolution shall take effect and be in force after its passage. PASSEDAA;ND APPROVED THIS 14TH DAY OF ATTEST: Laven'i LaVe•, ,City -'Se rotary APPROVED amuel W. Wahl, City Engineer APP� . Fred 0. Senter', Jr., City At e - /'` 1967. POrter 2-6411 P. O. Box 2000 LUBBOCK, TEXAS 79408 September 14, 1967 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, as authorized by a resolution passed on April 27, 1967 and find the improvements on Avenue P from alley North of 70th Place to Loop 289 as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, Samuel W. Wahl City Engineer 1 CONSOLIDATED FINAL ESTIMATE G G.W.O. 2922 Accepted September 14, 1967 UANTITIES S.Y. L.F. S.Y. S.Y. S.Y. Alley C & G Unit & Paving L.F. Alley Valley Return Removal Sub -Unit Location 9" Base C & G Return Gutter Removal 2113-1 Avenue P from 3' S. of SPL of 2,892.12 615.70 11.11 22.78 11.11 63.2 alley N. of 70th P1. to 3' S. of NPL of Loop 289 -- TOTALS 2,892.12 615.70 11.11 22.78 11.11 63.2 COST ESTIMATE 2,892.12 S.Y. Paving 6" Base 615.70 L.F. Curb & Gutter 11.11 S.Y. Alley Return 22.78 S.Y. Valley Gutter 11.11 S.Y. Alley Return Removal 63.2 L.F. C & G Removal COST DISTRIBUTION @ $1.60 $ 4,627.39 @ $1.55 954.34 @ $6.00 66.66 @ $6.25 142.37 @ $1.00 11.11 @ $1.00 63.20 CONTRACT COST $ 5,865.07 Property City Escrow Unit & Contract Owner to to be Sub -Unit Cost Cost Contractor Released 2113-1 $ 5,865.07 2,401.83 1,852.55 1,610.69