Loading...
HomeMy WebLinkAboutResolution - 062366B - Pavement Improvements - Kerr Construction Co - N. Loop Industrial Park Addition - 06_23_1966 /V onei -,t 8 i Mow RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF AN AVENUE AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of North Loop Industrial Park Addition, made arrange- ments with Kerr Construction Company for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordi- nance prior to the recording of the subdivision plat of North Loop Industrial Park Addition including the following street: North King Avenue from its intersection with a line 17 feet North of the South Property Line of Loop 289 Northeast to its intersection with the South Line of Lot 7, Block C, North Loop Industrial Park Addition known and designated as New Subdivision Unit Number 1663. AND WHEREAS, the construction of the above improvements on the above- mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance .1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. �^ That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 23RD DAY OF J 19 ems+• . .i k'ae Y W. D. Rogers, May ATTES V1,k` z� Lave "a:Low „ C -5 retry AP VEp: _ amue ahl', City' Engineer red 0. Senter, Jr. , City A riey . F 111 fir « _i x ate` ' 771 rare �,- ;...��: �,...:o..�«: �.- ��� •sue.- -r- Porter 2-6411 P. O. Box 2000 LUBBOCK , TEXAS 79406 June 23, 1966 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, under their contract with the subdividers of North Loop Industrial Park Addition and find the improvements on North King Avenue from Loop 289 to South Line Lot 7, Block C, North Loop Industrial Park Addition as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yo s very t , City Engineer CONSOLIDATED FINAL EST IMP,TE NORTH LOOP INDUSTRIAL PARK ADD. Accepted June 23, 1966 QUANTITIES S.Y. S.Y. S.Y. L.F. Unit & Paving L.F. Alley Valley Reinforced Sub-Unit Location 6" Base C & G Return Gutter C & G NS 1663 N. King Ave. from 17' N. 4,088.71 1,529.15 15.00 25.84 40.00 of the SPL of Loop 289 Northeast to the South Line of Lot 7, Block C, North Loop Industrial Park Addition COST ESTIMATE 4,088.71 S.Y. Paving 6" Base @ $1.48 $ 6,051.28 1,529.15 L.F. Curb & Gutter @ $1.45 2,217.27 40.00 L.F. Reinforced Curb & Gutter @ $1.80 72.00 15.00 S.Y. Alley Return @ $5.50 82.50 25.84 S.Y. Valley Gutter @ $5.95 153.75 CONTRACT COST $ 8,576.80 COST DISTRIBUTION Property Unit & Contract Owner Sub-Unit Cost Cost NS 1663 $ 8,576.80 $ 8,576.80