Loading...
HomeMy WebLinkAboutResolution - 2013 - Accept Paving Improvements - Vowell Construction - 1984 Maintenance Program - 05_09_1985Resolution #2013 May 9, 1985 Agenda Item #17 RESOLUTION RESOLUTION ACCEPTING PAVING IMPROVEMENTS ON A PORTION OF A XITY STREET AS DESCRIBED BELOW: WHEREAS, the City of Lubbock awarded a contract April 26th, 1984 auth- orizing the construction of street maintenance improvements by Vowell Con- struction Company, Inc., on a portion of the following: Jobs Bill Paving Project - 55-0001-40003-038332 (East Broadway Reconstruction) 1984 Maintenance Program. AND WHEREAS, the improvements upon the said portion of City street has been inspected and found to have been constructed according to -the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. That the improvements on said portion of the City street be, and the same are hereby accepted and the City'Engineer be and he is hereby authorized to direct the final payment to the Contractor in the amount of $31,540.29. This resolution shall take effect and be in force after its passage. PASSED AND AYPROVED THIS 9TH DAY OF MAY, Alan ry, May6Y /1", T: net�ze uoyo, uity ,)ecretary APPROVED AS TO CONTENT: Don Wings City Engineer APPROVED AS TO FORM: , J n Ross Jr., Cilty Attorney MONTHLY ESTIMATE Resolution #2013 CITY OF LUBBOOK Project: East Broadway Re -Construction and Maintenance Program Project No. 1st 1984 Maintenance Pros Contractor: Vowel l Construction Company Inc. Estimate No. Final Address: P_ 0. Box 253 Contract$ 697,567.04 El Paso_ Texas 79743 Estimate Period From January 31 , 19 85to March 31 , �g 85 On First estimate and final estimate use actual work (Sates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 1. 1-1/2" compacted THD Type "V' asphaltic concrete paving with crushed stone or grave (with a minimum of 85% crushed face including scarifying, ulver- izing the existin�g as halt surf- ace to at least 1-1 2 in size, removal and hauling of any un uses le materia , including reprocessing the existing ca icne base and pulverize asp a t sur ace, reworking t existing su -gra e to a aepEN of at Teast 241a, prime ancl Lack coat and 1:2 dilute emulsion at the rate of 0.10 dilute emulsion at the rate of 0.10 gallon per square yard o surface, complete in place pei square yard. S.Y. 23,270 20692 37 7.40 153,123.53 2. 1-1/2" compacted TDH Type "C" As ahltic concrete paving re- surface with crushed stone or crushed gravel, (with a mini- mum of 85% crushed faces) including prime and tack coat and a 1:2 dilute emulsion at the rate of .10 gallon per square yard. S.Y. MONTHLY ESTIMATE CITY OF LUBBOCK Project: Fact Broadway Re -Construction and Maintenance Program Contractor: Vowel 1 Construction Company, Inc Address: P. 0. Box 253 El P soy Texas 79743 Estimate Period From January 31 , 1985 to March 31 on First estimate and final estimate use actual work Gates Project No. 1st 1984 Mnintannnro prn Estimate No. Final Contract $ 697, 567.04 ,19 85 ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 3. Curb and gutter 6" concrete curb and gutter or 30" wide separate gutter, including re- moval, haul and disposal of existing curb and gutter, sub - grade preparation, complete in p ace, per linear foot; L.F. 50 56 30* 7.75 436.33 4- Aqphplr #1 - 'cludin and applying per gallon,,, 6 5• Asphalt AC-5 rrolymeriz6d asp- halt + 3% rubber aRplication of 0.35 gallons per square yarl for course #2 applied to exist- ing surface including furnishihR cleaning and applying, per gallon; gals. 101,540 8 6. Asphalt (AC-5 polymerized asphalt +3% rubber) application o gallons per square yar MONTHLY ESTIMATE CITY OF LUBBOCK Project: East Broadway Re -Construction and Maintenance Program Project No. lcr 1984 Mainr n nce P-ro, Contractor: Vowel 1 Construction --Company. Inc Estimate No. Final Address: P. 0. Box 253 Contract$ 697.567.04 El Paso. Texas 79743 Estimate Period From TanitnrJz Ill , 19-6.5- to March 31 , 19 L5_ On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT o e cleaning, furnishing and aRI21yw ing, per Rallon• als. 1 000 1-93 7. Seal Coat washed ravel including ing,brooming, bladiny, and rol in (One hour per 1000 square and per cubicyard.___ C.Y:.. 50 20.00 8. Surface Grade No. 4 ravel with a minimum of 85% crushed faces re -coated higginbotham, Eastland -Brown - wood Wescott or Thrasher; crushed stone meeting sliver count and soundness test) including loading, freight, unloading, spreadi.n ,broomin , la ing and rolling one hour per 1000 square yards per cubic yar . C.y• 2884 4 12 Overva3iment Quant, 460 19.46 2380 14.66 1 $34 890.80 MONTHLY ESTIMATE CITY OF LUBBOCK Project: East Broadway Re -Construction and Maintenance Program Project No. lst 1984 Maintenance Prog Contractor: Vowell Construction Company Inc. Estimate No. Final Address: P. 0. Box 253 Contract $ 697,567.04 El Paso. Texas 79743 Estimate Period From January 31 19 85to March 31 ' 19 85 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT 9. Surface aggregate (THD P.B. Grade No. 2 special pre -coat: crushed gravel with a minimum of 85% crushed faces re - coated Higginbotham, Eastland- Brownwood or Westcott crushed stone meeting sliver count and soundness test) including load ing, freight un oa ng, spread- 3,802.0 15.94 $60,603.88 ing, brooming, blading an ro - Overpayment ing tone hour per IUUU square yar s per cu is yard; 4,ZJU 36.40 10, Patching Engineer's removal and -disposal of asphalt surface caliche base. d subgrade if soft or unstable to a depth of 7-1 2" and re- placing with 6" inches of black base and 1-1/2" of Type "C" Hot -Mix complete in place per square yard; S.Y. 11,000 19.50 11. Patching with 3 sack cement stabilized caliche base at Engineer's option) including removal and disposal of asphalt surface, caliche base and su grade if soft or unstable MONTHLY ESTIMATE CITY OF LUBBOCK Project: Rant BrQadwav Re -Construction and Maintenance Prggram Project No. 1st 1984 MnintPnan o_vr_. Contractor: VnwPl l Construction Company Inc Estimate No. Final Address:_ P - 0 _ Rnx ? 51 Contract $ 6979 567.04 El Paso, Texas 79743 Estimate Period From _ January :31, , 1985 to March 31— , 19 85 On First estimate and final estimate use actual work dates ITEM UNIT OF MEASURE PROJECT EST. QUANTITIES WORK DONE ON CONTRACT CONTRACT PRICE AMOUNT n With n n _ of Ty a "Cr' hot -mix completwe in place per cubic yard of stabilized base S.Y. 1,000 31-00 12. Three 3 sack cement stabilize caliche base to be used in backfill of subgrade that cann t be stabilized with base materi 1 at locations designated and approved by the Engineer comp- ete in place, per cubic yard; C.Y. 50 8 -- 30.00 13. Extra crushed stockRile after asphalt surface is com le ed including loading, hauling to the City of Lubbock storage lot at Municipal Hill complete per cubic yard delivered at city's stockpile. C.Y. 500 30.00 APPROVED: For En .•s Of Total Amount of Work Done ....... $ 563, 605.75 Less 5 % Retained ............. $ Difference ................... S Less Special Deduction ........... $ Less Liquidated Damage ......... $ Less Previous Payments........... S 532,065.46 Amount Due this Estimate......... $ 31, 540.29 Caicurations by: 09 E eer Date 04 7, zr / 7 Checked by - Dept Ke Date piroetn Date/ U v Resolution #2013 1ST 1984 MAINTENANCE PROGRAM COST BREAKDOWN FINAL ESTIMATE JANUARY 312 1985 TO MARCH 31, 1985 EAST.BROADWAY 55-0001-40003-038232 1st Estimate Item #1 4301.83 S.Y. x 50% = 2150.92 S.Y. @$7.40 = $15,916.81 2nd Estimate Item #1 4301.83 S.Y. x.50% =-2150.92 S.Y. @$7.40 = $15,916.81 Item #1 3759.96 S.Y. @$7.40 = $2710823.70 Item#3 56.30 L.F. @$7.45 = $ 436.33 Item #12 8.0 C.Y. 3 Sack concrete @$30.00= $ 240.00 3rd Estimate Item #1 5664.48 S.Y. x 50% = 2832.21 S.Y. @$7.40 - $20,958.35 4th Estimate Item #1 6717.25 S.Y. x 50% = 3358.63 S.Y. @$7.40 = $240853.86 5th Estimate Item #1 5262.89 S.Y. x 50% = 2631.45 S.Y. @$7.40 = $19,472.73 Item #2 1824.81 S.Y. Resurface @$4.25 = $ 79755.44 7th EstimateItem #1 7462.62 S.Y. x 50% = 3731.31 S.Y. @$7.40 = $272611.69 76.97 S.Y. @$7.40 = $ 569.58 $161,555.30 TOTAL WORK ESTIMATES;l, 2, 3, 4, 5, 6, 7, and Final $161,555.30 Less 5% Retained -0- Diff erence -0- Less Special Deduction -0- Less Previous Psyment $1503,117.53 Amount Due on Estimate - Final $ 11,437.77 Resolution #2013 1ST 1984 MAINTENANCE PROGRAM COST BREAKDOWN FINAL ESTIMATE AUGUST 31, 19 K TO MARCH 31, 1985 10-6064-42331 TWO -COURSE MAINTENANCE Estimate No. 1 Item #8 Stockpile Quantities #$ Pre Coat Aggregate 2840 C.Y. @$19.46 = $55,266.40 Item #9 Stockpile Quantities #2 Pre Coat Aggregate 4168.72 C.Y. @$20.46 $85,292-.01 Estimate No. 2 Item #4 Asphalt - 66.945 gals @$1.23 $82,342.35 Item #5 Asphalt - 81,390 gals @$1.23 $100,109.70 Item #8 No. 4 Pre -coated aggregate (overpayment on Stockpile quantities 460.0 C.Y. @$19.46/C.Y.) -$ (8,951.60) Item #8 Amount of #4 Pre -coat aggregate used 2380.00 C.Y. @$14.66 $ 34,890.80 Item #9 No. 2 Pre -coated aggregate (overpayment on stockpile quantities 366.72 C.Y. @$20.46) -$ (7,503.09) Item #9 No. 2 Pre -coated aggregate used 3802.0 C.Y. @$15.94 $ 60,603.88 Total Work Estimate 1 and 2 $402,050.45 Less 5% Retained -0- D if f er enc a -0- Less Previous Payment $381,947.93 Amount due this estimate $ 20,102.52 NO WORK DONE ON TWO -COURSE MAINTENANCE ON THIS ESTIMATE.