HomeMy WebLinkAboutResolution - 2066 - Accept Paving Improvements - Lee Lewis - Tracts B, C, & D, Piedmont Addition - 06_28_1985Resolution #2066
LDS:ck June 28, 1985
Agenda Item #19
RESOLUTION
RESOLUTION ACCEPTING IMPR0VEMENTS ON PORTIONS OF STREETS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Piedmont Addition, Tracts B, C, & D made
arrangements with Lee Lewis General Contractor, Inc., for the construction of
paving improvements on certain streets dedicated in said subdivision under the
provisions of said Ordinance prior to the recording of the subdivision plat of
the above mentioned addition including the following streets:
South 1/2 of 58th Street including south half of cul-de-sac 130 feet
east of Slide Road known and designated as New Subdivision Sub -Unit
Number 95 of Unit Number 2031.
59th Street cul-de-sac 190 feet east of Slide Road known and desi-
gnated as New Subdivision Sub -Unit Number 96 of Unit Number 2031.
AND WHEREAS, the construction of the above improvements on the above men-
tioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to
have been constructed in accordance with City specifications and in accordance
with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portions of the above mentioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to notify the Developer of acceptance by the Lubbock City Council.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 28TH DAY OF JUNE,
Alan He ry, ayo
A-TT-&5 T :
ne e boya, ui ty Secretary
APPROVED AS TO WNTENT:
ry HoffrWn, Direttoi'r/�If/Trans portation
APPROVED "AS TO FORM:
John Ross, Jr., City Attorney
CONSOLIDATED FINAL tJlll°IN IC
PIEDMONT ADDITION
Tracts B, C, & D
Accepted June 28, 1985
Unit
Concrete Paving
1-1/2" A.C.
Pvmt. Curb &
Sawtooth
30"
C & G
Pvmt.
Alley
&
w/6" thick, 5%
Patching on
Gutter
C & G
Down
Remv.
& Base
Return
Sub -Unit
Location
air entrained
existing
Curb
&
Remv. &
Type 1C 3600 psi
caliche
Disposal
Disposal
Concrete
base
2031-95
S-1/2 of 58th Street in-
cluding S-1/2 of cul-de-sac
130' E of Slide Road
66.53
20.31
25.80
58.73
40.00
77.64
15.88
2031-96
59th Street cul-de-sac
190'E of Slide Road
202.17
22.05
201.36
66.77
166.42
166.42
82.32
TOTAL QUANTITIES
268.70
42.36
227.16
125.50
166.42
206.42
159.96
15.88
COST DISTRIBUTION
Unit &
Contract
Property
Sub -Unit
Cost
Owner Cost
2031-95
2031-96
TOTAL $14,000.00 $14,000.00
LUMP SUM CONTRACT of $14,000.00 is between Lee Lewis, General Contractor, Inc., and Kerr Construction Co. as subcontractor.