Loading...
HomeMy WebLinkAboutResolution - 051167A - Street Improvements - High Plains Pavers Inc - GWO 10555 Multiple Locations - 05_11_1967!� 11 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various alley improvement ordinances and resolutions and entered into contract with High Plains Pavers, Inc. (G.W.O. 10555) for the making and construction of alley improvements on portions of numerous alleys in said City including among others the following: The East-West and North -South alley between 44th Street and 45th Street from its intersection with the West Property Line of Avenue P West and South to its inter- section with the North Property Line of 45th Street known and designated as Sub-Uni Number 26 of Unit Number A-391. The North -South alley between Avenue H and Avenue G from its intersection with a line 13 feet North of the South Property Line of 4th Street to its intersection wit the North Property Line of 5th Street known and designated as Sub -Unit Number 2 of Unit Number A-392. AND WHEREAS, the improvements upon the said portions of the abovementioned alleys have been inspected and found to have been constructed in accordance with terms of said contract (G.W.O. 10555). THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portions of the alleys listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. 1� III. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS "In DAY C" ""' '" " ATTEST:. Lavenia;Lowe, Ut S retary t i APPR 'IED: W4hl! City red 0. Senter, Jr., Ci /Attorney e-1 • 7 _1.1r_, PORTER 2-6411 BOX 2000 Honorable Mayor and City Council Lubbock, Texas Gentlemen: LUBBOCK,TEXAS 7 B 4 0 B May 11, 1967 I have examined the paving improvements constructed by High Plains Pavers, Inc., paving contractor, under their contract dated November 22, 1966, designated as G.W.O. 10555 and find the improvements on the North - South alley between Avenue H & Avenue G from 4th Street to 5th Street and the East-West and North -South alley between 44th Street and 45th Street from Avenue P West and South to 45th Street as listed on the final estimate and assessment sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said alleys, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock and issue assignable certificates against property owners for the respective amounts shown on the attached final assessment sheets as being due against them and their respective properties. Yo rs very y amuel W. ahl City Engineer CONSOLIDATED FINAL, ESTIMATE GWO 10555 Accepted May 11, 1967 UANTITIES S.Y.Alley L.F. S.Y. Paving out- L.F. Unit & C & G Alley side RR Railroad Sub -Unit Location Paving Section Section A-391-26 The E-W & N-S alley between 514.30 44th St. & 45th St. from the WPL of Ave. P West & South to the NPL of 45th St. A-392-2 The N-S alley between Ave. H 27.85 387.08 322.50 & Ave. G from 13' N. of the SPL of 4th St. to the NPL of 5th St. Totals 27.85 514.30 387.08 322.50 COST ESTIMATE 27.85 L.F. Curb & Gutter @ 1.85 $ 51.52 514.30 S.Y. Alley Paving @ 6.80 3,497.24 387.08 S.Y. Alley Paving outside RR Section @ 6.90 2,670.85 322.50 L.F. Railroad Section @ 14.00 4,515.00 CONTRACT COST $10,734.61 COST DISTRIBUTION Property City to Unit & Contract Owner Contractor Sub -Unit Cost Cost NOW A-391-26 $ 3,497.24 $ 3,393.70 $ 103.54 A-392-2 7,237.37 7,077.81 159.56 TOTAL $10,734.61 $10,471.51 $ 263.10 A-30.80 Acceptance Date May 11,1967 FINAL PAVING ASSESSMENT The E-W & N-S Alley between 44th & 45th Street G.W.O. 10555 CITY OF LUBBOCK Sheet No. 1 of 1 Width 10 Feet From the WPL of Ave. P West and South to the NPL of 45th Street Sub -Unit No. 26 of Unit No. A-391 Paving $3.8429362 Rate/L.F. Total Owner Lots Addition No.Ft. Cost Cost SOUTH & EAST SIDES Bertell Jackson 19 Armstrong-Aldredge 182.60 701.72 701.72 Bertell Jackson 20 Armstrong-Aldredge 50.10 192.53 192.53 Bertell Jackson 21 Armstrong-Aldredge 50.10 192.53 192.53 Bertell Jackson 22 Armstrong-Aldredge 50.00 192.15 192.15 Bertell Jackson 23 Armstrong-Aldredge 100.00 384.29 384.29 NORTH & WEST SIDES Lubbock Town House, Inc. The South 150' of Lot 1 Town House 150.00 576.44 576.44 Medlock Wellbuilt Homes, Inc. 6 Armstrong-Aldredge 50.10 192.53 192.53 Medlock Wellbuilt Homes, Inc. 5 Armstrong-Aldredge 50.10 192.53 192.53 Medlock Wellbuilt Homes, Inc. 4 Armstrong-Aldredge 50.10 192.53 192.53 First Church of God 3 Armstrong-Aldredge 50.00 192.15 192.15 First Church of God 2 Armstrong-Aldredge 50.00 192.15 192.15 First Church of God 1 Armstrong-Aldredge 50.00 192.15 192.15 TOTAL PROPERTY OWNER COST $ 3,393.70 CITY'S SHARE 278.40 TOTAL FINAL SUB UNIT COST $ 3,672.10 A-30.74 Acceptance Date May 11, 1967 G.W.O. 10555 FINAL PAVING ASSESSMENT The N-S Alley between Ave. H & Ave. G Sheet No. 1 of 2 CITY OF LUBBOCK Sub -Unit No. 2 of Width 20 Feet From 13' N. of the SPL of 4th St. to the NPL of 5th Street Unit No. A-392 Paving Blk. $4.0857689 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost EAST SIDE N. A. Cox 24 9 Original Town 26.00 106.23 106.23 N. A. Cox 23 9 Original Town 26.00 106.23 106.23 N. A. Cox 22 9 Original Town 26.00 106.23 106.23 N. A. Cox 21 9 Original Town 26.00 106.23 106.23 N. A. Cox 20 9 Original Town 26.00 106.23 106.23 B. C. Spratt 19 9 Original Town 26.00 106.23 106.23 B. C. Spratt 18 9 Original Town 26.00 106.23 106.23 B. C. Spratt 17 9 Original Town 26.00 106.23 106.23 B. C. Spratt 16 9 Original Town 26.00 106.23 106.23 B. C. Spratt 15 9 Original Town 26.00 106.23 106.23 NO ASSESSMENT 14 & 13 9 Original Town NO ASSESSMENT WEST SIDE Hugh B. Roberson 12 9 Original Town 26.00 106.23 106.23 Lowrimore Estate, Inc. 11 9 Original Town 26.00 106.23 106.23 Lowrimore Estate, Inc. 10 9 Original Town 26.00 106.23 106.23 N..A. Cox 9 9 Original Town 26.00 106.23 106.23 N. A. Cox 8 9 Original Town 26.00 106.23 106.23 A-30.74 Acceptance Date May 11, 1967 G.W.O. 10555 FINAL PAVING ASSESSMENT The N-S Alley between Ave. H & Ave. G Sheet No. 2 of 2 CITY OF LUBBOCK Sub -Unit No. 2 of Width 20 Feet From 13' N. of the SPL of 4th St. to the NPL of 5th St. Unit No. A-392 Paving Blk. $4.0857689 Rate/L.F. Total Owner Lots No. Addition No. Ft. Cost Cost WEST SIDE CONTD. N. A. Cox .7 9 Original Town 26.00 106.23 106.23 N. A. Cox 6 9 Original Town 26.00 106.23 106.23 J. Penrod Toles 5 9 Original Town 26.00 106.23 106.23 Mrs. Ira N. Barnett 4 9 Original Town 26.00 106.23 106.23 Ed Barnett 3 9 Original Town 26.00 106.23 106.23 Ed Barnett 2 9 Original Town 26.00 106.23 106.23 Ed Barnett 1 9 Original Town 26.00 106.23 106.23 Panhandle and Santa Fe Road bed, ties, rails and 322.5 L.F. of reinforced concrete 4740.75 4,740.75 Railway Co. other appurtenances between railroad section @ $14.70/L.F. the rails and two (2) feet either side thereof TOTAL PROPERTY OWNER COST $ 7,077.81 CITY`S SHARE 521.43 TOTAL FINAL SUB UNIT COST $ 7,599.24