RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR
AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF
rj ASSESSMENTS LEVIED.
-- WHEREAS, the City of Lubbock heretofore passed various street improve-
r] went ordinances and resolutions and entered into contract with Kerr Construction
Company (G.W.O. 10460) for the making and construction of street and/or alley
improvements on portions of numerous alleys, streets and/or avenues in said City
including among others the following:
Avenue J from its intersection with a line 6.00 feet North of the South Property
Line of 50th Street (wrest Leg) to its intersection with a line 9.00 feet South of
the North Property Line of 52nd Street (West Leg) known and designated as Sub-Unit
Number 2 of Unit Number 2132-2.
53rd Street cul-de-sac and drainage channel from its intersection with a line
43.29 feet West of the East Lot line of Lot 10, Block 6, C. N. Hodges Addition to
its intersection with a line 13.00 feet East of the West Property Line of Avenue H
known and designated as Sub-Unit Number 1 of Unit Number 2140.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned alleys, streets and/or avenues, have been inspected and found to have bee
constructed in accordance with terms of said contract (G.W.O. 10460).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
�^ I.
That the improvements on said portions of the abovementioned alleys,
streets,. and/or avenues be and the same are hereby accepted, and the City Engineer
be and he is hereby authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed to
execute and deliver certificates in evidence of the assessments levied against the
parcels of property abutting upon the said portions of the alleys, streets and/or
avenues listed above and against the owners of such property in accordance with
law and in the manner provided in said contract, and the proceedings with reference
to said improvements and assessments where such assessments were levied.
III.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 8TH DAY OF JULY, 1965.
01
alw�i�
MaZ Tidmore, Mayor
AT
L nia Lowe, City Secretary
APPROVED:
J hn T. Hickerson, City Engineer
APP$OV$D:
Fred 0. Senter, Jr. , City. o ney
f
City of Lubbock
` POrter 3-3491
r
916 Texas Avenue
Lubbock, Texas
July 8, 1965
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under his contract dated
January 28, 1965, designated as G.W.0.10460 and find the improvements
on Avenue J from 50th Street to 52nd Street, and cul-de-sac and
drainage channel at 53rd Street and Texas Avenue as listed on the final
estimate and assessment sheet to have been completed in accordance
with the plans and specifications and recommend that you accept the
improvements on said streets and/or avenues, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due him by the City of Lubbock and issue assignable certificates
against property owners for the respective amounts shown on the attached
final assessment sheets as being due against them and their respective
properties.
Yours very truly,
John T. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMATE
G.W.O. 10460
Accepted July 8, 1965
QUANTITIES
S.Y. S.Y. S.Y. S.Y.
Unit & Paving L.F. Alley Valley Re-sur-
Sub-Unit Location 6" Base C & G Return Gutter facing
2132-2 Avenue J from 6' N. of the 2,537.56 800.34 9.78 94.37 30.67
SPL of 50th St. (W.Leg) to
9' S. of the NPL of 52nd
St. (W.Leg)
2140-1 53rd St. cul-de-sac & drain- 586.52 815.00 38.88 6.67
age channel from 43.29' W.
of the E. lot line of Lot
10, Blk. 6, G. N. Hodges
to 13' E. of the WPL of
Ave. H
TOTALS 3,124.08 1.615.34 48.66 94.37 37.34
COST ESTIMATE
3,124.08 S.Y. of Paving at 1.65 $5,154.73
1,615.34 L.F. of Curb & Gutter at 1.55 2,503.78
48.66 S.Y. Alley Returns at 5.95 289.52
94.37 S.Y. Valley Gutter at 6.00 566.22
37.34 S.Y. Resurface at 1.00 37.34
CONTRACT COST $8,551.59
COST DISTRIBUTION
Property Escrow
Unit & Contract Owner City to to be
Sub Unit Cost Cost Contractor Released /
2132-2 $6,082.58 3,222.30 1,044.27 J 1,816.011/
2140-1 2,469.01 2,548.33 - 79.32
TOTALS $8,551.59 5,770.63 964.95 1,816.01 •