HomeMy WebLinkAboutResolution - 2115 - Accept Paving Improvements - Kerr Construction - L479-525 Kings Gate Addition - 08_22_1985LDS:ck
Resolution #2115
August 22, 1985
RESOLUTION) Agenda Item #21
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND AVENUES AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of King's Gate.Addition, Lots 497 through 525
made arrangements with Kerr Construction Company for the construction of
paving improvements on certain streets dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat of
the above mentioned addition including the following streets:
94th Street from its intersection with the east lip line of Quaker
Avenue to its intersection with the west lip line of Orlando Avenue
known and designated as New Subdivision Sub -Unit Number 11 of Unit
Number 2032.
Peoria Avenue from its intersection with a line 7 feet south of
the alley north of 94th Street to its intersection with the north
lip line of 94th Street known and designated as New subdivision
Sub -Unit Number 12 of Unit Number 2032.
Orlando Avenue from its intersection with a line 7 feet south of
alley south of 93rd Street to its intersection with a line 7 feet
south of alley south of 94th Street known and designated as New
Subdivision Sub -Unit Number 13 of Unit Number 2032.
94th Street from itsA ntersection with east lip line of Orlando
Avenue to its intersection with a line 7 feet west of alley west
of Nashville Avenue known and designated as New Subdivision Sub -
Unit Number 14 of Unit Number 2032.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected.` and found
to have been constructed in accordance with City Specifications and in accor-
dance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
1.
That the improvements on said portions of the above mentioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to notify the Developer of acceptance by the Lubbock City Council.
II.
This resolution shall take effect and be in force from and after its
passage.
RESOLUTION
Page 2
PASSED AND APPROVED THIS 22ND DAY OF AUGUST , 1985.
ATTEST:
neum-b oya, L.ity �)ecrezary
APPROVED AS TO CONTENT:
f
(Larry HoVion
a/, Di of
fTranspor
APPROVED AS TO FORM:
n Ross, Jr., City Attorne
Resolution #2115
CONSOLIDATED FINAL ESTIMATE
KING'S GATE ADDITION
LOTS 497 THRU 525
Accepted August 22, 1985
QUANTITIES
Unit &
Sub -Unit
Location
S.Y.
Paving
6" Base
S.Y.
L.F. Alley
C & G Return
L. F., C & G
Removal and
Pavement Repair
S.Y.
Drainage
Slabs
2032-11
94th St. from ELL
of Quaker Ave. to
WLL of Orlando Ave.
3,321.72
1,901.24 24.49
47.00
80.05
2032-12
Peoria Ave. from
7' S of alley N
of 94th St. to
NLL of 94th St.
443.65
254.54
2032-13
Orlando Ave. from
7' S of alley S of
93rd St. to 71S
of Alley S of 94th 1,088.00
520.84 40.40
2032-14
94th St. from ELL
of Orlando Ave. to
7'W of Alley W of
Nashville Ave.
2,361.55
1,333.48
TOTAL QUANTITIES
79214.92
4,010.10 64.89
47.00
80.05
COST ESTIMATE
7,214.92
S.Y. Paving 6" Base
@ $ 6.60
$ 47,618.47
4,010.10
L.F. Curb & Gutter
@ $ 5.75
$ 23,058.09
64.89
S.Y. Alley Return
@ $18.75
$ 1,216.69
80.05
S.Y. Drainage
Channel
@ $18.75
$ 1,500.94
47.00
L.F. C & G Removal
& Pvmt. Repair
@ $ 1.00
$ 47.00
Contract Cost
$ 73,441.18
Cost Distribution
Unit &
Construction
Developer
Sub Unit
Cost
Cost
2032-11
$
34,862.61
$
34,862.61
2032-12
$
4,391.70
$
4,391.70
2032-13
$
10,933.13
$
10,933.13
2032-14
$
23,253.74
$
23,253.74
TOTAL
$
73,441.18
$
73,441.18