Loading...
HomeMy WebLinkAboutResolution - 2117 - Accept Paving Improvements - Kerr Construction - 1985 Maintenanace Program - 08_22_1985Resolution #2117 August 22, 1985 Agenda Item#23 RESOLUTION RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF CITY STREETS AS DESCRIBED BELOW: WHEREAS, the City of Lubbock awarded a contract May 23rd 1985 author- izing the construction of street maintenance improvements by Kerr Construction Company, on a portion of the following: 1985 Maintenance Program List of Streets Improved Street From To Slide Road 34th Street 42nd Street Slide Road 28th Street 29th Street Slide Road 27th Street 28th Street Slide Road 19th Street 27th Street Flint Avenue l9th Street 34th Street Avenue 0 Broadway l6th Street Memphis Avenue 22nd Street 34th Street 42nd Street Slide Road Quaker Avenue Quaker Avenue 51st Street 63rd Street 34th Street Slide Road Loop 289 University Avenue 34th Street 50th Street Salem Avenue 34th Street 50th Street Indiana Avenue 4th Street Erskine Street AND WHEREAS, the improvements upon the said portion of the City streets has been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. That the improvements on said portions of the City streets be, and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the final payment to the Contractor in the amount of $ 225,930.08. This resolution shall take effect and be in force after it'; passage. PASSED AND APPROVED THIS 22nd DAY OF AUGUST, 19 5. A1616 Henry, ilayor nettk_Boyd, City Secretary APPROV AS TO CONTENT: APPROVED AS TO FORM: Larry Hoff n, D i r t Transportation hko �Jr City rney t MONTHLY ESTIMATE CITY OF LUBBOCK Project: 1985 Maintenance Program Project No. Contractor: Kerr Construction Compan ; Estimate No. 2nd and Final Address: P.O. Box 888 Contract S 466, 549.55 #1 116,637.39O. Lubbock, Texas 79412 C.583,186.94 Estimate Period From August 3 1g 85 to August 9 19 85 on First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 9. Patching with black base in- S.Y. 1000.00 803.32 45.00 36,149.40 c uaing removal an isposal o asphalt sur ace, caliche base, and Used o Indiana 138.10 45.00 6,214.50 subgrade if soft or unstable to a depth of 7-1/2" and replacing with 6" inches of black base and 1-1/2" of Type C Hot Mix complete in place per square yard; 10. Patching with 3 sack cement C.Y 1 stabilized caliche base including removal and disposal of asphalt sur face, caliche base and subgrade if soft or unstable to a depth of 7-1/ " and replacing with 6" inches of 3 sack cement stabilized caliche and 1- of Type C Hot -Mix complete in pace per cubic yard of stabili- zebase; Change order No. 1 Charge to 10-6064-42 31. Y ,� APPROVED: For Fngr's off+ce Total Amount of Work Done ....... 522,451.20 Less 5 % Retained ............. S Difference . . . . . . . ' . . . . ' ' ' . ' S Less Specia! Deduction ...... ... . . S Less Liquidated Damage ......... S Less Previous Payments........... S 296,521 .12 Amount Due this Estimate......... S 225,930.08 Icaiculations by: iiiRRJJ J} Engineer Date Checked by: Dept. Head Date rJirECtOr Date MONTHLY ESTIMATE CITY OFF LUBBOCK 'roject: 1985 Maintenance Program w ,ontractor. Kerr Construction Company >ddress: P.O. Box 888 Lubbock, Texas 79408 _stimate Period From August 3 19 85 to August 9 On First estimate and final estimate use actual work dates Project No. Estimate No. 2nd and Final Contract S 466, 549.55 C.O. #1 116,637.39 583,186.94 19 85 ITEM UNIT I MEASURE PROJECT , EST. QUANTITIES, ONE ONORK CONTURACT COF PRICECT I AMOUNT Asphalt (AC-5 polymerized as halt Gals. 64,130.00 65 030.00 $ 1.70 � 110 1.00 rubber) application of 0.32 gal )ngs per square yard (precoated -ade No. 4 crushed stone seal coat )piied to existing surface inclu -1 ig c eaning, turnishing and app y- ig, per ga on; Surface Aggregate THD P.B. Grad4 C.Y. 958.00 935.00 50.00 46 50.00 �. 2 special re -coated crushed istland-Brownwood crushed stone -` Used o Indiana 666.00 0.00 00.0 Feting sliver count and soundness Est) including loading, freight iloading, spreading, broomirg, I -ading and rolling one hour per )0 square yar s per cubic yard; Surface Aggregate (THD P.B. Grad C.Y. 2723.00 2 742.00 1 47.50 130,245.00 . 4 pre -coated, Eastland-Brownwood -ushed stone meeting sliver count * Used ori Indiana 463.00 47.50 21,992.50 id soundness test) including load- ig, reight, unloading, spreading,] -ooming,--biading and rolling one >ur per iUUU square yards per is yard; Extra Grade #2 special re- C.Y. 100.00 154.00I 42 6,468.00 )ated crushed stone left over in ockpile after all two -course ,phalt surface is completed, in- .uding loading, hauling to the y oz Lubbock storage lot at f Lnicipal h2.1i, complete per cubic Lrd, del. at City s stockpile; MONTHLY ESTIMATE CITY OF LUBBOCK i\cav lu t, IUII 1rL111 'roject: 1985 Maintenance Program 'ontractor: Kerr Construction Company Project No. Estimate No. 2nd and Final address: P.O. Box 888 Contract S 466, 549. 55 Lubbock, Texas 79408 C. 0. rl 116,637.39 583,186.94 stimate Period From August 3 , 19 85 to August 9 , 19 85 on First estimate anc final estimate use actual work dates ITEM I UNIT OF MEASURE PROJECT EST. QUANTITIES I WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1-1/2" compacted THD "C" Asphaltl S.Y. 500.00 , 352.00 $ 40.00J$ 14,080.00 concrete paving with crushed stone icluding scarifying, pulverizing amoval of the asphalt surface, and j reworking 12 twelve inches existing subgrade, 9 (nine) inch-' 3 of asphalt stabilized graded -avel base, prime, tack coat and a i uted emulsion at the rate of LO gaiion per square yard of sur- ice, complete in p ace per square i ira; 1-1/2" compacted THD Ty e " S.Y. 200.00 I 67.43 10.0o 674.30 > haltic concrete paving re-surf- ,e with crushed stone also this =em to be used in patching ahead o4 ao-course including rime and tack )at; Asphalt (AC-5 polymerized asphali Gals. 15 809. 00_L 16 905.00 1.85 1 2 4.2 9% rubber) application of 0.25 tllons/S.Y. for course #1 to the :rsting surface including furnish- I ig, cleaning and applying per '° Used ori Indiana Ave 11,145.00 1 1.85 20 618.2 tllon; Asphalt (AC-5_polymerized asphalt Gals. 22,133.001 21,165.00 1 1.80 $ 0 .00 >% rubber) application of 0.35 :lions per square yard for course Used oh Indiana Ave 14,465.00 1.80 26.037.00 applied to existing surface in- .0 ing turnishing, cleaning and 'P ying, Per ga on;