Loading...
HomeMy WebLinkAboutResolution - 070865K - Pavement Improvements - Pioneer Pavers Inc - Plainsmen Addition - 07_08_1965 V RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES 19 AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Plainsmen Addition, made arrangements with Pioneer Pavers, Inc. for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Plainsmen Addition including the following streets: Peoria Avenue from its intersection with a line 16 feet South of the South Property Line of 54th Street to its intersection with a line 3 feet South of the South Property Line of the alley South of 54th Street, known and designated as New Subdivision Unit Number 1049. West 1/2 of Peoria Avenue from its intersection with a line 16 feet North of the North Property Line of 58th Street to its intersection with a line 3 feet North of the North Property Line of the alley North of 58th Street, known and designated as New Subdivision Unit Number 1348. 55th Street from its intersection with a line 16 feet West of the West Property Line of Peoria Avenue to its intersection with a line 300.0 feet West of the West Property Line of Peoria Avenue, known and designated as New Subdivision Unit Number 1502. 56th Street from its intersection with a line 16 feet West of the West Property Line of Peoria Avenue to its intersection with a line 301.0 feet West of the West Property Line of Peoria Avenue, known and designated as New Subdivision Unit Number 1503. 57th Street from its intersection with a line 16 feet West of the West Property Line of Peoria Avenue to its intersection with a line 303.92 feet West of the West Property Line of Peoria Avenue, known and designated as New Subdivision Unit Number 1504. West 1/2 of Peoria Avenue from its intersection with a line 3 feet South of the South Property Line of the alley North of 55th Street to its intersection with a line 3 feet North of the North Property Line of the alley South of 57th Street, known and designated as New Subdivision Unit Number 1505-A. East 1/2 of Peoria Avenue from its intersection with a line 148 feet South of the South Property Line of 54th Street to its intersection with a line 16 feet North of the North Property Line of 58th Street, known and designated as New Subdivision Unit Number 1505-B. AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City' s port16n of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 8TH DAY OF JULY, 1965. Max idmore, Mayor ATTEST Lav nia Lowe, City ecretary APPROVED: rr� finHickerson, City Engineer : Fred 0. Senter, Jr. , Ci ttorney City of Lubbock WOPOrter 3-3491 916 Texas Avenue Lubbock, Texas July 8, 1965 Honorable Mayor and City Council Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Pioneer Pavers, Inc. , paving contractor, under their contract with the subdividers of Plainsmen Addition and find the improvements on Peoria Avenue from 54th Street to 58th Street, 55th Street, 56th Street, and 57th Street from Peoria Avenue to approximately 300 feet West of Peoria Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, 6john T. Hickerson City Engineer .:a. CONSOLIDATED FINAL ESTIMATE PLAINSMEN ADD,, LOTS 56-83 Accepted July 8, 1965 QUANTITIES S.Y. S.Y. S.Y. Paving L.F. Alley Re-sur- Unit Location 6" Base C & G Return facing NS 1049 Peoria Ave. from 16' S of SPL of 54th St. to 3' S. of SPL of alley S. of 54th St. From Prepaid Paving (Plainsmen) 234.67 140.0 12.22 92.89 School 322.66 132.0 NS 1348 W 1/2 of Peoria Ave. from 16' N. of 323.56 190.0 12.22 NPL of 58th St. to 3' N. of NPL of alley N. of 58th St. From Prepaid Paving (Vaughn Bates Add.) NS 1502 55th St. from 16' W. of WPL of Peoria 1,009.78 568.00 Ave. to 300' W. of WPL of Peoria Ave. NS 1503 56th St. from 16' W. of WPL of Peoria 1,013.37 570.00 Ave. to 301.0' W. of WPL of Peoria (N. Side) NS 1504 57th St. from 16' W. of WPL of Peoria 1,023.75 575.86 Ave. to 303.92' W. of WPL of Peoria Ave. (N. Side) NS -1505-A W 1/2 of Peoria Ave. from 3' S. of 2,015.94 906.81 26.67 SPL of alley N. of 55th St. to 3' N. of NPL of alley S. of 57th St. NS 1505-B E 1/2 of Peoria Ave. from 148' S. of SPL of 54th St. to 16' N. of NPL of 58th St. School 2,679.11 1,096.0 Sub-Totals Plainsmen Add. 5,062.84 2,620.69 26.67 Prepaid Paving (Plainsmen) 234.67 140.0 12.22 92.89 Christ the King Add. 3,001.77 1,228.0 Vaughn Bates Add.(Prepaid Paving) 323.56 190.0 12.22 TOTALS 8,622.84 4,178.69 51011 92.89 COST ESTIMATE 8622.84 S.Y. Paving @ 1.43 $ 12,330.66 92.89 S.Y. Resurface @ 1.00 92.89 4178.69 L.F. C & G @ 1.40 55,850.17 51.11 S.Y. Alley Returns @ 4.50 230.00 CONTRACT'''COST $ 18,503.72 COST DISTRIBUTION Contract Plainsmen Christ the Escrow Unit Cost Add. King Add. to be Released N9 1049 1,325.66 646.20 633.58 NS 1348 783.68 829.56 NS 1502 2,239.19 2,239.19 NS 1503 2,247.15 2,247.15 NS 1504 22270.17 22270.17 NS 1505-A 4,272.34 4,272.34 NS 1505-B 5,365.53 5,365.53 Sub-Totals Plainsmen Add. llp028.85 Prepaid Paving (Plainsmen) 633.58 Christ the King Add. 6,011.73 Vaughn Bates .(Prepaid Paving) 829.56 TOTALS 18,503.72 11,028.85 6,011.73 1,463.14