RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
�i AS LISTED BELOW:
tWHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Live Oak Addition, Lots 128-176, made arrangements
with Pioneer Pavers, Inc. for the construction of paving improvements on certain
streets dedicated in said subdivision under the provisions of said Ordinance prior
to the recording of the subdivision plat of Live Oak AdBlton, Lots 128-176
including the following streets:
The East 1/2 of Gary Avenue (asphalt only) from its intersection with a line
51 feet North of the South Property Line of 66th Street to its intersection with a
line 3 feet South of the South Property Line of the alley South of 69th Street,
known and designated as part of New Subdivision Unit Number 1132.
The West 1/2 of Gary Avenue from its intersection with a line 51 feet North of the
South Property Line of 66th Street to its intersection with a line 3 feet South of
the South Property Line of the alley South of 69th Street, known and designated as
New Subdivision Unit Number 1538.
67th Street from its intersection with a line 15 feet East of the East Property
Line of Hartford Avenue to its intersection with a line 13 feet West of the West
Property Line of Gary Avenue, known and designated as New Subdivision Unit Number
1539.
69th Street from its intersection with a line 15 feet East of the East Property
Line of Hartford Avenue to its intersection with a line 13 feet West of the West
Property Line of Gary Avenue, known and designated as New Subdivision Unit Number
1540.
68th Street from its intersection with a line 13 feet West of the West Property
Line of Gary Avenue to its intersection with the end of the cul-de-sac West of
Gary Avenue, known and designated as New Subdivision Unit Number 1541.
Geneva Avenue from its intersection with a line 15 feet South of the South Property
Line of 69th Street to its intersection with the South Property Line of the alley
South of 69th Street, known and designated as New Subdivision Unit Number 1542.
The East 1/2 of Hartford Avenue (concrete only) from its intersection with a line
15 feet North of the North Property Line of 67th Street to its intersection with a
line 3 feet South of the South Property Line of the alley South of 69th Street,
known and designated as part of New Subdivision Unit Number 1543.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
A" THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
r
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City' s portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 14TH DAY OF OCTOBER, 1965.
Max idmore, Mayor
ATTEST•
tle
Lave is Lowe, Ciq Secretary
APP OVER:
amuel W. Wah , City Engineer
APP
r (J�
Fred 0. Senter, Jr., City 01t
torney
it
i
ftE
§fj + 77
'� 4
r !
zE
P O R T E R , 3 4 9 1
r . 0 a 0 N 2 0 0 0
LUBBOCK , TEXAS 79406
October 14, 1965
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Pioneer
Pavers, Incorporated, paving contractor, under their contract with the
subdividers of Live Oak Addition Lots 128-176 and find the improvements
on 67th Street from Gary Avenue to Hartford Avenue, 68th Street from Gary
Avenue to Hartford Avenue, 69th Street from Gary Avenue to Hartford Avenue,
Gary Avenue from 66th Street to the alley South of 69th Street, Geneva
Avenue from 69th Street to the cul-de-sac South and Hartford Avenue
(concrete east side only) from 67th Street to the alley South of 69th Street
as listed on the final estimate sheet to have been completed in accordance
with the plans and specifications and recommend that you accept the improve-
ments on said streets and/or avenues, authorizing payment to the contractor
the amount shown on the attached consolidated final estimate sheet as due
them by the City of Lubbock.
Yo s very ,
Samuel W. Wah
City Engineer
� A
a ' i
CONSOLIDATED FINAL ESTIMATE
LIVE OAR ADDITION
LOTS 128 - 176
Accepted October 14, 1965
QUANTITIES
S.Y. S.Y.
Unit & Paving L.F. Alley
Sub-Unit Location 6" Base C & G Return
Part of
NS 1132 The East 1/2 of Garr Ave. 2,856.34
(asphalt only) from 51' N. of
the SPL of 66th St. to 3' S.
of the SPL of t e alley S.
of 69th St.
NS 1538 The West 1/2 of Gary Ave. from 2,877.34 1,325.89 46.67
51' N. of the SPL of 66th St.
to 3' S. of the SPL of the alley
S. of 69th St.
NS 1539 67th St. from 15' E. of the 2,040.89 1,148.00
EPL of Hartford Ave. to 13'
W. of the WPL of Gary Ave.
NS 1540 69th St. from 15' E. of the 2,171.65 1,170.54 40.00
EPL of Hartford Ave. to 13'
W. of the WPL of Gary Ave.
NS 1541 68th St. from 13' W. of the 1,770.61 914.49
WPL of Gary Ave. to the W.
end of the cul-de-sac W. of
Gary Ave.
NS 1542 Geneva Ave. from 15' S. of 1,142.35 595.09 12.83
the SPL of 69th St. to the
SPL of the alley S. of 69th
St.
Part of
NS 1543 The East 1/2 of Hartford Ave. 989.11 26.67
(concrete only) from 15' N.
of the NFL of 67th St. to 3'
S. of the SPL of the alley
S. of 69th St.
TOTALS 12,859.18 6,143.12 126.17
COST ESTIMATE
12,859.18 S.Y. Paving @ 1.40 $ 18,002.86
6,143.12 L.F. Curb & Gutter @ 1.40 8,600.37
126,17 S.Y. Alley Return and Drainage Channel @ 4.75 599.31
TOTAL COST $ 27,202.54
COST DISTRIBUTION
Unit & Contract Property Escrow
Sub-Unit Cost Owner to be
Cost Released
Part of
NS 1132 3,998.88 3,998.88
NS 1538 6,106.20 5979.11 127.09
NS 1539 4,464.45 4:464.45
NS 1540 4,869.07 4,869.07
NS 1541 3,759.14 3,759.14
NS 1542 2,493.36 2,493.36
NS 1543 1,511.44 1,511.44
TOTALS $27,202.54 $ 23,076.57 $4,125.97