HomeMy WebLinkAboutResolution - 102463D - Street Improvements - L.A. Purtell - GWO 10400 Multiple Locations - 10_24_1963 RESOLUTION ®Zy63T� RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. Q WHEREAS, the City of Lubbock heretofore passed various street 5 improvement ordinances and resolutions and entered into contract with L. A. Purtell (G.W.O. 10,400) for the making and construction of street improvements on portions of numerous streets and/or avenues in said City including among JO others the following; 9th Place from its intersection with a line 9 feet West of the East Property Line of Chicago Avenue to its intersection with a line 10 feet East of the West Property Line of Bangor Avenue, known and designated as Sub-Unit Number 1 of Unit Number 2096. 17th Street from its intersection with a line 16 feet West of the West Property Line of Quaker Avenue to its intersection with a line 105.4 feet West of the West Property Line of Raleigh Avenue, known and designated as Sub-Unit Number 6 of Unit Number 2099. 18th Street from its intersection with a line 26 feet West of the West Propert Line of Quaker Avenue to its intersection with a line 13 feet East of the East Property Line of Raleigh Avenue, known and designated as Sub-Unit Number 10 of Unit Number 2099. 21st Street from its intersection with a line 3 feet West of the West Property Line of Bangor Avenue to its intersection with a line 11 feet East of the East Property Line of Chicago Avenue, known and designated as Sub-Unit Number 14 of Unit Number 2099. Indiana Avenue from its intersection with a line 8 feet South of the South Property Line of 3rd Street to its intersection with a line 50 feet South of the North Property Line of 4th Street (East Side), known and designated as Sub-Unit Number 1 of Unit Number 2105. Indiana Avenue from its intersection with a line 5 feet South of the South Property Line of 2nd Street to its intersection with a line 8 feet South of the South Property Line of 3rd Street, known and designated as Sub-Unit Number 2 of Unit Number 2105. Indiana Avenue from its intersection with a line 5 feet South of the South Property Line of 1st Street to its intersection with a line 5 feet South of the South Property Line of 2nd Street, known and designated as Sub-Unit Number 3 of Unit Number 2105. Indiana Avenue from its intersection with a line 5 feet South of the South ' Property Line of 1st Street to its intersection with a line 5 feet South of the South Property Line of Auburn Street, known and designated as Sub-Unit Number 4 of Unit Number 2105. Indiana Avenue from its intersection with a line 5 feet South of the South Property Line of Auburn Street to its intersection with the North Property Line of Baylor Street, known and designated as Sub-Unit Number 5 of Unit Number 2105. i a Indiana Avenue from its intersection with the North Property Line of Baylor Street to its intersection with a line 4.66 feet North of the North Property Line of Cornell Street, known and designated as Sub-Unit Number 6 of Unit Number 2105. Indiana Avenue from its intersection with a line 4.66 feet North of the North Property Line of Cornell Street to its intersection with a line 8 feet North of the North Property Line of Duke Street, known and designated as Sub-Unit Number 7 of Unit Number 2105. Indiana Avenue from its intersection with a line 8 feet North of the North Property Line of Duke Street to its intersection with a line 30 feet North of the South Property Line of Erskine Road (East Side), known and designated as Sub-Unit Number 8 of Unit Number 2105. AND WHEREAS, the improvements upon the said portions of the above- mentioned streets and/or avenues, have been inspected and found to have been co - structed in accordance with terms of said contract G.W.O. 10400. THEREFORE, BE TT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets and/or avenues be and the same are hereby accepted, providing the contractor provides maintenance on these improvements for a period of one year and at the end of this time provides a seal coat of 0.25 gal. of asphalt per square yard and one cubic yard of gravel to 125 square yards, and the City Engineer be and he is hereby authorized to direct payment of the Cityls portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied against the parcels of property abutting upen the said portions of the streets and/or avenues listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the pro- ceedings with reference to said improvements and assessments where such assessments were levied. III. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 24TH DAY OCTOBER, 1963. Jack F. Strong, May r ATTEST: Lavenia Lowe, Cie Y//Secretarlyr - D G am . n T. Hickerson, City Engineer Fred 0. Senter, Jr., Ci _ttorney e , City of Lubbock POrter 3-3491 916 Texas Avenue Lubbock, Texas October 24, 1963 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by L. A. Purtell, paving contractor, under his contract dated April 1, 1963, designated as G.W.O. 10400 and find the improvements on 9th Place, 17th Street, 18th Street, 21st Street and Indiana Ave. as listed on the final estimate and assessment sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due him by the City of Lubbock and issue assignable certificates against property owners for the respective amounts shown on the attached final assessment sheets as being due against them and their respective properties. Yours very truly, John T. Hickerson City Engineer CONSOLIDATED FINAL ESTIMATE GWO 10400 Accepted October 24, 1963 QUANf ITIES S.Y. S.Y. S.Y. S.Y. S.Y. Unit & Paving Paving L.F. Alley Valley Re-sur- Gal. C.Y Sub-Unit Location 911 Base 6" Base C & G Return Gutter facings Asphalt Roc 2096-1 9th Place from 91 West of the EPL of Chicago Ave. to 101 East of the WPL of Bangor Ave. 2,253.30 2,922.88 28.35 21.01 2099-6 17th St. from 161 West of the WPL of Quaker Ave. to 105.41 West of the WPL of Raleigh Ave. 2,744.28 1,389.60 283.65 186.50 0.7 2099-10 18th St. from 261 West of the WPL of Quaker Ave, to 13' East of the EPL of Raleigh Ave. 1,965.51 1,032.30 188.44 2099-14 21st St. from 31 West of the WPL of Bangor Ave. to 111 East of the EPL of Chicago Ave. 3,022.93, 1,700.40 2105-1 Indiana Ave. from 81 South of the SPL of 3rd St, to 50t South of the NPL of 4th St.(East Side) 5,207.57 1,115.00 10.67 2105-2 Indiana Ave. from 51 South of the SPL of 2nd St. to 81 South of the SPL of 3rd St. 5,715.12 1,341.12 21.33 2105-3 Indiana Ave, from 5t South of the SPL of 1st St. to 51 South of the SPL of 2nd St. 5,783.91 1,378.60 21.55 104.35 2105-4 Indiana Ave. from 51 South of the SPL of lst St, to 51 South of the SPL of Auburn St. 5,432.00 1,298.24 21.33 182.67 2105-5 Indiana Ave. from 51 South of the SPL of Auburn St. to the NPL of Baylor St. 5,987.78 908.62 10.67 84.44 2105-6 Indiana Ave. from the NPL of Baylor St. to 4.661 North of the NPL of Cornell St. 5,865.56 1,353.65 21.33 CONSOLMTED FINKL ESTMTE GW O 10400 Accepted October 24L 1963 �N�IT ILA S S.Y. S.Y. S.Y. S.Y. S.Y. Unit & Paving Paving L.F. Alley Valley Re-sur- Gal. C.Y. Sub-Unit Location. __911 Base 611 Base C 6, G Return Gutter facing asphalt RoCic 2096-1 9th Place from 91 '(hest of the EPL of Chicago Ave. to 101 East of the WPL of Bangor Ave. 2,253.30 2,922.88 28.35 21.01 2099-6 17th St. from 161 West of the WPL of Quaker Ave. to 105.41 West of the WPL of Raleigh Ave. 2,744.28 1,389.60 283.65 186.50 0.74 2099-10 18th St. from 261 West of the WPL of Quaker Ave. to 131 East of the EPL of Raleigh Ave. 1,965.51 1,032.30 188.44 2099-14 21st St. from 31 West of the WFL of Bangor Ave. to 111 East of the EPL of Chicago Ave. 3,022.93 1,700.40 2105-1 Indiana Ave. from 81 South of the SPL of 3rd St. to 501 South of the NPL of 4th St.(East Side) 5,207.57 1,115.00 10.67 2105-2 Indiana Ave. from 51 South of the SPL of 2nd St. to 81 South of the SPL of 3rd St. 5,715.12 1,341.12 21.33 2105-3 Indiana Ave. from 51 South of the SPL of 1st St. to 51 South of the SPL of 2nd St. 5,783.91 1,378.60 21.55 104.35 2105-4 Indiana Ave. from 51 South of the SPL of 1st St. to 51 South of the SPL of Auburn St. 5,432.00 1,298.24 21.33 182.67 2105-5 Indiana Ave. from 51 South of the SPL of Auburn St. to the NPL of Baylor St. 5,987.78 908.62 10.67 84.44 2105-6 Indiana Ave. from the NPL of Baylor St. to 4.661 North of the NPL of Cornell St. 5,865.56 1,353.65 21.33 QUINT IT IE S _ S.Y. S.Y. ---- S.Y. S.Y. S.Y. Unit & Paving Paving L.F. ,alley Valley Re-sur- Gal. C.Y. Sub-Unit Location 9" Base 6" Base C & G Return Gutter facing, halt Rack 2105-7 Indiana Ave. from 4.66t North of the NFL of Cornell St. to 81 North of the NPL of Duke St. 5,431.81 1,291.03 20.00 183.43 2105-F8 Indiana Ave. from 81 North of the NFL of Duke St. to 30; North of the SPL of Erskine Rd. (E. Side) 5,875.30 1.413.36 20,00 210,54 TOTALS 45,299.05 9,986.02 17,144.80 146.88 793.78 493.10 186.50 0.74 COST ESTIMTE 45,299.05 S.Y. paving (9" base) @ $1.57 $ 71,119.51 9,986.02 S.Y. Paving (6" base) @ 1.35 132481,13 17,144.80 L.F. Curb & Gutter @ 1.37 23,488.37 146.88 S.Y. Alley Return @ 4,50 660.96 793.78 S.Y. valley Gutter @ 5.00 3,968.90 493,10 S.Y. Resurfacing @ 0.90 443.79 186,50 Gal, asphalt @ 0.15 27.97 0.74 C.Y. Rock @ 0.70 0.52 CONTRACT COST $ 113,191.15 COST_ DISTRIBUTION Property City Unit & Contract Owner to Sub-Unit Cost Cost Contractor 2096-1 $ 7,206.96 7,567.31 - 360.35 2099-6 5,892.31 5,420.11 472.20 2099-10 4,237.29 4,473.99 - 236.70 2099-14 6,410.50 6,865.64 - 455.14 2105-1 9,751.45 1,955.29 7,796.16 2105-2 10,906.06 211178.60 8,727.46 2105-3 11,588.15 20097.92 9,490.23 2105-4 11,316.16 21097.92 9,218.24 2105-5 11,115.84 861.95 10,253.89 2105-6 11,159.41 2,568.67 8,590.74 2105-7 11,303.80 2,057.55 9,246.25 2105-8 12 303.02 29198.76 10 104.46 $113,191.15 40$ 43.71 72,847.44 Less $200.00 per block for - 800.00 four blocks and 20% of Cityfs extra width on Indiana,to be retained - 7,925.17 for one year Now Due Contractor $ 64,122.27 QU&NT IT IES S.Y. S.Y. S.Y. S.Y. S.Y. Unit & Paving Paving L.F. Alley Valley Re-sur- Gal. C.Y. Sub-Unit Location 911 Base 611 Base C & G Return Gutter facing Asphalt Rock 2105-7 Indiana Ave. from 4.661 North of the NPL of Cornell St. to 8' North of the NPL of Duke St. 5,431.81 1,291.03 20.00 183,43 2105-8 Indiana Ave. from 81 North of the NPL of Duke St. to 301_North of the SPL of Erskine Rd. (E. Side) 5,875.30 1,413.36 20.00 210.54 TOTALS 45,299.05 9,986.02 17,144.80 146.88 793.78 493.10 186.50 0.71 COST EST1M6*TE 45,299.05 S.Y. Paving (9" base) @ $1.57 $ 71,119.51 9,986.02 S.Y. Paving (61.' base) @ 1.35 13,481.13 17,144.80 L.F. Curb & Gutter @ 1.37 23,488:37 146.88 S.Y. Alley Return @ 4.50 660.96 793.78 S.Y. Valley Gutter @ 5.00 3,968:90 493.10 S.Y. Resurfacing @ 0.90 443.79 186.50 Gal. Asphalt @ 0.15 27.97 0.74 C.Y. Rock @ 0.70 0.52 CONTRACT COST $ 113,191.15 COST DISTRIBUTION Property City Unit & Contract Owner to Sub-Unit Cost cost Contractor 2096-1 $ 7,206.96 7,567.31 - 360.35 2099-6 5,892,31 5,420.11 472.20 2099-10 4,237.29 4,473.99 - 236.70 2099-14 6,410.50 6,865.64 - 455.14 2105-1 9,751.45 1,955.29 7,796.16 2105-2 10,906.06 2,178.60 8,727.46 2105-3 s 11,588.15 2,097.92 9,490.23 2105-4 11,316.16 2,097.92 9,218.24 2105-5 11,115.84 861.95 10,253.89 2105-6 11,159.41 2,568.67 8,590.74 2105-7 11,303.80 2,057.55 9,246.25 2105-8 12,303.02 2,198.76 10,104.46 $113,191.15 40,343.71 72,847.44 Less $200oOO per block for - 800.00 four blocks and 20% of Cityls extra width on Indiana,to be retained - 7,925.17 for one year Now Due Contractor $ 64,122.27 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT 17th STREET C Sheet Na. 1 of 1 City of Lubbock Sub-Unit No. 6 of Width 36 Feet From 105.41 W. of the WPL of Raleigh Ave. to 16.01 W. of the WPL of Quaker Ave. Unit No. 2099 Paving Curb & Gutter Owner Lots Blk. Addition $2.59913975 Rate/L.F. $1.4385 Rate/L.F. Total No. No. Ft. Cost Cost Cost NORTH SIDE Winton C. Sulton at ux 1 6 West Gate Dr. Add. 91.80 238.60 132.05 370.65 Inst. #3 Henry J. Shine at ux 2 6 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Inst. #3 Robert Melcher 3 and 4 6 West Gate Dr. Add. 200.00 519.83 287.70 807.53 inst. #3 Vera V. Wilmeth 5 6 West Gate Dr. Add. 100.00 259.91 143.85 403.76 inst. #3 Stephen W. & Mary Noble 6 6 West Gate Dr. Add. 87.00 226.13 125.15 351.28 inst. #3 Pearl B. Lary 1 5 West Gate Dr. Add. 92.40 240.16 132.92 373.08 Inst. #3 SOUTH SIDE Bryan Martin at ux 11 3 West Gate Dr. Add. 92.40 240.16 132.92 373.08 Inst. #2 W49" RalmrnM4dox, at vir 7 4 West Gate Dr. Add. 87.00 226.13 125.15 351.28 Inst. #2 Richard H. Worley 8 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Inst. #2 Seaman Smith 9 4 West Gate Dr. Add. l0U.U0 259.91 143.85 403.76 Inst. #2 Albert Payne at ux 10 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Inst. #2 George Heather 11 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Inst. #2 James A. Nunley, Jr. at ux 12 4 West Gate Dr. Add. 91.80 238.60 132.05 370.65 Inst. #2 TOTAL PROPERTY RUINER COST $ 5,420.11 CITY'S SHARE 766.82 TOTAL FINAL SUB UNIT COST $ 6,186.93 i Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT 18TH STREET Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 10 of Width 36 Feet From 131 E. of the EPL of Raleigh Ave. to 261 W. of the WPL .of Quaker Ave. Unit No. 2099 Paving Curb & Gutter Owner Lots Blk. Addition $2.59913975 Rate/L.F. $1.4385 Rate/L.F. Total No. No. Ft. Cost Diff.No.Ft. Cost Cost NORTH SIDE Jeanne C. Qualia 1 4 West Gate Dr. Add. 91.80 238.60 65.80 94.65 $ 333.25 Annie Mae Tudor 2 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 0. E. Neal, Sr. 3 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 W. J. Martin, at ux 4 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Ted T. Tipps, at ux 5 4 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Floyd Dawson 6 4 West Gate Dr. Add. 87.00 226.13 125.15 351.28 SOUTH SIDE A. D. Ferguson 7 1 West Gate Dr. Add. 87.00 226.13 (existing) 226.13 D. L. Creemen 8 1 West Gate Dr. Add. 100.00 259.91 143.85 403.76 H. M. Reed, Jr. at ux 9 1 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Don Hilmar Bilberry at ux 10 1 West Gate Dr. Add. 100.00 259.91 143.85 403.76 Earl F. Mabus 11 1 West Gate Dr. Add. 100.00 259.91 143.85 403.76 B. R. Brady 12 1 West Gate Dr. Add. 91.80 238.60 65.80 94.65 333.25 TOTAL PROPERTY CWNER COST $ 4,473.99 CITY;S SHARE - 24.84 TOTAL FINAL SUB UNIT COST $ 4,449.15 Acceptance Date 10-24-63 FINAL PAVING ASSESSMENT 21ST STREET G.W.O. 10,400 CITY OF LUBBOCK Sheet No. 1 of 1 Width 36 Feet From 31 W. of the WPL of Bangor Avenue to 11" E. of the EPL of Chicago Avenue Sub-Unit No. 14 of Unit No. 2099 Paving Curb & Gutter Owner Lots Blk. Addition 42.59913975 Rate/L.F. $1.4385 Rate/L.F. Total No. No. Vt. cost cost Cost NCRTH SIDE Frank D. Wilson 8 2 Robert Neill Heights 109.20 283.83 157.08 440.91 Frank D. Wilson 9 2 Robert Neill Heights 120.00 311.90 172.62 484.52 Frank D. Wilson 10 2 Robert Neill Heights 120.00 311.90 172.62 484.52 E. Joe Lee 11 2 Robert Neill Heights 120.00 311,90 172.62 484.52 J. B. Joiner 12 2 Robert Neill Heights 120.00 311.90 172.62 484.52 J. B. Joiner 13 2 Robert Neill Heights 132.00 343.09 189.88 532.97 J. B. Joiner 14 2 Robert Neill Heights 129.00 335.29 185.57 520.86 SOUTH SIDE Frank D. Wilson 7 3 Robert Neill Heights 109.20 283.83 157.08 440.91 Frank D. Wilson 6 3 Robert Neill Heights 120.00 311.90 172.62 484.52 Frank D. Wilson 5 3 Robert Neill Heights 120.00 311.90 172.62 484.52 Frank D. Wilson 4 3 Robert Neill Heights 120,00 311.90 172.62 484.52 G. A. Edwards 3 3 Robert Neill Heights 120,00 311.90 172.62 484.52 Frank D. Wilson 2 3 Robert Neill Heights 132.00 343.09 189.88 532.97 Roy B. Carnes 1 3 Robert Neill Heights 129.00 335.29 185.57 520.86 TOTAL PROPERTY OWNER COST $ 6,865.64 CTTY'S SHARE - 134.61 TOTAL FINAL SUB UNIT COST 4 6,731.03 Acceptance Date 10-24-63 FINAL PAVING ASSESSMENT E 1/2 OF INDIANA AVENUE G.W.O. 10,400 Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 1 of Width P10 Feet From 501 S. of the NFL of 4th Street to 80 S. of the SPL of 3rd Street Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. 42.59589102 Rate/L.F. 41.4385 Rate/L.F. Total No. Addition No.Et. cost Diff. No.Ft. Cost Cost EAST SIDE Rogers McCown et ux Lot 17 less the south 40.0 feet 10 Westhaven Addition 95,00 246.61 80.00 115,08 361.69 E. G. White, Jr. 16 10 Westhaven Addition 125.00 324.49 179.81 504.30 T. V. Johnson 17 9 Westhaven Addition 135.00 350.45 194.20 544.65 E. G. White, Jr. 16 9 Westhaven Addition 135.00 350.45 194.20 544.65 WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 1,955.29 CITY'S SUARE 8,283.73 TOTAL FIIAL SUB UNIT COST $10,239.02 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 of Indiana Avenue Sheet No. 1 of 1 Sub•Unit No. 2 of CITY OF LUBBOCK From 81 S. of the SPL of 3rd St. to 51 S. of the SPL of 2nd St. Unit No. 2105 Width go Feet Paving Curb & Gutter Owner Lots Blk. Addition $2.59589102 Rate/L.F. $1.4385 Rate/L.F. Total _ No. No. Ft. Cost Cost Cost EAST S IDE E. G. White, Jr. 17 4 Westhaven Addition 135.00 350.45 194.20 544.65 Dora Breedlove (See D. C. Suit #12699 Vol. 312, Page 58, Lubbock Co. Deed Records) 16 4 Westhaven Addition 135.00 350.45 194.20 544.65 E. G. White, Jr. 16 3 Westhaven Addition 135.00 350.45 194.20 544.65 E. G. White, Jr. 17 3 Westhaven Addition 135.00 350.45 194.20 544.65 WEST SIDE (No Assessment) (No Assessment) Total PROPERTY OWNER COST $ 2,178.60 CITY'S SNARE 9,272.76 TOTAL FINAL SUB UNIT COST 411,451.36 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 OF INDIAN& AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 3 of Width 80 Feet From 51 S. of the SPL of 1st Street to 5t S. of the SPL of 2nd Street Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. Addition $2.59589102 Rate/L.F. $1.4385 Rate/L.F. Total No. No. Ft. Cost Cost Cost EAST SIDE Billy J. Goldman et ux Frances 12 13 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Harold C. Dickson 11 13 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Dorothy Bundrant* 12 12 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Archie Kuykendall et ux 11 12 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 2,097.92 CITY"S SHARE 10,069.64 TOTAL FINAL SUB UNIT COST $12,167,56 *City agreed to purchase paving cert. on June 13, 1963 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 OF IND7ANA AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 4 of Width 80 Feat From 51 S. of the SPL of Auburn Street to 51 S. of the SPL of 1st Street Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. $2.59589102 Rate/L.F. $1.4385 Rate/L.F. Total No. Addition No. Ft. Cost Cost Cost EAST SIDE Robert Trouten* 12 9 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Dennis F. Knox 11 9 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Elbert G. Horton 10 8 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 C. V. Gonzales 9 g McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 2,097.92 CITYtS SHARE 9,784.05 TOTAL FINAL SUB UNIT COST $11,881.97 *City agreed to purchase paving cert. on June 13, 1963 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 OF INDjkNA. AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 5 of Width $0 Feet From NPL of Baylor Street to 51 S. of the SPL of Auburn Street Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. 41.4385 Rate/L.F. Total No. Addition 42.59589102 Rate/L.F. Cost Cost No. Ft. Cost EAST SIDE Joe T. Mansker, et ux* 10 7 McMillan Hts. Inst. #2 130.00 337.47 187.01 524.48 Ray J. Diekemper 9 7 McMillan Hts. Inst. #2 130.00 337.47 Existing 337.47 (No Assessment) 12 6 McMillan Hts. Inst. #1 (No Assessment) Existing (No Assessment) 11 6 McMillan Hts. Inst. #1 (No Assessment) Existing WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 861.95 CITY'S SHARE 10,809.68 TOTAL FINAL SUB UNIT COST $ 11,671.63 *City agreed to purchase paving cent. on June 13, 1963 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 of IIQDLM AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 6 of Width BQ Feet From 4.661 N. of the NPL of Cornell St. to the NPL of Baylor St. Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. $1.4385 Rate/L.F. Total No. Addition No. Ft. Different Rate Cost Cost Cost EAST SIDE George H. Lampe et ux 12 3 McMillan Hts. Inst. #1 130.00 2.59589102 337.47 187,01 524,48 John J. Alonzo* 11 3 McMillan Hts. Inst. 01 130.00 2.59589102 337.47 187.01 524.48 Lubbock Boys Club Lots 11 and 12 2 McMillan Hts. Inst. 01 285.00 3.89383653 1109.74 409.97 1,519.71 WEST SIDS (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 2,568.67 CITY'S SHARE 9,148,71 TOTAL FINAL SUB UNIT COST $11,717.38 *City agreed to purchase paving cert. on June 13, 1963 Acceptance Date 10-24-63 G.W.O. 10,400 FINIAL PAVING ASSESSMENT E 1/2 OF IND7ANA AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 7 of Width 80 Feet From 81 N. of the NPL of Duke Street to 4.661 N. of the NFL of Cornell Street Unit No. 2105 Paving Curb & Gutter Owner Lots Addition $2.59589102 Rate/L.F. $1.4385 Rate/L.F. Total No. Ft. Cost Cost Cost EAST S IDE Roy Townsley, et ux* The west 61.5 feet of Lot 4 Pitts Addition 150.00 389.38 215,78 605.16 Joann Stewart Sherman Lot 3 and the west 6 feet of Lot 2 Pitts Addition 120.00 311.51 172.62 484.13 Edgar Lee Dennis* 3 Dartmouth Addition 120.00 311.51 172.62 484.13 Belve F. Johnson 4 C Dartmouth Addition 120.00 311.51 172.62 484.13 WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY OWNER COST $ 2,057.55 CITY'S SHARE 9,811,44 TOTAL FINAL SUB UNTr COST $11,868.99 *City agreed to purchase paving cert. on June 13, 1963 Acceptance Date 10-24-63 G.W.O. 10,400 FINAL PAVING ASSESSMENT E 1/2 OF INDLiM AVENUE Sheet No. 1 of 1 CITY OF LUBBOCK Sub-Unit No. 8 of Width 80 Feet From 30' N. of the SPL of Erskine Street (E. Side) to 81 N. of the NPL of Duke Street Unit No. 2105 Paving Curb & Gutter Owner Lots Blk. $2.59589102 Rate/L.F. $1.4385 Rate/L.F. Total No. Addition No. Ft. Cost Cost Gost EAST SIDE Geo. E. Nichols, et ux* 9 2 Tech Heights Addition 142.50 369.91 204.99 574.90 Garth E. Stephens, et ux* 8 2 Tech Heights Addition 142.50 369.91 204.99 574.90 Richard Purdy, et ux Yvonne 8 1 Tech Heights Addition 130.00 337.47 187.01 524.48 Chester G. Addington* 7 1 Tech Heights Addition 130.00 337.47 187.01 524.48 WEST SIDE (No Assessment) (No Assessment) TOTAL PROPERTY WNER COST $ 2,198.76 CTTY'S SHARE 10,719.62 TOTAL FI9kL SUB UNIT COST $ 12,918.38 *City agreed to purchase paving cert. on June 13, 1963