HomeMy WebLinkAboutResolution - 042866C - Accept Paving Improvements - Kerr Co. - Lots 309-345, Green Lawn Addition - 04_28_1966 00 to YI&
` RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS ANN OR AVENUES AS
LISTED BELOW:
WHEREAS, in conformance with the-paving requirement provisions of City
�j Ordinance 1331, the subdivider of Green Lawn Addition, Lots 309-345, made arrange-
ments with Kerr Construction Co. for the construction of paving improvements on
certain streets dedicated in said subdivision under the provisions of said Ordinanc
prior to the recording of the subdivision plat of Lots 309-345 Green Lawn Addition
including the following streets:
28th Street from its intersection with a line 15 feet East of the East Property
Line of Dover Avenue to its intersection with a line 11 feet East of the West
Property Line of Chicago Avenue known and designated as New Subdivision Unit
Number 1603.
29th Drive from its intersection with a line 16 feet West of the West Property Line
of Chicago Avenue to its intersection with a line 16.3 feet West of the West
Property Line of Dover Avenue and cul-de-sac known and designated as New Subdivisio
Unit Number 1604.
Dover Avenue from its intersection with a line 3 feet South of the South Property
Line of the alley North of 28th Street to its intersection with a line 15 feet
South of the North Property Line of 29th Drive known and designated as New
Subdivision Unit Number 1605.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 28TH DAY OF APRIL, 1966.
Ab �.
W. D. Rogers, Mayo
ATTES
L4 enia'Lowe City secretary
APPVED. C'
amuel 'W: Wahl, City Engineer
APPROVED:
r,ed O. Senter,Jr. , Ci A orney
iI IVI I 1�lyk y ,a Emig
Porter 2-6411
P. O. Box 2000
LUBBOCK , TEXAS 79408
April 28, 1966
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under their contract with the
subdividers of Green Lawn Addition Lots 309-345 and find the improve-
ments on 28th Street from Chicago Avenue to Dover Avenue, Dover Avenue
from the alley North of 28th Street to 29th Drive and on 29th Drive from
Chicago Avenue to Dover Avenue as listed on the final estimate sheet to
have been completed in accordance with the plans and specifications and
recommend that you accept the improvements on said streets and/or
avenues, authorizing payment to the contractor the amount shown on the
attached consolidated final estimate sheet as due them by the City of
Lubbock.
Yo s very ly,
�l W. Wahl
SWW:wm City Engineer
CONSOLIDATED FINAL ESTIMATE
GREEN LAWN ADDITION
LOTS 309 - 345
Accepted April 28, 1966
QUANTITIES
S.Y. S.Y. S.Y. S.Y.
Unit & Paving Paving L.F. Alley Valley
Sub-Unit Location 9" Base 6" Base C & G Return Gutter
NS 1603 28th St. from 15' E. of the 2,955.33 1,726.14 12.00 52.54
EPL of Dover Ave. to Ill E.
of the WPL of Chicago Ave.
NS 1604 29th Drive from 16' W. of
the WPL of Chicago Ave. to
16.3' W. of the WPL of Dover
Ave. & cul-de-sac
Green Lawn 12376.25 767.81 1,007.12 16.85
City 3,179.08
School 1,300.87 723.88
NS 1605 Dover Ave. from 3' S. of 2,852.65 1,594.45 37.28 112.40
the SPL of the alley N. of
28th St. to the N. Lip
Line of 29th Drive
TOTALS 5,856.20 6,575.79 5,051.59 66.13 164.94
COST ESTIMATE
5,856.20 S.Y. Paving (9" Base) @ 1.76 = 10,306.91
6,575.79 S.Y. Paving (6" Base) @ 1.55 102192.47
5,051.59 L.F. Curb & Gutter @ 1.45 = 7,324.81
66.13 S.Y. Alley Return & Drainage Channel @ 4.80 = 317.42
164.94 S.Y. Valley Gutter @ 5.00 = 824.70
28,966.31
COST DISTRIBUTION
Unit & Contract Green'Lawn City to School
Sub-Unit Cost Owner Cost Contractor Cost
NS 1603 7,403.97 7,403.97
NS 1604 14,087.85 5,153.51 52595.18 3,339.16
NS 1605 7,474.49 7,474.49
TOTALS $28,966.31 $ 202031.97 $ 5,595.18 $ 3,339.16