Ji • RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR
AVENUES AS LISTED BELOW AND ORDERING THE ZSSUANCE OF CERTIFICATES IN EVIDENCE
OF ASSESSMENTS LEVIED,
WHEREAS, the City of Lubbock heretofore passed various street
improvement ordinances and resolutions and entered into contract with L. A.
Purtell, G.W.O. 10400, for the making and construction of street and/or alley
improvements on portions of numerous streets and/or avenues in said city
including among others the following:
Avenue P from its intersection with a line 13 feet North of the South Property
Line of 34th Street to its intersection with a line 5 feet South of the South
Property Line of 36th Street, known and designated as Sub-Unit Number 19 of
Unit Number 2099.
Avenue P from its intersection with a line 5 feet South of the South Property
Line of 36th Street to its intersection with a line 2 feet North of the North
Property Line of 38th Street (East Leg), known and designated as Sub-Unit
Number 20 of Unit Number 2099.
Avenue P from its intersection with a line 2 feet South of the South Property
Line of 38th Street to its intersection with a line 2 feet North of the North
Property Line of 39th Street, known and designated as Sub-Unit Number 21 of
Unit Number 2099.
Quaker Avenue from its intersection with a line 3 feet North of the North
Property Line of the alley North of llth Street to its intersection with a
line 50 feet North of the South Property Line of 4th Street, known and
designated as Sub-Unit Number 1 of Unit Number 2103.
Quaker Avenue from its intersection with a line 3 feet North of the North
Property Line of the alley North of llth Street (West Side) to its intersection
with a line 9 feet North of the South,Property Line of 18th Street (East Side),
known and designated as Sub=Unit Number 2 of Unit Number 2103.
Quirt Avenue from its intersection with the South Paving Line of Parkway
Drive to its intersection with the North Lip Line of East Broadway, known and
designated as Sub-Unit Number 1 of Unit Number 2104.
Quirt Avenue from its intersection with the South Lip Line of East Broadway
to its intersection with the North Lip Line of Idalou Road, known and
designated as Sub-Unit Number 2 of Unit Number 2104.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets and/or avenues, have been inspected and found to have been
constructed in accordance with terms of said contract (G.W.O. 10400).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
T.
That the improvements on said portions of the abovementioned streets,
and/or avenues be and the same are hereby accepted, and the City Engineer be
and he is hereby authorized to direct payment of the cityts portion of the
cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed
to execute and deliver certificates in evidence of the assessments levied
against the parcels of property abutting upon the said portions of the streets
and/or avenues listed above and against the owners of such property in
accordance with law and in the manner provided in said contract, and the
proceedings with reference to said improvements and assessments where such
assessments were levied.
III.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 14TH DAY OF MAY 1964.
r
Max TVIMore, Mayor
ATTEST•
._ �-.AFaroved
LLB City Attorney
Lav nia Lowe, City Secretary
APPROVED:
/ ohn T. Hickerson, City Engineer
APPROVED.
Fred 0. Senter, Jr., Ci /Attorney
t City of Lubbock
POrter 3-3491
E
916 Texas Avenue
Lubbock, Texas
May 14, 1964
Honorable Mayor and City Council
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by L. A. Purtell,
paving contractor, under his contract dated April 1, 1963s designated as
G.W.O. 10400 and find the improvements on Quaker Avenue, Quirt Avenue and
Avenue P as listed on the final estimate and assessment sheet to have been
completed in accordance with the plans and specifications and recommend that
you accept the improvements on said streets and/or avenues, authorizing payment
to the contractor the amount shown on the attached consolidated final estimate
sheet as due him by the City of Lubbock and issue assignable certificates
against property owners for the respective amounts shown on the attached
final assessment sheets as being due against them and their respective
properties.
Yours very truly,
John T. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMATE
GWO 10400
Accepted May 14, 1964
QUANTITIES
S.Y. S.Y. S.Y. S.Y. S.Y. L.F. S.Y.
Unit & Location Paving Paving L.F. Alley Valley Re-sur- Special S.Y. Extra
Sub-Unit 9" Base 6" Base C & G Return Gutter facia Curb Medium Caliche
2099-19 Ave. P from 13' N. of the SPL 2,513.01 1,016.37 12,44 50.64
34th St. to 5' S. of the SPL
of 36th St.
2099-20 Ave. P from 5' S. of the SPL 2,197.79 1,266.70 61.42
of 36th St. to 2' N. of the
NPL of 38th St. (E. Leg)
2099-21 Ave. P from 2' S. of the SPL 970.67 574.60 22.89
of 38th St. (E. Leg) to 2' N.
of the NPL of 39th St.
2103-1 Quaker Avenue from 50' N. of 10,924.17 3,208.68 33.33 105.08 30.00
the SPL of 4th St. to 3' N. 873.82
of the NPL of the alley N.
of llth St.
2103-2 Quaker Avenue from 3' N. of 15,468.66 2,366.70 78.23 31.56 9.07
the NPL of the alley N. of 711.31
llth St. to 18.90' S. of the
SPL of 18th St.
2104-1 Quirt.Avenue from the S. 19,711.82 5,055.45 125.62 111.52 396.04 13.33
Paving Line of Parkway Drive
(W.Leg) to 14' S. of the NPL
of E. Broadway
2104-2 Quirt Avenue from 14' N. of 14,141.79 3,962.98 160.73 405.65 77.44 27.56
the SPL of E. Broadway to
20' S. of the NPL of Idalou
Rd.
t TOTALS 60,246.44 5,681.47 17,451.48 494.66 704.45 482.55 30.00 40.89 1,585.13
t
COST DISTRIBUTION
Property City to
Unit & Contract Owner Contractor Prepaid
Sub-Unit Cost Cost NOV Paving
2099-19 $ 5,094.17 3,521.13 1,573.04
2099-20 4,978.79 3,841.75 1,137.04
2099-21 2,200.61 1,636.37 564.24
2103-1 23,068.66 11,874.43 11,194.23
2103-2 28,686.35 7,261.11 19,017.30 2,407.94
2104-1 39,392.84 23,412.04 12,921.21 3,059.59
2104-2 30,535.80 15,700.89 14,834.91
TOTALS $ 133,957.22 67,247.72 61,241.97 5,467.53
COST ESTIMATE
60,246.44 S.Y. Paving 9" Base @ $1.57 $ 94,586.91
5,681.47 S.Y. Paving 6" Base @ 1.35 7,669.98
17,451.48 L.F. Curb & Gutter @ 1.37 23,908.53
494.66 S.Y. Alley Return @ 4.50 2,225.97
704.45 S.Y. Valley Gutter @ 5.00 3,522.25
30.00 L.F. Special Curb & Gutter @ 2.00 60.00
1,585.13 S.Y. Extra 9" Caliche Base @ 0.90 1,426.62
40.89 S.Y. Median @ 3.00 122.67
482.55 S.Y. Resurfacing @ 0.90 434.29
CONTRACT COST $ 133,957.22
Acceptance Date 5-16-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT AVENUE "P" Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 19 of
Width 36 Feet From 13t N. of the SPL of 34th St. to 5t S. of the SPL of 36th St. Unit No. 2099
Paving Curb & Gutter
Owner Lots Blk. Addition $1.4385 Rate/L.F. Total
No No.Ft Different Rate Cost Cost Cost
EAST SIDE
J. C. Davis West 100.00 feet of Block 16 16 J. C. Davis Add. 260.00 2.59913975 675.78 Existing 675.78
James E. Atcheson & 10 15 J. C. Davis Add. 132.50 2,59913975 344,39 190,60 534.99
Atmar L. Atkinson
Thomas W. Mackey* 11 15 J. C. Davis Add. 132.50 1,73275983 229.59 190.60 420.19
WEST SIDE
Granville Johnson East 100.00 feet of Block 1 1 Granville Johnson 260.00 2.59913975 675.78 374.01 1049.79
Add.
R. Q. Stubbs* Beginning at a point which is 187.50 feet Stubbs Addition 117.50 1.73275983 203.60 169.02 372.62
north and 30.00 feet west of the south-
east corner of Tract Number Two (2) of
Stubbs Addition, thence north 117.50 feet,
thence west 124.00 feet, thence south
117.50 feet, thence east 124.00 feet to
the point of beginning
R. Q. Stubbs Beginning at a point which is 25.00 feet Stubbs Addition 147.50 1.73275983 255.58 212.18 467.76
north and 30.00 feet west of the south-
east corner of Tract Two (2), Stubbs
Addition, thence north 147.50 feet, thence
west 124.00 feet, thence south 147.50 feet,
thence east 124.00 feet to the point of
beginning
TOTAL PROPERTY OWNER COST $ 3521,13
CITYtS SHARE 1827.75
TOTAL FINAL SUB UNIT COST $ 5348,88
*City agreed to purchase certificates of assessment Feb. 13, 1964
Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT AVENUE "P" Sheet No. 1 of 2
CITY OF LUBBOCK Sub-Unit No. 20 of
Width 36 Feet From 59 S. of the SPL of 36th St. to 2t N. of the NPL of 38th St. (E2 Leg) Unit No. 2099
Paving Curb & Gutter
Owner Blk. $1.4385 Rate/L.F. Total
Lots No. Addition No,FC, Different Rate Cost Cost Cost
EAST SIDE
Burl Jones 10 14 J. C. Davis Add. 132.50 1.73275983 229.59 190.60 420.19
A. S. Dawson 11 14 J. C. Davis Add. 132.50 1.73275983 229.59 190.60 420.19
Worth E. Dodson* 10 13 J. C. Davis Add. 132.50 1.73275983 229,59 190.60 420.19
Bobby L. Franks 11 13 J. C. Davis Add. 132.50 1.73275983 229.59 190.60 420.19
WEST SIDE
Nelle M. McNeill Beginning at a point which is 25.00 Stubbs Addition 64.00 2.59913975 166.34 92.06 258.40
feet south and 30.00 feet west of the (Tract 3)
northeast corner of Tract Three (3),
Stubbs Addition, thence south 64.00
feet, thence west 132.50 feet, thence
north 64.00 feet, thence east 132.50
feet to the point of beginning
Charles E. McNeill Beginning at a point which is 89.00 feet Stubbs Addition 67.00 2.59913975 174.14 96.38 270.52
south and 30.00 feet west of the north- (Tract 3)
east corner of Tract Three (3) Stubbs
Addition, thence south 67.00 feet, thence
west 132.50 feet, thence north 67.00 feet,
thence east 132.50 feet to the point of
beginning
*City agreed to purchase certificate of assessment Feb. 13, 1964
s Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT AVENUE"P"
Sheet 2 of 2
CITY OF LUBBOCK
Sub-Unit No. 20 of
Width 36 Feet From 51 S. of the SPL of 36th St. to 21 N. of the NPL of 38th St.(E.Leg) Unit No. 2099
Paving Curb & Gutter
Blk. $1.4385 Rate/L.F. Total
Owner Lots No. Addition No. Ft. Different Rate Cost Cost Cost
WEST SIDE CONTD.
Nelle M. McNeill Beginning at a point which is 171.00 Stubbs Addition 59.00 2.59913975 153.35 84.87 238.22
feet south and 30.00 feet west of the (Tract 3)
northeast corner of Tract Three (3)
Stubbs Addition, thence south 59.00 feet,
thence west 132.50 feet, thence north
59.00 feet, thence east 132.50 feet to
the point of beginning
Tom Jones* Beginning at a point which is 230.00 feet Stubbs Addition 92.50 2.59913975 240.42 133.06 373.48
south and 30.00 feet west of the north- (Tract 3)
east corner of Tract Three (3) Stubbs
Addition, thence south 92.50 feet, thence
west 158.00 feet, thence north 92.50 feet,
thence east 158.00 feet to the point of
beginning
Ada Witt, James E. Witt,* Beginning at a point which is 7.50 feet Stubbs Addition 97.00 2.59913975 252.12 139.53 391.65
Dean Witt, & Leola south and 30.00 feet west of the north- (Tract 4)
Schulien, heirs of east corner of Tract Four (4), Stubbs
Homer Witt, Deceased Addition, thence south 97.00 feet, thence
west 205,00 feet, thence north 97.00 feet,
thence east 205.00 feet to the point of
beginning
Norman K. Snodgrass** 8 Paris Addition 65.00 2,59913975 168.94 93.50 262.44
Norman K. Snodgrass** 1 Paris Addition 115.50 1.73275983 200.13 166.15 366,28
TOTAL PROPERTY OWNER COST $ 3841,75
CITY'S SHARE 1385.98
*City agreed to purchase certificate of assessment Feb. 13, 1964 TOTAL FINAL SUB UNIT COST $ 5227.73
**Corrected by Ord. No. 4244 on 11-14-63
Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT 'jP#' AVENUE Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 21 of
Width 36 Feet From 21 S. of the SPL of 38th St, to 2r N. of the NFL of 39th St. Unit No. 2099
Paving Curb & Gutter
Owner Lots B1k. $1.73275983 Rate/L.F. $1.4385 Rate/L.F. Total
_ No. - Addition No, Ft, Cost Cost Cost
EAST SIDE
Robert A. Langford* 10 12 J. C. Davis Add. 130.50 226.13 187.72 413.85
A. N. Wright 11 12 J. C. Davis Add. 130.50 226.13 187.72 413.85
WEST SIDE
Southport Development Corp. South 127.50 feet of
Lot 10 15 Southport Add. 124.50 215,73 179.09 394.82
Jasper G. Moyers 11 15 Southport Add. 130.50 226.13 187.72 413.85
TOTAL PROPERTY OWNER COST $ 1636.37
CITY'S SHARE 674,27
TOTAL FINAL SUB UNIT COST $ 2310.64
*City agreed to purchase certificate of assessment Feb. 13, 1964
Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT QMkKER AVENUE Sheet No. 1 of 2
CITY OF LUBBOCK Sub-Unit No. 2 of
Width 62 Feet From 31 N. of the N.P.L. of the alley N. of llth St. (W.Side)to 9' N.of the SPL of 18th St.(E.Side) Unit No. 2103
Paving Curb & Gutter
Owner Lots Blk. $2.225649484 Rate/L.F. $1.4385 Rate/L.F. Total
No. Addition No, Ft. Cost Diff.No.Ft, Cost Cost
WEST SIDE
Jeanne C. Qualia 1 4 West Gate Drive Inst. #1 190,00 422.87 167.00 240.23 663.10
James A. Nunley, Jr.* 12 4 West Gate Drive Inst. #2 180.00 400.62 258,93 659,55
Wilton_C. Sutton 1 6 West Gate Drive Inst. #3 180.00 400.62 258.93 659,55
Herbert D. Teel 1 7 West Gate Drive Inst. #4 180.00 400.62 258.93 659,55
Samuel Eugene Brown 1 10 West Gate Drive Inst. #4 180.00 400.62 258.93 659.55
L. H. Grimes, Sr. 1 11 West Gate Drive Inst. #5 150,00 333.85 215,78 549.63
Abilene District Church of the 1 14 West Gate Drive Inst. #5 150.00 333.85 215.78 549.63
Nazarene, Abilene
No Assessment 12 14 West Gate Drive Inst. #6 Escrow Existing
No Assessment 1 15 West Gate Drive Inst. #6 Escrow Existing
No Assessment 25 15 West Gate Drive Inst. #7 Escrow Existing
No Assessment 1 16 West Gate Drive Inst. #7 Escrow Existing
*City agreed to Purchase Certificate of Assessment Jan. 9, 1964
ti
Acceptance Date 5-14-64
FINAL PAVING ASSESSMENT G.W.O. 10,400
CITY OF LUBBOCK QUAKER AVENUE Sheet No. 2 of 2
of
Width 62 Feet From 31 N. of the N.P.L. of the alley N.of filth St. (W.Side) to 9t N.of the S.F.L. of 18th St.(EastuSide)t UnitNo. 2No. 2103
Owner Paving Curb & Gutter
Lots Blk. $2.225649484 Rate/L.F.
No Addition $1.4385 Rate/L.F. Total
WEST SIDE CONTD. No Ft Cost Di f No t Cost Cost
No Assessment 22 16 West Gate Drive Inst.#8 Escrow Existing
No Assessment 1 17 West Gate Drive Inst.#8 Escrow Existing
EAST SIDE
J. H. Mitchell East 85.00 feet of Lot 6, less 5 Cowan 152.50 339.41
alley dedication 219.37 558.78
H. L. Bradford East 85.0 feet of Lot 1, less 5 Cowan 157.50 350.54
alley dedication 226.56 577.10
Edd Mote East 85.0 feet of Lot 6, less 3 Cowan 157.50
alley dedication 350.54 226.56 577.10
C. D. & Tinie Knight East 85.0 feet of Lot 1, less 3 Cowan 157.50 350.54
alley dedication 226.56 577.10
B. W. Knoll East 85.0 feet of Lot 1, less 1 Cowan 158.33 352.39 151,60 218.08 alley dedication 570.47
TOTAL PROPERTY OWNER COST $ 7261.11
CTPYtS SHARE 22859.56
TOTAL FINAL SUB UNIT COST $30120.67
FINAL PAVING ASSESSMENT Acceptance Date 5-14-64G.W.O. 10,400
CITY OF LUBBOCK QUIRT AVENUE
Width 64 Feet Sheet No. 1 of 5
From South Paving Line of Parkway Drive to the North Lip Line of East Broadwa Sub-Unit No. 1 of
y Unit No. 2104
Owner Paving Curb & Gutter
Lots No.Ft. Different Rate Cost $1.4385 Rate/L.F. Total .
Coat Cost
(No Assessment) Lot 3, Tract D
Mackenzie Terrace (No Assessment - Paving in Escrow - Curb & Gutter existing)
(No Assessment) Lot 4, Tract D
Mackenzie Terrace (No Assessment - Paving in Escrow - Curb & Gutter existing)
Mackenzie Village South, Inc. Beginning at a point 660.0
feet south and 60.00 feet east 204.25 6.07342344 1240.50
293,81 1534.31
of the northwest corner of
Section 4, Block 0, Lubbock
County, Texas; Thence east 100.00
feet; Thence north 204.25 feet;
Thence west 100.00 feet; Thence
south 204.25 feet to the point of
beginning
Claude Keeton, Sidney S, Beginning at a point which is
Keeton and Rogstad Zachary 660.0 feet south and 60 feet east 630,00 6.07342344 3826.26 906,26 4732.52
of the northwest corner of Section
4, Block 00 Lubbock County, Texas;
Thence south 630.0 feet; Thence
east 100.0 feet; Thence north 630.0
feet; Thence west 100.0 feet to
the point of beginning
FINAL PAVING ASSESSMENT Acceptance Date 5-14-64
CITY OF LUBBOCK QUIRT AVENUE G.W.O. 10,400
Width 64 Feet Sheet No. 2 of 5
From South Paving Line of Parkway Drive to the North Lip Line of East Bmadway Sub-Unit No. 1 of
Unit No. 2104
Owner Lots Blk. Paving Curb & Gutter
EAST SIDE CONTD. No. Addition No.Ft. Different Rate $1.4385 Rate/L.F. Total
Cost Cost Cost
Robert B. Snell,Trustee for Beginning at a point 30.00 feet east 4 East Side 132.50 2,7696890
Linda Rae O'Neil, Trust of the Northwest corner of Block 4, 366.98 190.60 557.58
Estate Donna Cheryl O'Neil, East Side Addition to the City of Lubbock,
Trust Estate Karen Evonne Lubbock County, Texas; Thence east
O'Neil 100.00 feet;Thence south 132.50 feet;
Thence west 100.00 feet; Thence north
132.50 feet to the point of beginning
Robert B.Snell,Trustee for Beginning at a point 30.00 feet east 4 East Side 132.50 2.7696890 366.98
Linda Rae O'Neil,Trust Estate and 147.50 feet south of the north- 190.60 557.58
Donna Cheryl O'Neil, Trust west corner of Block 40East Side Addi-
Estate Karen Evonne O'Neil tion to the City of Lubbock, Lubbock
County, Texas; Thence east 100.00 feet;
Thence south 132.50 feet; Thence west
100.00 feet; Thence north 132.50 feet
to the point of beginning
Robert B.Snell,Trustee for Beginning at a point 30.00 feet east of 4 East Side 285.00 4.1545335 1184.04
Linda Rae O=Neil,Trust es- the southwest corner of Block 4, East 409.97 1594.01
tate Donna Cheryl O'Neil, Side Addition to the City of Lubbock,
Trust Estate Karen Evonne Lubbock County, Texas; Thence east
O'Neil 100.00 feet; Thence north 285.00 feet;
Thence west 100.00 feet; Thence south
285.00 feet to the point of beginning
(No Assessment) Beginning at a point which is 30.0 feet 5 East Side No
Assessment Paving, Curb & Gutter in Escrow)
east of the northwest corner of Block 5, (
East Side Addition to the City of Lubbock,
Texas; Thence south 104.5 feet; Thence
east 100.0 feet; Thence north 104.5 feet;
Thence west 100.0 feet to the point of
beginning
Acceptance Date 5-14-64
FINAL PAVING ASSESSMENT G.W.O. 10,400
QUIRT AVENUE CITY OF LUBBOCK Sheet No. 3 of 5
Sub-Unit No. 1 of-
Width 64 Feet
From South Paving Line of Parkway Drive to the North Lip Line of East Broadway Unit No. 2104
Paving C&G $1.4385
Owner Lots Blk. Rate/L.F. Total
No. Addition No. Ft Different Rate Cost Cost Cost
EAST SIDE COWD _
W. R. Guinn & F. A. McAdams Beginning at a point 30.0 feet east and 5 East Side 67.50 6.07342344 409.96 97.10 507.06
119.50 feet south df the northeast corner
of Block 5, East Side Addition to the
City of Lubbock, Texas; Thence south
67.50 feet; Thence east 120.0 feet; Thence
north 67.50 feet; Thence west 120.0 feet
to the place of beginning.
Earl Stalnaker & Wife Mildred Beginning at a point which is 30.0 feet Stalnaker Subd. 248.00 6.07342344 1506.21 356.75 1862.96
east of the southwest corner of Lot 1,
Stalnaker Subdivision to the City of
Lubbock, Texas; Thence north 248.0 feet;
Thence east 100.0 feet; Thence south
248.0 feet; Thence west 100.0 feet to
the point of beginning
Earl Stalnaker & wife Mildred Beginning at a point which is 30.0 feet Stalnaker Subd. 140.00 6.07342344 850.28 201.39 1051.67
east of the southwest corner of Lot 2,
Stalnaker Subdivision to the City of
Lubbock, Texas; Thence north 140.0 feet;
Thence east 100.0 feet; Thence south 140.0
feet to a point in north right-of-way of
east Broadway; Thence west along the said
north right-of-way of east Broadway a
distance of 100.0 feet to the point of
beginning
WEST SIDE
Rhyne Simpson Beginning at a point which is 15.0 feet 1 Rhyne Simpson 236.50 6.07342344 1436.36 340.21 1776.57
north of the northwest corner of Lot 1, Quirt Ave.
Block 1, Rhyne Simpson Quirt Avenue
Addition to the City of Lubbock, Texas;
Vence north 223.1 feet• Thence north 450
west a distance of 18.95� feet to a point
in the north line of said Block 1;Thence
west along the north line of said Block 1
Acceptance Date 5-14-64
FINAL PAVING ASSESSMENT QUIRT AVENUE G.W.O. 10,400
CITY OF LUBBOCK
Sheet No. 4 of 5
Width 64 Feet
From_South Paving Line of Parkway Drive to the North Lip Line of East Broadway Sub-Unit No. 1 of
Unit No. 2104
Paving Curb & Gutter
Blk. $1.4385 Rate/L.F.Total
Owner Lots WEST SIDE CONTD. No Addition No.Ft. Different Rate Cost Cost Cost
a distance of 83.77 feet to a point in
the south right-of-way line of Parkway
Drive; Thence south 75°031 west along
the south right-of-way line of Parkway
Drive a distance of 416.93 feet; Thence
south 128.94 feet to a point, said point
being 15.0 feet north of the northwest
corner of Lot 10, Block 1, Rhyne Simpson
Quirt Avenue Addition; Thence east 500.0
feet to the point of beginning
Rhyne Simpson 1 1 Rhyne Simpson Quirt Ave. 125.00 6.07342344 759,18 179.81 938.99
Rhyne Simpson 1 2 Rhyne Simpson Quirt Ave. 125.00 2.7696890 346:21 179.81 526,02
Rhyne Simpson The north 20.0 feet of Lot 20 2 Rhyne Simpson Quirt Ave. 20.00 4.1545335 83.09 28,77 111.86
Southwestern Public The south 105.0 feet of Lot 20 2 Rhyne Simpson Quirt Ave. 105.00 4.1545335 436.23 151.04 587.27
Service Co.
Rhyne Simpson 1 3 Rhyne Simpson quirt Ave. 125,00 2.7696890 346,21 179.81 526.02
Rhyne Simpson 20 3 Rhyne Simpson Quirt Ave. 125.00 2.7696890 346.21 179.81 526.02
Rhyne Simpson 1 4 Rhyne Simpson Quirt Ave. 125.00 2.7696890 346,21 179.81 526,02
Rhyne Simpson 20 4 Rhyne Simpson Quirt Ave. 125.00 2.7696890 346.21 179,81 526.02
Rhyne Simpson 1 5 Rhyne Simpson Quirt Ave. 125.00 2.7696890 346.21 179,81 526.02
Acceptance Date 5-14-64
FINAL PAVING ASSESSMENT Qum AVENUE c.W.O. 10,400 S
CITY OF LUBBOCK Sheet No. 5 of 5
Width 64 Feet Sub-Unit No. 1 of
From South Paving Line of Parkway Drive to the North Lip Line of East Broadway Unit No. 2104
Paving Curb & Gutter
Bo. $1.4385 Rate/L.F. Total
Owner Lots No Addition No.Ft. Different Rate Cost Cost Cost
WEST SIDE CONTD.
G. C. Jenkins Beginning at a point which is 15.0 feet 125.00 2,7696890 346,21 179.81 526.02
south of the southeast corner of Lot 1,
Block 5, Rhyne Simpson Quirt Avenue
Addition to the City of Lubbock, Texas;
Thence south 125.0 feet; Thence west
100.0 feet; Thence north 125.0 feet;
Thence east 100.0 feet to the point of
beginning
Rhyne Simpson 13 1 Rhyne Simpson 87,50 2.7696890 242.35 125.87 368.22
Rhyne Simpson 26 1 Rhyne Simpson 87.50 2.7696890 242,35 125.87 368,22
Rhyne Simpson 13 2 Rhyne Simpson Add. #2 87,50 2,7696890 242.35 125,87 368.22
Rhyne Simpson 26 2 Rhyne Simpson Add. #2 87.50 2.7696890 242.35 125.87 368.22
F. B. Tonrey & 1 Toaroy & Stalnaker Subd. 177.50 2.7696890 491.62 255,33 746,95
R. B. Stalnaker
F. B. Tonrey & 2 Tonrey & Stalnaker Subd. 226.00 6.07342344 1372.59 325.10 1697.69
R. B. Stalnaker
TOTAL PROPERTY OWNER COST $23,412.04
o CITY�S SHARE 17,950.44
TOTAL EINAL SUB UNIT COST $41,362.48
Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT QUIRT AVENUE Sheet No. 1 of 2
CITY OF LUBBOCK Sub-Unit No. 2 of
Width 64 Feet From South Lip Line of East Broadway to the North Lip Line of Idalou Road Unit No. 2104
Paving Curb & Gutter
Owner Lots Blk. $1.4385 Rate/L.F. Total
No Addition No.Ft Different Rate Cost Cost Cost
EAST SIDE
S. W. McCaw Beginning at a point which is north 1 S. W. McCaw 144.29 6.07342344 876.33 207.56 1083.89
871148120" east a distance of 42.03 feet
east of the northwest corner of Lot 7,
Block 1, S.W. McCaw Addition to the City
of Lubbock, Texas; Thence south 020581
west a distance of 144.29 feet; Thence
east 36.98 feet; Thence north 144.40 feet;
Thence south 87 48120" west a distance of
28.97 feet to the point of beginning.
S. W. McCaw Beginning at a point which is 32.98 feet 1 S. W. McCaw 152,62 2.7696890 422.71 219.54 642.25
east of the northwest corner of Lot 8,
Block 1, S. W. McCaw Addition to the City
of Lubbock, Texas; Thence south 010071
west a distance of 152.62 feet; Thence
east 41.0 feet; Thence north 152.60 feet;
Thence west 38.02 feet to the point of
beginning
City of Lubbock The east 41.0 feet of Lot 7 2 S. W. McCaw 150.00 2,7696890 415.45 215.78 631.23
Santo Salazar The east 41.0 feet of Lot 8 2 S. W. McCaw 150.00 2.7696890 415.45 215.78 631.23
A. J. Graham The east 20.0 feet of Lot 1 2 Morrow Subdivision 140.00 2.7696890 387.76 201.39 589.15
.A. T. Bandy * The east 20.0 feet of Lot 42 2 Morrow Subdivision 140.00 2.7696890 387.76 201.39 589.15
City of Lubbock The east 20.0 feet of Lot 1 2-A Morrow Subdivision 139.50 2.7696890 386.37 200.67 587.04
F. Trotter The east 20.0 feet of Lot 42 2-A Morrow Subdivision 139.50 2.7696890 386.37 200.67 587.04
*City agreed to purchase assessment certificate July 28, 1963
r Acceptance Date 5-14-64
G.W.O. 10,400
FINAL PAVING ASSESSMENT QUIRT AVENUE Sheet No. 2 of 2
CITY OF LUBBOCK Sub-Unit No. 2 of
Width 64 Feet From South Lip Line of East Broadway to the North Lip Line of Idalou Road Unit No. 2104
Paving Curb & Gutter
Owner Lots Blk. $1.4835 Rate/L.F. Total
No. Addition No. Ft. Different Rate Cost Cost Cost
EAST SIDE CONTD.
Louis Murfee,Sr. Lots 11, 12, 13, 14, 15 and 16 34 Morrow Subdivision 404.44 6.07342344 2456.34 581.79 3038.13
Less street dedications on west side
WEST SIDE
Earl Ince, Sr. 1 1 Whitehead 140.00 6.07342344 850.28 201.39 1051.67
Earl Ince, Sr. 42 1 Whitehead 152.60 2.7696890 422.65 219.52 642.17
E. L. McGowan 1 2 Whitehead 150.00 2.7696890 415.45 215.78 631.23
G. G. Gililland, Jr. 20 2 Whitehead 150.00 2.7696890 415.45 215.78 631.23
Joe Stewart* 1 5 Whitehead 140.00 2.7696890 387.76 201.39 589.15
J. P. Turner 20 5 Whitehead 140.00 2.7696890 387.76 201.39 589.15
E. L. Snodgrass, Jr. 1 6 Whitehead 139.00 2.7696890 384.99 199.95 584.94
John Barbee 20 6 Whitehead 139.00 2.7696890 384.99 199.95 584.94
Christian Missionary Association 13 9 Whitehead Second Add. 81.50 2.7696890 225.73 117.24 342.97
R. G. Douglas 1 10 Whitehead Second Add. 142.86 2.7696890 395.68 205.50 601.18
. 0. Gowen Lot 33 less East 15.0 feet 10 Whitehead Second Add. 142.86 6.07342344 867.65 205.50 1073.15
TOTAL PROPERTY OWNER COST $15,700.89
s CTTYiS SHARE 16,361.70
TOTAL FINAL SUB UNIT COST $32,062.59
*City agreed to buy certificate of assessment July 28, 1963