HomeMy WebLinkAboutResolution - 051167A - Street Improvements - High Plains Pavers Inc - GWO 10555 Multiple Locations - 05_11_1967!� 11 RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS AS LISTED BELOW AND
ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various alley improvement
ordinances and resolutions and entered into contract with High Plains Pavers, Inc.
(G.W.O. 10555) for the making and construction of alley improvements on portions of
numerous alleys in said City including among others the following:
The East-West and North -South alley between 44th Street and 45th Street from its
intersection with the West Property Line of Avenue P West and South to its inter-
section with the North Property Line of 45th Street known and designated as Sub-Uni
Number 26 of Unit Number A-391.
The North -South alley between Avenue H and Avenue G from its intersection with a
line 13 feet North of the South Property Line of 4th Street to its intersection wit
the North Property Line of 5th Street known and designated as Sub -Unit Number 2 of
Unit Number A-392.
AND WHEREAS, the improvements upon the said portions of the abovementioned
alleys have been inspected and found to have been constructed in accordance with
terms of said contract (G.W.O. 10555).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys be
and the same are hereby accepted, and the City Engineer be and he is hereby
authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed to
execute and deliver certificates in evidence of the assessments levied against the
parcels of property abutting upon the said portions of the alleys listed above and
against the owners of such property in accordance with law and in the manner
provided in said contract, and the proceedings with reference to said improvements
and assessments where such assessments were levied.
1� III.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS "In DAY C" ""' '" "
ATTEST:.
Lavenia;Lowe, Ut S retary
t i
APPR 'IED:
W4hl! City
red 0. Senter, Jr., Ci /Attorney
e-1
• 7 _1.1r_,
PORTER 2-6411
BOX 2000
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
LUBBOCK,TEXAS 7 B 4 0 B
May 11, 1967
I have examined the paving improvements constructed by High Plains
Pavers, Inc., paving contractor, under their contract dated November 22,
1966, designated as G.W.O. 10555 and find the improvements on the North -
South alley between Avenue H & Avenue G from 4th Street to 5th Street and
the East-West and North -South alley between 44th Street and 45th Street
from Avenue P West and South to 45th Street as listed on the final estimate
and assessment sheet to have been completed in accordance with the plans
and specifications and recommend that you accept the improvements on said
alleys, authorizing payment to the contractor the amount shown on the
attached consolidated final estimate sheet as due them by the City of Lubbock
and issue assignable certificates against property owners for the respective
amounts shown on the attached final assessment sheets as being due against
them and their respective properties.
Yo rs very y
amuel W. ahl
City Engineer
CONSOLIDATED FINAL, ESTIMATE
GWO 10555
Accepted May 11, 1967
UANTITIES
S.Y.Alley
L.F.
S.Y.
Paving out-
L.F.
Unit & C & G
Alley
side RR
Railroad
Sub -Unit Location
Paving
Section
Section
A-391-26 The E-W & N-S alley between
514.30
44th St. & 45th St. from the
WPL of Ave. P West & South to
the NPL of 45th St.
A-392-2 The N-S alley between Ave. H 27.85
387.08
322.50
& Ave. G from 13' N. of the SPL
of 4th St. to the NPL of 5th St.
Totals 27.85
514.30
387.08
322.50
COST ESTIMATE
27.85 L.F. Curb & Gutter @ 1.85 $
51.52
514.30 S.Y. Alley Paving @ 6.80
3,497.24
387.08 S.Y. Alley Paving outside RR Section
@ 6.90
2,670.85
322.50 L.F. Railroad Section @ 14.00
4,515.00
CONTRACT COST $10,734.61
COST DISTRIBUTION
Property
City to
Unit & Contract Owner
Contractor
Sub -Unit Cost Cost
NOW
A-391-26 $ 3,497.24
$ 3,393.70
$
103.54
A-392-2 7,237.37
7,077.81
159.56
TOTAL $10,734.61
$10,471.51
$
263.10
A-30.80
Acceptance Date May
11,1967
FINAL PAVING ASSESSMENT
The E-W & N-S Alley
between 44th & 45th Street G.W.O.
10555
CITY OF LUBBOCK
Sheet No.
1 of 1
Width 10 Feet
From the WPL of Ave. P West and
South to the NPL of 45th Street
Sub -Unit
No. 26 of
Unit
No. A-391
Paving
$3.8429362 Rate/L.F.
Total
Owner
Lots
Addition
No.Ft.
Cost
Cost
SOUTH & EAST SIDES
Bertell Jackson
19
Armstrong-Aldredge
182.60
701.72
701.72
Bertell Jackson
20
Armstrong-Aldredge
50.10
192.53
192.53
Bertell Jackson
21
Armstrong-Aldredge
50.10
192.53
192.53
Bertell Jackson
22
Armstrong-Aldredge
50.00
192.15
192.15
Bertell Jackson
23
Armstrong-Aldredge
100.00
384.29
384.29
NORTH & WEST SIDES
Lubbock Town House, Inc.
The South 150' of
Lot 1 Town House
150.00
576.44
576.44
Medlock Wellbuilt Homes,
Inc. 6
Armstrong-Aldredge
50.10
192.53
192.53
Medlock Wellbuilt Homes,
Inc. 5
Armstrong-Aldredge
50.10
192.53
192.53
Medlock Wellbuilt Homes,
Inc. 4
Armstrong-Aldredge
50.10
192.53
192.53
First Church of God
3
Armstrong-Aldredge
50.00
192.15
192.15
First Church of God
2
Armstrong-Aldredge
50.00
192.15
192.15
First Church of God
1
Armstrong-Aldredge
50.00
192.15
192.15
TOTAL PROPERTY OWNER COST
$ 3,393.70
CITY'S SHARE
278.40
TOTAL FINAL SUB UNIT COST
$ 3,672.10
A-30.74
Acceptance Date May 11, 1967
G.W.O. 10555
FINAL PAVING ASSESSMENT
The N-S
Alley between Ave.
H & Ave. G
Sheet No. 1 of 2
CITY OF LUBBOCK
Sub -Unit No. 2 of
Width 20 Feet
From 13' N.
of the SPL of 4th St. to the NPL of 5th Street
Unit No. A-392
Paving
Blk.
$4.0857689 Rate/L.F.
Total
Owner
Lots
No.
Addition
No. Ft.
Cost
Cost
EAST SIDE
N. A. Cox
24
9
Original
Town
26.00
106.23
106.23
N. A. Cox
23
9
Original
Town
26.00
106.23
106.23
N. A. Cox
22
9
Original
Town
26.00
106.23
106.23
N. A. Cox
21
9
Original
Town
26.00
106.23
106.23
N. A. Cox
20
9
Original
Town
26.00
106.23
106.23
B. C. Spratt
19
9
Original
Town
26.00
106.23
106.23
B. C. Spratt
18
9
Original
Town
26.00
106.23
106.23
B. C. Spratt
17
9
Original
Town
26.00
106.23
106.23
B. C. Spratt
16
9
Original
Town
26.00
106.23
106.23
B. C. Spratt
15
9
Original
Town
26.00
106.23
106.23
NO ASSESSMENT
14 &
13 9
Original
Town
NO ASSESSMENT
WEST SIDE
Hugh B. Roberson
12
9
Original
Town
26.00
106.23
106.23
Lowrimore Estate, Inc.
11
9
Original
Town
26.00
106.23
106.23
Lowrimore Estate, Inc.
10
9
Original
Town
26.00
106.23
106.23
N..A. Cox
9
9
Original
Town
26.00
106.23
106.23
N. A. Cox
8
9
Original
Town
26.00
106.23
106.23
A-30.74
Acceptance Date May 11, 1967
G.W.O. 10555
FINAL PAVING ASSESSMENT
The N-S Alley
between
Ave. H &
Ave. G
Sheet No. 2
of 2
CITY OF LUBBOCK
Sub -Unit No.
2 of
Width 20 Feet
From 13' N. of the SPL of
4th St.
to the NPL of 5th
St.
Unit No.
A-392
Paving
Blk.
$4.0857689 Rate/L.F.
Total
Owner
Lots
No.
Addition
No. Ft.
Cost
Cost
WEST SIDE CONTD.
N. A. Cox
.7
9
Original
Town
26.00
106.23
106.23
N. A. Cox
6
9
Original
Town
26.00
106.23
106.23
J. Penrod Toles
5
9
Original
Town
26.00
106.23
106.23
Mrs. Ira N. Barnett
4
9
Original
Town
26.00
106.23
106.23
Ed Barnett
3
9
Original
Town
26.00
106.23
106.23
Ed Barnett
2
9
Original
Town
26.00
106.23
106.23
Ed Barnett
1
9
Original
Town
26.00
106.23
106.23
Panhandle and Santa Fe
Road bed, ties, rails and
322.5 L.F. of reinforced concrete
4740.75
4,740.75
Railway Co.
other appurtenances between
railroad
section
@ $14.70/L.F.
the rails and two (2) feet
either side thereof
TOTAL PROPERTY OWNER COST $ 7,077.81
CITY`S SHARE 521.43
TOTAL FINAL SUB UNIT COST $ 7,599.24