HomeMy WebLinkAboutResolution - 052666G - Pavement Improvements - WD Turner Construction Co - Tracy Heights Addition - 05_26_1966 RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AND ALLEY AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Tracy Heights Addition Lots 265-308 made
arrangements with W. D. Turner Construction Co. for the construction of paving
improvements on certain streets and alley dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat of
Tracy Heights Addition including the following street and alley:
18th Street from its intersection with the West Lip Line of Chicago Avenue to its
intersection with the East Lip Line of Elkhart Avenue, known and designated as New
Subdivision Unit Number 1612.
Part of the East-West alley between 18th Street and 19th Street and from its inter-
section with a line 318.00 feet East of the East Property Line of Elkhart Avenue to
its intersection with a line 565.75 feet East of the East Property Line of Elkhart
Avenue, known and designated as alley Sub-Unit Number A-371-A.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street and alley was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street and
alley be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City' s portion of the cost and to release
escrow money.
II.
,This .resolution shall take effect and be in force from and after its
passage,
PASSED AND'ATPROVED THIS 26TH DAY OF MAY, 96
u _ ~ «
- W. D. Roger Mayo
ATTES . ,
La eni&.T,owe; Cij� Secretary
APPROVED•
aA'^*
Samuel W. Wahl, City Engineer
AP
Fred 0 Senter, Jr. , Ci eV#orney
•
;Jo
Porter 2-6411
P. O. Box 20M
LUBBOCK , TEXAS 79408
May 26, 1966
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by W. D. Turner
Construction Co., paving contractor, under his contract with the subdividers
of Tracy Heights Addition Lots 265-308 and find the improvements on 18th
Street from Chicago Avenue to Elkhart Avenue and the East-West alley between
18th Street and 19th Street and from 318' East of Elkhart Avenue to 565.75'
East of Elkhart Avenue as listed on the final estimate sheet to have been
completed in accordance with the plans and specifications and recommend that
you accept the improvements on said streets and/or avenues, authorizing
payment to the contractor the amount shown on the attached consolidated final
estimate sheet as due him by the City of Lubbock.
4amuel
ruly ur
W. ahl
City Engineer
SWW:wm
a
CONSOLIDATED FINAL ESTIMATE
TRACY HEIGHTS
LOTS 265-308
Accepted May 26, 1966
QUANTITIES
S.Y. S.Y. S.Y. S.Y.
Unit & Paving L.F. Alley Valley Re-sur-
Sub-Unit Location 6"Base C & G Return Gutter facing
NS 1612 18th Street from the W:Lip Line of 5,109.33 2,950.50 105.84 139.62
Chicago Ave. to the EF",ip Line of
Elkhart Ave.
A-371-A Part of the E-W alley between 18th 275.28
and 19th Streets and from 318' E.
of the EPL of Elkhart Ave. to
565.75' E.of the EPL of Elkhart Ave.
TOTAL 5,109.33 2,950.50 275.28 105.84 139.62
COST ESTIMATE
5,109.33 S.Y. Paving 6" Base @ $1.42 $ 7,255.25
2,950.50 L.F. Curb & Gutter @ $1.37 4,042.19
275.28 S.Y. Alley Return @ $5.50 1,514.04
105.84 S.Y. Valley Gutter @ $5.50 582.12
139.62 S.Y. Resurface @ $0.80 111.70
CONTRACT COST $13,505.30
COST DISTRIBUTION
Unit & Contract Property
Sub-Unit Cost Owner
Cost
NS 1612 11,991.26 11,991.26
A-371-A 1,514.04 1,514.04
TOTAL $ 13,505.30 $ 13,505.30