HomeMy WebLinkAboutResolution - 2388 - Accept Street Improvements-Appian Corporation-1983 Street Maintenance Program - 08_14_1986Resolution #2388
August 14, 1986
Agenda Item #24
JWF:da
RESOLUTION
RESOLUTION ACCEPTING STREET MAINTENANCE IMPROVEMENTS ON
PORTIONS OF CITY STREETS AS DESCRIBED BELOW:
WHEREAS, the City of Lubbock awarded a contract April 14,
1983, authorizing the construction of street maintenance
improvements by Appian Corporation, on the following:
1983 Maintenance Repair Program Contract "C"
STREET
Indiana Avenue
Indiana Avenue
E/2 Indiana Avenue
Part of Indiana
Indiana Avenue
Indiana Avenue
Indiana Avenue
Memphis Avenue
24th Street
21st Street
FROM:
SLL of 34th Street
NPL of 38th Street
NLL of 44th Street
SLL of 50th Street
Alley N of 58th St
1/2 Blk N of 62nd
SPL of 64th Street
NLL of 50th Street
WPL of Peoria Avenue
WLL of Indiana Ave.
TO:
SPL of 35th Street
NPL of 41st Street
NLL of 50th Street
SPL of 64th Street
Alley S of 58th St
1/2 Blk S of 62nd
SPL of 67th Street
NPL of 48th Street
VG E of Peoria Ave
ELL of Memphis Ave
AND WHEREAS, the improvements upon the said portions of
the City streets have been inspected and found to have been
constructed according to the approved plans and
specifications; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
SECTION 1. THAT the improvements on said portions of the
City streets BE and the same are hereby accepted and the City
Engineer BE and he is authorized to direct the final payment
to the Contractor in the amount of $49,031.18.
SECTION 2. THIS resolution shall take effect and be in
force after this passage.
PASSED AND APPROVED this 14th day of August , 1986.
//c - /or,-;w
B.C. McMINN, MAYOR
ATTEST:
Randtte Boyd, City Sem
APPROVED AS TO CONTENT:
L rry Hqflman, Cit y/Engineer
APPROVIO AS TO FORM:
q fi-I It"'
J. Woo/kth Fullingim,-Assista
City Attorney
-2-
a
w,
' resolution #23$$ -
r
`MONTHLY ESTIMATE
�Y 'O� L.UBB�CK
Probe{ Contract "C'r - 19 $3 Maznt en2�nis Repair'rogran[ Protect No: _ Contract "C"
ConiracdrAppian Corp.
_. ..
.r
Es N ' 7 &Final
AddnIss � 0 Bssx i�10
r
855
,
,229 '0>3
ya
SEL d•
Ierevrd, texas 7§d•
✓H;
' Estimate0`
" 1L
$6 1
--.,
...
On Fi:rst estim`ste a1+ti Sinai e3iiihate use acfusl work daEes
UNIT Q
PROJ6Cl'
WORK D07itE
CONTi�[C7' ;
MEA&U`f tE
EST 22UA117T1T11 S
ON COIMI`F i4CT "
P'F1l6E
AMOUNT
3. coltilmt`D : ry de zn
-
.laps icludn ''re= rocess'ing
the.:existin cali;the base crr-
ecting soft if tmsaible sub- xati
prigs ad facie cda attd:1,_.,
ilute eaiiyls%on at •the -rate p f
.. .
ga o ft per square yard :'of'
surface, `czsz#tp- ete:in place peg '
square, q XaY ..
4 , 1-1 f 2" cottt5acted. 't`D `iv e "C"
S Y ..
1�00;
4.94
Asphalts conere.e; axing
Taq''`with'.crtistexsi stoke or
ed orav-3: ILJth ,a ;�ili3fil O
r
,
3� o drus"e ade includ�t g
1
rime-.an'd tack coat and .:a 1:2
dilute emtilSion atf the rate of
_ .i0 gall'on..per square yard...... .
5. As _ vr!
36,818
36,555
2
47,155.95
+3% rubber an lication of 0'.25
gallons/S.Y. for course 1,I to
the existing surface includin
furtishii ,' cieaiiirig and a 1 i
per oration.
6. Asphalt..:7C-5 0ol erized as- `
GAL . '
51, 726
47,995
1.29
61 913.55
phalt:+3%.. rubber)-apglieation..
_ .
_...
Of 0.35:gallons per square yard
for course ,2 applied to exist-
ing surface including f urnishing}`
cleani.n 'and. a PP1yingr I°.
x
APPROVED:
F,>r Enrtr's nt.re"
Total Amount of Work Done ....... S
Less 5 % Retained ined S
£agineer ' Oats
I
.
Difference . S
Less Special Deduction .. . . S
chewed. by: ..i
•'.:.��
OePt. Head_ Date'.. ..
1
i
Less Liquidated. Damage
Less Previous PaVmenis..:. ... S
0114061 Date ''
Amount Due this Estimate....::... $
No Text
No Text
1
Resolution #2388
.
Project: Car#trat "C" I983
J :1. ;F y ;•• 4•: A -: is .. „
Maintenance epair 1?rogra'tt ` Contract "YC"
dd
Pro -
sect o
]
-i t -' yy..i.h3.'. 6�Y _�''� �`'`a1v ._'"yF:A.4 'X -a' '� � ..'
Contractor `Avpian Cory. io 7 &Fin
Esti al
�. .� r..r...:_
sr M
Address, P': $ox 1110
Contract $ 8$
t , ,•r0
3_ }' •S `v: ; jP` P S.S G x yyV.yx ,'
Estimate November
Peno� from 30
, 19� to duly 31
On First estLrnaea atttl trim estimate 6ss W'drk dates`
ITEM
UNl OF
ppO CT.
(5AK D�Ne
CONTRACT
IufT
EASURE
ES.QiliilCITITiS
ON GONTFiAG"r,;
pgICE
AIV�OCyF1t
. 16. Re-sti facin g includin .'removal .':
: "
;. 500
28
6.0'
3843.9
and disppsal ot" existing as-'
phalt surface d"re-paving tit
caches"o type C hot.
II117C:; olA a 'C)7 a ass, CO,TIIp ete
,.
in p ace ,per.suare. ya a,
_
17 . Additional calic Ze ba` e b
c
552
6 .~00_;..
3312.00
used grit '' item 3 at t e >rn .. e
` ' S..
optio... `includi rocessin .
" comp n plade. er, cub�.c .. "ar
• `.
Y
J
1$ . E. tra Gr de' 2'
r.
3 7.50
t crush d s'c I t over
" pile after all` two=rouse as-
halt surface zs.com leted in -
eluding' -loading haullalz to the
..
City of Lu`bbock storage ,lot at
' Municipal ;iI1, complete per
cubic vard delivered at
s tockt? ile
19. Two (2)Jsack.'c�ment stabilized
10
32 50
325.00 .
caliche`base:to be used in. back
fil:of.sub rade..tha.t cannot be .
stabilized with base material,
1
"
'. at I cations.dcai aced and
{ approved by the Engineer; com-
plete in place; per cubic yard;
,�2.61
20. Reinforced concete 3000 7da
S.Y.
SO®
35.53
28.50
101
high early) median 6" in'thi.ckness
Median Re
oval only:
4 00 Y
per square yard,: 1':
-:
71.1 X
41. 00j
2"84.40 .
APPROVED:
Fnr FF-� S Oftwe ...
Total Amount of Work Done . $
C3,cu,a;ions ov[
_....
N ..
Less 5 o Retained ..: S .
Engineer' ' Oate
Di ffe, ence . S.
....
Less Special Deduction ... , .: -,
..
.. ,. -.:
oeot. Hato oats
{
Less Liquidated Damage :. S
l
_
Less, Previous Payments. , . ..'S
o+r.eror .oats. . ,.
Amount Due, this. Estimate $
MONTHLY ESTIMATE
CITY OF-' LUBBOCK
Resolution #2388
G
Project: Contract "C" — 1983 Maintenance Repair Program
Contractor: Appian Corp.
Address: P . 0. Box 1110
Hereford, Texas 79045
Project No. Contract "C"
Estimate No. 7 & Final
Contract $ 865, 229.00
Estimate Period From November 30 19 83 to July 31 r 1g 86
On First estimate and final estimate use actual work dates
ITEM
UNIT OF
MEASURE
PROJECT
EST. QUANTITIES
WORK DONE
ON CONTRACT
CONTRACT
PRICE
AMOUNT
STOCKPILE QUANTITIES:
Item No. 10-Gr. 2 Pre -coated
C.Y.
2,484.66
2,484.66
29.00
72.055.14
Aggregate
Item No. 9-Gr. 4 Pre -Coated
C.Y.
1,673.55
270.23
29.00
2,836.67
crushed gravel
Remarks
Less Special Deductions
$13,4.09.60 for resurfacing (1—
/2" Type
C Hot Mix
Indiana — 34th to 35th
APPROVED:
—J,
For En is Office
Total Amount of Work Done ....... $ 761, 481.15
Less 5 % Retained ............. $
Difference ................... $
Less Special Deduction ........... $ 13, 409.60
Less Liquidated Damage ......... $
Less Previous Payments. $ 699, 040.37
Amount Due this Estimate........ , $49,031.13
Calculations by,
74�
Enginee Date
�
Checked by:
Dept. ead Date
biretta / Date
0