RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Alford Terrace Addition, Lots 221 thru 296,
made arrangements with W. D. Turner Construction Company for the construction of
E � paving improvements on certain streets dedicated in said subdivision under the
~� provisions of said Ordinance prior to the recording of the subdivision plat of
Alford Terrace Addition, Lots 221 thru 296 including the following streets:
16th Street from its intersection with a line 16.00 feet East of the East Property
Line of Chicago Avenue to its intersection with a line 15.00 feet West of the West
Property Line of Bangor Avenue, known and designated as New Subdivision Unit
Number 1490.
16th Place from its intersection with a line 16.00 feet East of the East Property
Line of Chicago Avenue to its intersection with a line 15.00 feet South of the
South Property Line of 16th Street, known and designated as New Subdivision Unit
Number 1491.
17th Street from its intersection with a line 16.00 feet East of the East Property
Line of Chicago Avenue to its intersection with a line 15.00 feet West of the West
Property Line of Bangor Avenue, known and designated as New Subdivision Unit
Number 1492.
AND WHEREAS, the construction of the above improvements on the above
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE., BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to release
escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
i
/r
PASSED AND APPROVED THIS 27th DAY OF May 19 65
VZ
Max T' mo}r'—e, Mayor
AT
L venia Lowe, eity Secretary
AP J OVED:
hn T. Hickerson, City ineer
APP
JkOVED:
v
� r
Fred 0. Sente , Jr. ty Attorney
I�jl
r
i
Iiilk J,
t a4a. ls °a,ile;.a1 ,f .,.. . a,latu.�t,t:1,dvia�a«a.�{ . ,..m..,w, .,�:
�.
P O R T E R 2 .3 4 9 1
P .C. B o x goo 0
LUBBOCK , TEXAS 79406
May 27, 1965
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by W. D.
Turner Construction Company, paving contractor, under their contract with
the subdividers of Alford Terrace Addition, Lots 221 thru 296 and find
the improvements on 16th Street from Chicago Avenue to Bangor Avenue,
16th Place from Chicago Avenue to 16th Street and 17th Street from Chicago
Avenue to Bangor Avenue as listed on the final estimate sheet to have been
completed ,in accordance with the plans and specifications and recommend that you
accept the improvements on -said streets and/or avenues, authorizing payment
to the contractor the amount shown on the attached consolidated final estimate
sheet as due him by the City of Lubbock.
Yours very truly,
�ckerson
ohn T..
City Engineer
CONSOLIDATED FINAL ESTIMATE
ALFORD TERRACE ADDITION
LOTS 221 THRU 296
Accepted May. 27, 1965
QUANTITIES
S.Y. S.Y.
Unit Location S.Y. L.F. Alley Re-sur-
Paving C & G Return facing
6" Base
NS 1490 16th St. from 16' E. of the EPL 4,265.23 2,338.29 26.81
of Chicago Ave. to 15' W. of the
W.P.L. of Bangor Ave.
NS 1491 16th Place from 16' E. of the 3,437.72 1,933.72
EPL of Chicago Ave. to 15' S.
of the SPL of 16th Street
NS 1492 17th St. from 16' E. of the EPL 3,560.57 2,002.82 41.96
of Chicago Ave. to 15' W. of the
WPL of Bangor Ave.
TOTALS 11,263.52 6,274.83 26.81 41.96
COST'ESTIMATE
11,263.52 S.Y. Paving @ $1.42 $ 15, 994.20
6,274.83 L.F. Curb & Gutter @ $1.37 $ 8, 596.51
26.81 S.Y. Alley Returns @ $5.00 $ 134.05
41.96 S.Y. Resurface @ $0.71 $ 29.79
CONTRACT COST $ 24,754.55
COST DISTRIBUTION
Unit Contract Property City to
Cost Owner Cost Contractor
NS 1490 $ 9,394.13 $ 9,394.13
NS 1491 7,530.76 7,530.76
NS 1492 7,829.66 7,799.87 29.79
TOTALS $24,754.55 $24,724.76 $ 29.79