HomeMy WebLinkAboutResolution - 041367A - Street Improvements - High Plains Pavers Inc - GWO 10555 Multiple Locations - 04_13_19671t RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with High Plains Pavers, Inc. (G.W.O. 10555) for the making and construction of alley improvements on portions of numerous alleys in said City including among others the following: The north -south alley between Avenue U and Uvalde Avenue from its intersection with a line 20.5 feet south of the north property line of 4th Street to its intersection with the north property line of the alley north of 4th Street (West Leg) known and designated as Sub -Unit Number 3 of Unit Number A-391. The east -west alley between 7th Street and 8th Street from its intersection with a line 22 feet west of the east property line of Avenue Q to its intersection with the east line of Lot 10, Norton Addition, known and designated as Sub -Unit Number 8 of Unit Number A-391. AND WHEREAS, the improvements upon the said portions of the abovementioned alleys have been inspected and found to have been constructed in accordance with terms of said contract (G.W.O. 10,555). II THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upon the said portions of the alleys listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. passage. III. This resolution shall take effect and be in force from and after its PASSED AND APPROVED THIS 13TH DAYrQF_APRXL,`V67. ATTEST W• ] R ers, 1;7kayor �f �., Laven a Lowe, Cit ecretary APPR1.- /9amuel W. Wahl, City Engineer_ APPR D1 Fred 0. Senter, Jr., CityjAktorney �uT ' I IiI• lil _ w PORTER 2-6411 BOX 2000 Honorable Mayor and City Council Lubbock, Texas Gentlemen: LUBBOCK, TEXAS 7 L 4 0 B April 13, 1967 I have examined the paving improvements constructed by High Plains Pavers, Inc., paving contractor, under their contract dated November 22, 1966, designated as G.W.O. 10555 and find the improvements on the north -south alley between Avenue U and Uvalde Avenue from 4th Street to the alley north of 4th Street and the east -west alley between 7th Street and 8th Street from Avenue Q to 150' east of Avenue Q as listed on the final estimate and assessment sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said alleys, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock and issue assignable certificates against property owners for the respective amounts shown on the attached final assessment sheets as being due against them and their respective properties. You s very truly, amuel W. Wa 1 City Engineer CONSOLIDATED FINAL ESTIMATE G.W.O. 10555 Accepted April 13, 1967 UANTITIES S.Y. Unit & L.F. Alley Sub -Unit Location C & G Paving A-391-3 The N-S alley between Ave. U and Uvalde 19.65 242.23, Ave. from 20.5' S. of the N.P.L. of 4th St. to the N.P.L. of the alley N. of 4th St. A-391-8 The E-W alley between 7th St. and 8th St. from 22' W. of the EPL of Ave. Q to the E. Line of Lot 10, Norton Addition TOTALS COST ESTIMATE 75.65 L.F. Curb & Gutter @ $1.85 436.11 S.Y. Alley Paving @ $6.80 CONTRACT COST 56.00 193.88 75.65 436.11 $ 139.95 2,965.55 $3,105.50 COST DISTRIBUTION Property City to Unit & Contract Owner Contractor Sub -Unit Cost Cost NOW A-391-3 1,683.52 1,062.18 621.34 A-391-8 1,421.98 1,067.49 354.49 3,105.50 2,129.67 975.83 A-30.73 Acceptance Date April 13,1967 G.W.O. 10555 FINAL PAVING ASSESSMENT The N-S Alley between Ave. U & Uvalde Avenue Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 3 of Width 10 Feet From 20.5' S. of the NPL of 4th St. to the NPL of the E-W alley N. of 4th St. (W.Leg) Unit No. A-391 Paving $3.8429362 Rate/L.F. Total Owner Lots Addition No. Ft. Cost Cost EAST SIDE J. S. Waller . 1 C. D. Crump's Subdivision of Block 9, 49.4 189.84 189.84 J. S. Waller 2 NO ASSESSMENT 3 & 4 WEST SIDE Clara M. Ater The S.29.4' of Lot 21 Clara M. Ater 22, 23 & 24 Roberts & McWhorter Addition C. D. Crump's Subdivision of Block 9, Roberts & McWhorter Addition C. D. Crump's Subdivision of Block 9, Roberts & McWhorter Addition C. D. Crump's Subdivision of Block 9, Roberts & McWhorter Addition C. D. Crump's Subdivision of Block 9, Roberts & McWhorter Addition 49.4 189.84 189.84 NO ASSESSMENT 29.4 112.98 112.98 148.20 569.52 569.52 TOTAL PROPERTY OWNER COST $ 1,062.18 CITY'S SHARE 705.52 TOTAL FINAL SUB UNIT COST $ 1,767.70 A-30.75 Acceptance Date 4-13-67 G.W.O. 10555 , FINAL PAVING ASSESSMENT The E-W Alley between 7th St. & 8th Street Sheet No. 1 of 1 CITY OF LUBBOCK Sub -Unit No. 8 of Width 10 Feet From 22' W. of the EPL of Ave. Q to the E. Line of Lot 10 Norton Addition Unit No. A-391 Total Owner Lots Addition No. Ft. Different Rate Cost Cost NORTH SIDE Charles L. Cobb 10 Norton Addition 50.00 2.1349645 106.75 106.75 Mrs. Iva Edington & Homer L. Hensley 11 Norton Addition 50.00 3.8429362 192.15 192.15 Mrs. Iva Edington & Homer L. Hensley 12 Norton Addition 50.00 3.8429362 192.15 192.15 SOUTH SIDE D. B. Gordon 13, 14 & 15 Norton Addition 150.00 3.8429362 576.44 576.44 TOTAL PROPERTY OWNER COST $ 1,067.49 CITY'S SHARE 425.59 TOTAL FINAL SUB UNIT COST $ 1,493.08