HomeMy WebLinkAboutResolution - 1874 - Authorize Services- Terra Testing- Materials Testing, Quirt Ave Overpass Project - 11_15_1984Resolution #1874
November 15, 1984
Agenda Item #12
JWF:rm
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
Section 1. That the City of Lubbock has received a proposal addressed
to its Mayor and City Council for professional engineering services in the
form of engineering laboratory testing services to be done by Terra Testing
Inc. in connection with the 34th Street and Quirt Avenue Overpass Con-
struction Project, to be accomplished for an approximate estimated total
cost of $18,740.00 adjusted to the actual cost for the work in line with
the rates for services as set forth in said proposal, a copy of which
proposal is attached hereto and made a part hereof as Exhibit A.
Section 2. The City Engineer, at his sole discretion, may allow the
Resident Project Representative to notify and request engineering labora-
tory testing services from Terra Testing Inc. as the need of such service
is required to serve the best interests of the City of Lubbock.
Passed this 15th day of November
ATTEST:-
Ranett6e Boyd, City Secretary
APPROVED AS TO CONTENT:
Don Jtffinings,00rCity Engineer
APPROVED AS TO FORM:
J. Wo Fullingim, Assistant City
Attor y
19 84 A
'Perry Testing Inc.
5208 - 34th Street
Lubbock. Texas79407
SOIL TESTS (Includes Caliche- Base Course)
Modified Proctor - Moisture
Density Relations
9
@
$125.00
Sieve Analysis (Dry gradation)
6
@
$
35.00
Atterberg Limit tests
5
@
$
37.50
In -Place Densities:
6 tests per lift x 40 lifts*
@
$
18.00
34 on street subgrade & trenches
@
$
18.00
36 on base
@
$
18.00
Plasticity Index
8
@
$
37.50
*Fill between retaining walls
CONCRETE TESTS
Making, curing & testing
cylinders, including one
(1) slump test per set
Making, picking -up &
testing beams
Air entrainment
Sieve Analysis
Atterberg Limit tests
Decantation
Organic impurities
ASPHALT TESTS
Sieve Analysis
(Dry)
Atterberg Limit
tests
Extraction with
gradation
Stability tests
Lab Densities
Field Densities
TECHNICIAN TIME
40 hours
1) Time is from
lab &
back to lab
2)$26.00/hour
is from
8:00-5:00, M
- F .
3 ) Time & half
on week-
ends
116 @ $ 50.00
(sets)
10 @ $ 80.00
(sets)
116 @. $1 15.00
(tests)
8@$35,00
2 @ $ 37.50
2 @ $ 65.00
2 @ $ 12.50
2
@
$
35.00
2
@
$
37050
6
@
$
95.00
4
@
$
25.00
8
@
$
25.00
24
@
$
18.00
@ $ 26.00
Telephone: 806-793.4767
November 2, 1984
$ 1,125.00
210.00
188.00
4,320.00
612.00
648.00
300.00 $ 7,403.00
$ 5,800.00
800.00
1,740.00
280.00
75.00
130.00
-25.00 $ 8,850.00
$ 70.00
75.00
570.00
100.00
200.00
432.00 $ 1,447.00
$ 1,040:00 $81,040.00
Total estimated testing cost $18,740.00
PPARKHILL, SMITH & COOPER, INC.
SENGINEERS • ARCHITECTS . PLANNERS
LUBBOCK ELPASO
October 12, 1984
Mr. Jim Bertram
Assistant City Manager
City of Lubbock
P.O. Boa 2000
Lubbock, Texas 79457
Re: City of Lubbock
Quirt Avenue Overpass
Dear Mr. Bertram:
We are pleased to advise you that the resident project representative we
are planning to assign to the referenced project is Mr. Robert J. Field.
Mr. Field has been 'involved in the heavy construction industry for more
than thirty years. Mr. Field has served as resident project represen-
tative, survey party chief, estimator and construction superintendent on
numerous construction projects involving the construction of bridges, high-
ways, streets, drains, sewers, reservoirs, water and wastewater improve-
ments, airports and dams. Mr. Field's experience includes work in
Massachusetts, Maine, New York, Illinois and Texas. Mr. Field was employed
by Parkhill, Smith & Cooper, Inc. in April, 1982 and has served as resi-
dent project representative on various water, wastewater, street and air-
port construction projects in Lubbock and the surrounding area. Mr.
Field's experience in construction of highway bridges and other heavy
construction projects qualifies him to serve in the capacity of resident
project representative on the Quirt Avenue Overpass, coupled with periodic
site visits by a representative of the bridge design division of
Henningson, Durham & Richardson.
We also wish to advise you that we plan to use Wilson Surveying Co. for
construction surveying needs. The construction contract requires the
Contractor to furnish all surveys necessary to provide horizontal and ver-
tical lines and grades to construct the work. Any construction period sur-
veys performed by Wilson Surveying Co. for the City will be authorized
through our office, only for "spot-checking" the accuracy of staking and
construction performed by the Contractor.
The testing laboratory we plan to use is Terra Testing, Inc. The lab will
only test materials delivered to the site and report results of material
tests required to insure compliance with the project specifications. The
construction contract provides for payment for all required preconstruction
tests and all failing construction tests by the Contractor.
4010 AVENUE R • LUBBOCK TEXAS 79412 • PHONE 906-747-0161
ATCHESON. CARTWRIGHT £Y ASSOCIATES • -MEMBERS A.I.A. - AFFILIATES
Mr. Jim Bertram
Page 2
October 12, 1984
We have worked with both Wilson Surveying Co. and Terra Testing, Inc. on
numerous construction projects for several years and it is our opinion that
they have the resources to adequately perform the work required.
We trust we have adequately addressed your needs and we stand available to
provide any additional information you nay require.
Sincerely,
PARKHILL, SMITH & COOPER, INC.
By
Terry/,'G. Bilderback, P.E.
TGB/djb
me: Mr. Larry Hertel
Mr. Eduardo Ugarte
Terra Testing Inc.
5208 - 34th Street Telephone : 806-793-4767
Lubbock, Texas79407 November 2, 1984
Honorable Mayor and City Council
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
Attention: Mr. Jim Bertram,
Assistant City Manager
Gentlemen and Mrs. Baker:
In reference to the 34th Street and Quirt Avenue Over-
pass Project, Terra Testing is pleased to submit this proposal for
construction materials testing services. The quantities listed below
are estimates of the number of tests required as provided by HRR.,-;
Engineers. Terra Testing has not made a separate estimation of
quantities or types of tests required.
There is no charge for mileage within the City of Lubbock.
The charges below, then, include technician's time, laboratory test-
ing, transportation of samples, calculations and reports, copies and
postage. The forty (40) hours extra itemization for technician's time
is intended to cover the charges for technician waiting time beyond
the one hour allowed per trip. These unit prices shall remain good
throughout the duration of the project, up to fourteen (14) months
from the date construction begins.
It is our polity to provide those services required and
requested by the City Engineer or the City Engineer's designated
representative. We would further request that the City of Lubbock,
as our client, provide us with a list of those firms approved to re-
ceive copies of our reports.
Terra Testing Inc. is insured through Fred S. James &
Company of Texas, Inc., underwritten by Lloyds of London. This
policy is our professional liability insurance coverage in the amount
of $500,000.00. A certificate of coverage will be provided at your re-
quest. Of course, Terra Testing also carries the other customary
business insurances. Proof of coverage is also available.
Respectfully submitted,
TERRA TESTING INC.
Shakuntala Vallabhan
President
SV/gs
CX tj 1B / 7- �}