RESOLUTION
�^ RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Tech Village, Lot C, made arrangements with
Killgore Construction Company for the construction of paving improvements on
certain streets dedicated in said subdivision under the provisions of said Ordi-
nance prior to the recording of the subdivision plat of Tech Village, Lot C,
including the following streets:
The removal of street stubs and alley returns on Elgin Avenue, Flint Avenue and
3rd Street around Lot C, Tech Village, known and designated as New Subdivision
Unit Number 1686.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE,, BE IT RESOLVED BY THE CITY OF LUBBOCK,, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
r^ authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
APPR �.:,,
'
amuel W. Wah , City Engineer
APP
Fred 0.' Senter, Jr., City A o ey
140-1
10
r
-04
PORTER 2-6411
BOX 2000
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
LUBBOCK. TEXAS 79406
May 11, 1967
I have examined the paving improvements constructed by Killgore
Construction Co., paving contractor, under their contract with the
subdividers of Tech Village, Lot C, and find the improvements on Elgin
Avenue, Flint Avenue and 3rd Street around said Lot C as listed on the
final estimate sheet to have been completed in accordance with the plans
and specifications and recommend that you accept the improvements on said
streets and avenues, authorizing payment to the contractor the amount
shown on the attached consolidated final estimate sheet as due them by the
City of Lubbock.
Yo s very t
4amuel W. Wah
City Engineer
CONSOLIDATED FINAL ESTIMATE
TECH VILLAGE
LOT C
Accepted May 11, 1967
UANTITIES
S.Y. S.Y. S.Y. S.Y. L.F.
Unit & Paving Paving L.F. Alley Valley C & G
Sub -.Unit Location Removal 61" Base C & G Return Gutter Removal
Removal Removal
NS 1686 Removal of street stubs
and alley returns on
Elgin Ave., Flint Ave.
and 3rd Street around Lot
C, Tech Village
TOTALS
COST ESTIMATE
116.89 S.Y. Paving Removal
178.31 S.Y. Paving 611 Base
228.10 L.F. Curb & Gutter
30.45 S.Y. Alley Return Removal
31.56 S.Y. Valley Gutter Removal
222.34 L.F. Curb & Gutter Removal
COST DISTRIBUTION
116.89 178.31 228.10 30.45 31.56 222.34
116.89 178.31
@ $1.00
@ $2.00
@ $2.00
@ $4.00
@ $4.00
@ $1.00
228.10
CONTRACT COST
Unit & Contract Prepaid
Sub -Unit Cost Paving
NS 1686 $ 1400.08 $ 1400.08
30.45 31.56 222.34
$ 116.89
356.62
456.20
121.79
126.24
222.34
$ 1,400.08