Loading...
HomeMy WebLinkAboutResolution - 051167B - Pavement Improvements - Killgore Construction Co - Subdivider Of Tech Village - 05_11_1967e 70 RESOLUTION �^ RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Tech Village, Lot C, made arrangements with Killgore Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordi- nance prior to the recording of the subdivision plat of Tech Village, Lot C, including the following streets: The removal of street stubs and alley returns on Elgin Avenue, Flint Avenue and 3rd Street around Lot C, Tech Village, known and designated as New Subdivision Unit Number 1686. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE,, BE IT RESOLVED BY THE CITY OF LUBBOCK,, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby r^ authorized to direct the payment of the City's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. APPR �.:,, ' amuel W. Wah , City Engineer APP Fred 0.' Senter, Jr., City A o ey 140-1 10 r -04 PORTER 2-6411 BOX 2000 Honorable Mayor and City Council Lubbock, Texas Gentlemen: LUBBOCK. TEXAS 79406 May 11, 1967 I have examined the paving improvements constructed by Killgore Construction Co., paving contractor, under their contract with the subdividers of Tech Village, Lot C, and find the improvements on Elgin Avenue, Flint Avenue and 3rd Street around said Lot C as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yo s very t 4amuel W. Wah City Engineer CONSOLIDATED FINAL ESTIMATE TECH VILLAGE LOT C Accepted May 11, 1967 UANTITIES S.Y. S.Y. S.Y. S.Y. L.F. Unit & Paving Paving L.F. Alley Valley C & G Sub -.Unit Location Removal 61" Base C & G Return Gutter Removal Removal Removal NS 1686 Removal of street stubs and alley returns on Elgin Ave., Flint Ave. and 3rd Street around Lot C, Tech Village TOTALS COST ESTIMATE 116.89 S.Y. Paving Removal 178.31 S.Y. Paving 611 Base 228.10 L.F. Curb & Gutter 30.45 S.Y. Alley Return Removal 31.56 S.Y. Valley Gutter Removal 222.34 L.F. Curb & Gutter Removal COST DISTRIBUTION 116.89 178.31 228.10 30.45 31.56 222.34 116.89 178.31 @ $1.00 @ $2.00 @ $2.00 @ $4.00 @ $4.00 @ $1.00 228.10 CONTRACT COST Unit & Contract Prepaid Sub -Unit Cost Paving NS 1686 $ 1400.08 $ 1400.08 30.45 31.56 222.34 $ 116.89 356.62 456.20 121.79 126.24 222.34 $ 1,400.08