HomeMy WebLinkAboutResolution - 2117 - Accept Paving Improvements - Kerr Construction - 1985 Maintenanace Program - 08_22_1985Resolution #2117
August 22, 1985
Agenda Item#23
RESOLUTION
RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF CITY STREETS
AS DESCRIBED BELOW:
WHEREAS, the City of Lubbock awarded a contract May 23rd 1985 author-
izing the construction of street maintenance improvements by Kerr Construction
Company, on a portion of the following:
1985 Maintenance Program
List of Streets Improved
Street
From
To
Slide Road
34th Street
42nd
Street
Slide Road
28th Street
29th
Street
Slide Road
27th Street
28th
Street
Slide Road
19th Street
27th
Street
Flint Avenue
l9th Street
34th
Street
Avenue 0
Broadway
l6th
Street
Memphis Avenue
22nd Street
34th
Street
42nd Street
Slide Road
Quaker Avenue
Quaker Avenue
51st Street
63rd
Street
34th Street
Slide Road
Loop
289
University Avenue
34th Street
50th
Street
Salem Avenue
34th Street
50th
Street
Indiana Avenue
4th Street
Erskine Street
AND WHEREAS, the improvements upon the said portion of the City streets
has been inspected and found to have been constructed according to the
approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portions of the City streets be, and the
same are hereby accepted and the City Engineer be and he is hereby authorized
to direct the final payment to the Contractor in the amount of $ 225,930.08.
This resolution shall take effect and be in force after it'; passage.
PASSED AND APPROVED THIS 22nd DAY OF AUGUST, 19 5.
A1616 Henry, ilayor
nettk_Boyd, City Secretary
APPROV AS TO CONTENT: APPROVED AS TO FORM:
Larry Hoff n, D i r t Transportation hko �Jr City rney
t
MONTHLY ESTIMATE
CITY OF LUBBOCK
Project: 1985 Maintenance Program Project No.
Contractor: Kerr Construction Compan ; Estimate No. 2nd and Final
Address: P.O. Box 888 Contract S 466, 549.55
#1 116,637.39O.
Lubbock, Texas 79412 C.583,186.94
Estimate Period From August 3 1g 85 to August 9 19 85
on First estimate and final estimate use actual work dates
ITEM
UNIT OF
MEASURE
PROJECT
EST. QUANTITIES
WORK DONE
ON CONTRACT
CONTRACT
PRICE
AMOUNT
9. Patching with black base in-
S.Y.
1000.00
803.32
45.00
36,149.40
c uaing removal an isposal o
asphalt sur ace, caliche base, and
Used o
Indiana
138.10
45.00
6,214.50
subgrade if soft or unstable to a
depth of 7-1/2" and replacing with
6" inches of black base and 1-1/2"
of Type C Hot Mix complete in
place per square yard;
10. Patching with 3 sack cement
C.Y
1
stabilized caliche base including
removal and disposal of asphalt sur
face, caliche base and subgrade if
soft or unstable to a depth of 7-1/
"
and replacing with 6" inches of 3
sack cement stabilized caliche and
1- of Type C Hot -Mix complete
in pace per cubic yard of stabili-
zebase;
Change order No. 1
Charge to 10-6064-42 31.
Y ,�
APPROVED:
For Fngr's off+ce
Total Amount of Work Done ....... 522,451.20
Less 5 % Retained ............. S
Difference . . . . . . . ' . . . . ' ' ' . ' S
Less Specia! Deduction ...... ... . . S
Less Liquidated Damage ......... S
Less Previous Payments........... S 296,521 .12
Amount Due this Estimate......... S 225,930.08
Icaiculations by:
iiiRRJJ J}
Engineer Date
Checked by:
Dept. Head Date
rJirECtOr Date
MONTHLY ESTIMATE
CITY OFF LUBBOCK
'roject: 1985 Maintenance Program
w
,ontractor. Kerr Construction Company
>ddress: P.O. Box 888
Lubbock, Texas 79408
_stimate Period From August 3 19 85 to August 9
On First estimate and final estimate use actual work dates
Project No.
Estimate No.
2nd and Final
Contract S 466, 549.55
C.O. #1 116,637.39
583,186.94
19 85
ITEM
UNIT I MEASURE
PROJECT
, EST. QUANTITIES,
ONE
ONORK CONTURACT
COF
PRICECT
I
AMOUNT
Asphalt (AC-5 polymerized as halt
Gals.
64,130.00
65 030.00
$ 1.70
� 110 1.00
rubber) application of 0.32 gal
)ngs per square yard (precoated
-ade No. 4 crushed stone seal coat
)piied to existing surface inclu -1
ig c eaning, turnishing and app y-
ig, per ga on;
Surface Aggregate THD P.B. Grad4
C.Y.
958.00
935.00
50.00
46 50.00
�. 2 special re -coated crushed
istland-Brownwood crushed stone
-` Used o
Indiana
666.00
0.00
00.0
Feting sliver count and soundness
Est) including loading, freight
iloading, spreading, broomirg,
I
-ading and rolling one hour per
)0 square yar s per cubic yard;
Surface Aggregate (THD P.B. Grad
C.Y.
2723.00
2 742.00 1
47.50
130,245.00
. 4 pre -coated, Eastland-Brownwood
-ushed stone meeting sliver count
* Used ori
Indiana
463.00
47.50
21,992.50
id soundness test) including load-
ig, reight, unloading, spreading,]
-ooming,--biading and rolling one
>ur per iUUU square yards per
is yard;
Extra Grade #2 special re-
C.Y.
100.00
154.00I
42
6,468.00
)ated crushed stone left over in
ockpile after all two -course
,phalt surface is completed, in-
.uding loading, hauling to the
y oz Lubbock storage lot at
f
Lnicipal h2.1i, complete per cubic
Lrd, del. at City s stockpile;
MONTHLY ESTIMATE
CITY OF LUBBOCK
i\cav lu t, IUII 1rL111
'roject: 1985 Maintenance Program
'ontractor: Kerr Construction Company
Project No.
Estimate No. 2nd and Final
address: P.O. Box 888 Contract S 466, 549. 55
Lubbock, Texas 79408 C. 0. rl 116,637.39
583,186.94
stimate Period From August 3 , 19 85 to August 9 , 19 85
on First estimate anc final estimate use actual work dates
ITEM I UNIT OF
MEASURE
PROJECT
EST. QUANTITIES
I WORK DONE
ON CONTRACT
CONTRACT
PRICE
AMOUNT
1-1/2" compacted THD "C" Asphaltl
S.Y.
500.00
, 352.00
$ 40.00J$
14,080.00
concrete paving with crushed stone
icluding scarifying, pulverizing
amoval of the asphalt surface, and
j
reworking 12 twelve inches
existing subgrade, 9 (nine) inch-'
3 of asphalt stabilized graded
-avel base, prime, tack coat and a
i uted emulsion at the rate of
LO gaiion per square yard of sur-
ice, complete in p ace per square
i
ira;
1-1/2" compacted THD Ty e "
S.Y.
200.00
I 67.43
10.0o
674.30
> haltic concrete paving re-surf-
,e with crushed stone also this
=em to be used in patching ahead o4
ao-course including rime and tack
)at;
Asphalt (AC-5 polymerized asphali
Gals.
15 809. 00_L
16 905.00
1.85
1 2 4.2
9% rubber) application of 0.25
tllons/S.Y. for course #1 to the
:rsting surface including furnish-
I
ig, cleaning and applying per
'° Used ori
Indiana Ave
11,145.00 1
1.85
20 618.2
tllon;
Asphalt (AC-5_polymerized asphalt
Gals.
22,133.001
21,165.00 1
1.80
$ 0 .00
>% rubber) application of 0.35
:lions per square yard for course
Used oh
Indiana Ave
14,465.00
1.80
26.037.00
applied to existing surface in-
.0 ing turnishing, cleaning and
'P ying, Per ga on;