HomeMy WebLinkAboutResolution - 092266C - Water_Sewer Improvements - Panhandle Construction Co - Live Oak Addition - 09_22_1966 RESOLUTION
Resolution accepting water and sewer system improvements for Lot A,
Live Oak Addition
WHEREAS, the developer of Lot A, Live Oak Addition has complied with the
provisions of the City of Lubbock Code, Chapter 34, Article 2, by providing the
water and sewer improvements for said addition in accordance with paragraph 61 of
said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $3,752.95 with the
improvements constructed by Panhandle Construction Co. having a value of $3,388.99
as determined by the unit prices established by said Chapter 34, and $328.96 cash
(engineering, wet tie-ins, paving repair, difference in Pro Rata and actual cost)
paid to the City, with Dr. H. E. Cone, the developer, to receive a refund of
$1,601.27 in accordance with Chapter 34 of the Code of the City of Lubbock.
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the City Engineer and said improvements have
been completed in accordance with the City of Lubbock's plans and specifications.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
1. That the improvements be and the same are hereby accepted
as an integral part of the water and sewage system of the
City of Lubbock.
2. That refund of the refundable cost in the amount of
$1,1601.27 be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from
and after its passage.
PASSED AND APPROVED THIS 22ND DAY OF SEPTE R 6.
W. D. Roq, Jr. , ayor
Ate ted:
L venia Lowe, C ty Secretary
4 M
11ppr ed:
__GIGUE%
Samuel W. Wah , Ci y Engineer
Ap ,proved:
Fred 0. Senter, Jr. , Ci tto ney