Loading...
HomeMy WebLinkAboutResolution - 042866C - Accept Paving Improvements - Kerr Co. - Lots 309-345, Green Lawn Addition - 04_28_1966 00 to YI& ` RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS ANN OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the-paving requirement provisions of City �j Ordinance 1331, the subdivider of Green Lawn Addition, Lots 309-345, made arrange- ments with Kerr Construction Co. for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinanc prior to the recording of the subdivision plat of Lots 309-345 Green Lawn Addition including the following streets: 28th Street from its intersection with a line 15 feet East of the East Property Line of Dover Avenue to its intersection with a line 11 feet East of the West Property Line of Chicago Avenue known and designated as New Subdivision Unit Number 1603. 29th Drive from its intersection with a line 16 feet West of the West Property Line of Chicago Avenue to its intersection with a line 16.3 feet West of the West Property Line of Dover Avenue and cul-de-sac known and designated as New Subdivisio Unit Number 1604. Dover Avenue from its intersection with a line 3 feet South of the South Property Line of the alley North of 28th Street to its intersection with a line 15 feet South of the North Property Line of 29th Drive known and designated as New Subdivision Unit Number 1605. AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost and to release escrow money. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 28TH DAY OF APRIL, 1966. Ab �. W. D. Rogers, Mayo ATTES L4 enia'Lowe City secretary APPVED. C' amuel 'W: Wahl, City Engineer APPROVED: r,ed O. Senter,Jr. , Ci A orney iI IVI I 1�lyk y ,a Emig Porter 2-6411 P. O. Box 2000 LUBBOCK , TEXAS 79408 April 28, 1966 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, under their contract with the subdividers of Green Lawn Addition Lots 309-345 and find the improve- ments on 28th Street from Chicago Avenue to Dover Avenue, Dover Avenue from the alley North of 28th Street to 29th Drive and on 29th Drive from Chicago Avenue to Dover Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yo s very ly, �l W. Wahl SWW:wm City Engineer CONSOLIDATED FINAL ESTIMATE GREEN LAWN ADDITION LOTS 309 - 345 Accepted April 28, 1966 QUANTITIES S.Y. S.Y. S.Y. S.Y. Unit & Paving Paving L.F. Alley Valley Sub-Unit Location 9" Base 6" Base C & G Return Gutter NS 1603 28th St. from 15' E. of the 2,955.33 1,726.14 12.00 52.54 EPL of Dover Ave. to Ill E. of the WPL of Chicago Ave. NS 1604 29th Drive from 16' W. of the WPL of Chicago Ave. to 16.3' W. of the WPL of Dover Ave. & cul-de-sac Green Lawn 12376.25 767.81 1,007.12 16.85 City 3,179.08 School 1,300.87 723.88 NS 1605 Dover Ave. from 3' S. of 2,852.65 1,594.45 37.28 112.40 the SPL of the alley N. of 28th St. to the N. Lip Line of 29th Drive TOTALS 5,856.20 6,575.79 5,051.59 66.13 164.94 COST ESTIMATE 5,856.20 S.Y. Paving (9" Base) @ 1.76 = 10,306.91 6,575.79 S.Y. Paving (6" Base) @ 1.55 102192.47 5,051.59 L.F. Curb & Gutter @ 1.45 = 7,324.81 66.13 S.Y. Alley Return & Drainage Channel @ 4.80 = 317.42 164.94 S.Y. Valley Gutter @ 5.00 = 824.70 28,966.31 COST DISTRIBUTION Unit & Contract Green'Lawn City to School Sub-Unit Cost Owner Cost Contractor Cost NS 1603 7,403.97 7,403.97 NS 1604 14,087.85 5,153.51 52595.18 3,339.16 NS 1605 7,474.49 7,474.49 TOTALS $28,966.31 $ 202031.97 $ 5,595.18 $ 3,339.16