HomeMy WebLinkAboutResolution - 070865H - Pavement Improvements - Pioneer Pavers Inc - Burlington Industrial Area - 07_08_1965 c
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
iU WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Burlington Industrial Area made arrangements
with Pioneer Pavers, Inc. for the construction of paving improvements on certain
street dedicated in said subdivision under the provisions of said Ordinance prior
�i to the recording of the subdivision plat of Burlington Industrial Area including
the following street:
Elm Avenue from a line 13.50 feet North of the North Property Line of 58th Street
to the South Line of Lot 2, Installment Number 3, Burlington Industrial Area,
known and designated as Unit Number 2125.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer, and said
improvements have been completed and have been inspected and found to have been
constructed in accordance with City specifications and in accordance with the
provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street be
r., and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 8TH DAY OF JULY, 1965.
Jlll�..riE:rC�Gi'D'�I��t/V�*..."J
ax Tidmore, Mayor
ATTE2�e;
e�" —
Lav nia Lowe, Cit Secretary
5A OVED;�
,% J n T. Hickerson, City Engineer
APPROVED:
Fred 0. Senter, Jr. , CityXttorney
City of Lubbock
916 Texas Awnue
lb�elt� r�lxa#
July 8, 1965
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen;
I have examdmed the paving improvemants constructed by
Pioneer Pavers, Inc. , paving contractor, under their contract with
t1he aubdividers of Burlington Industrial Area and find the
improvements on Elm avenue from 58th Street to the South Line of
Let 2, Inrtallmaent #3, Burlington industUal Addition as listed on
the final estimate sheet to have beeq completed in accordance with
the plans and Specifications and vecommend that you accept theL
Improvements on said street, authorizing payment Co the coutractor
the amount Own on the attached consolidated final estimate sheet.
as dire them by the City of Lubbock.
Yours Vey truly,
rjolhanT. Hickerson
My Eagiveer
r
CONSOLIDATED FINAL ESTIMATE
BURLINGTON INDUSTRIAL AREA
Accepted July 8, 1965
QUANTITIES
S.Y. S.Y. S.Y.* L.F.*
Unit & Paving L.F. Valley Asphalt C & G
Sub-Unit Location 6" Base C & G Gutter Removed Removed
2125 Elm Ave. from 13.5` N. of 10,459.99 3,764.54 61.42 680.00 255.00
the NPL of 58th St, to the
S.Line of Lot 2, Install-
ment 3, Burlington Indus-
trial Add.
TOTALS 10,459.99 3,764.54 61.42 680.00 255.00
*No price given
COST ESTIMATE
10,459.99 S.Y. Paving @ 1.40 $ 14,643.99
3,764.54 L.F. Curb & Gutter @ 1.40 5,270.35
61.42 S.Y. Valley Gutter @ 5.00 307.10
$ 20,221.44
COST DISTRIBUTION
Unit & Contract Property
Sub-Unit Cost Owner Cost
2125 $ 20,221.44 20,221.44
TOTAL $ 20,221.44 202221.44