March 14, 1985
Agenda Item #16
LDS:clk
RF.g0T.TTTT0M
RESOLUTION ACCEPTING ALLEY PAVING AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of JFI Addition, Lots 1-23 made arrangements
with Ed Curbo Construction Company for the construction of paving improvements
on certain alleys dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of the above mentioned
addition including the following alleys:
Alley paving on West, North and East sides of Lots 1-23, JFI
Addition known as New Subdivision Number 2031-54.
AND WHEREAS, the construction of the above improvements on the above
mentioned alleys was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed'in accordance with City Specifications and in accor-
dance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the above mentioned alleys be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to notify the Developer of acceptance by the Lubbock City Council.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 14TH DAY OF MAR(Al 2W 5
Alan Henry, May
T:
tte Boyd, City Secrets
APP VED TO CONTENT:
Don Je ings, ity Engineer
APPROVED .A.�S---T�O FORM:
Uc /L .
i
ohn Ross Jr., City Attorney
Resolution #1965
CONSOLIDATED FINAL ESTIMATE
JFI ADDITION
LOTS 1-23
Accepted March 14, 1985
2UANTITIES
S.Y. .L.F. S.Y. L.F. C & G
Unit & Concrete C & G Alley Removal &
Sub -Unit Location Alley Pvg. Return Pvmt. Repair
2031-54 Alley paving on West,
North, and East sides
of Lots 1-23 977.31 28.24 18.00 32.00
COST DISTRIBUTION
Unit & Contract Developer
Sub -Unit Cost Cost
2031-54
LUMP SUM CONTRACT
$18,545.18
$18,545.18