HomeMy WebLinkAboutResolution - 2266 - Approve Design - HDR Infrastructure - Brownfield Expressway Corridor Plan - 03_13_1986Resolution #2266
March 13, 1986
Agenda Item #10
LJM:cl
RESOLUTION
WHEREAS, the Lubbock Urban Transportation Plan is the official
document for guiding development of expressway and thoroughfare
improvements in the City of Lubbock; and
WHEREAS, the Lubbock Urban Transportation Plan continues to
indicate the need for an expressway corridor along the Brownfield
Highway from Southwest Loop 289 to 4th Street and along 4th Street to
the intersection with Interstate Highway 27; and
WHEREAS, recent consulting engineering studies reconfirmed the
need for this expressway corridor; and
WHEREAS, cooperative studies between the State Department of
Highways and Public Transportation, Texas Tech University, the City of
Lubbock, and consultant engineers have resulted in an acceptable
general plan for this expressway corridor, NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the City Council endorses and approves the Brownfield
Expressway Corridor Plan dated March 5, 1986, prepared by the firm of
H.D.R. Infrastructure Inc. of Dallas, Texas, and further described as
a four -lane expressway with grade separation from Southwest Loop 289
to 19th Street, and a four -lane depressed section from 19th Street to
4th Street and along 4th Street to a point east of University Avenue;
and eastward along a 3rd Street/4th Street corridor to the inter-
section with Interstate Highway 27, which said plan is available in
the office of the Director of Transportation for the City of Lubbock,
Texas.
Passed by City Council this 13th day o
ATTEST:
Ranet�-Boyd , City Secretary
APPROVED AS TO CONTENT:
Jim er ram, Assistant City Manager
APPR D AS TO FORM:
f March , 1986.
AL AN RY , -MAYOR
Laura Monroe sistant City Attorney