HomeMy WebLinkAboutResolution - 092663F - Pavement Improvements - Hodges And Tierney, Inc - Caprock Addition - 09_26_1963 / BESOLUTIC6N
RESOLUTION ACCEPTING MPROVENEMS 014 PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELM:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Caprock Addition, Lots 1222-1294,
made arrangements with Hodges and Tierney, Inc. for the construction of paving
improvements on certain streets dedicated in said subdivision under the
a provisions of said Ordinance prior to the recording of the subdivision plat of.
Caprock Addition, Lots 1222-1294, including the following streets:
67th Street from its intersection with a line 16 feet East of the East Property
Line of Elgin Avenue to its intersection with a line 12 feet East of the West ' '
Property Line of Canton Avenue, known and designated as New Subdivision
Number 1283.
68th Street from its intersection with a line 16 feet East of the East Propert
Line of Elgin Avenue to its intersection with a line 16 feet West of the West
Property Line of Detroit Avenue (South Leg), known and designated as New
Subdivision Number 1284.
69th Street from its intersection with a line 16 feet East of the East
Property Line of Elgin Avenue to its intersection with a line 15 feet West of
the West Property Line of Canton Avenue (South Leg), known and designated as
New Subdivision Number 1285.
Detroit Avenue from its intersection with a line 15 feet North of the North
Property Line of 69th Street (West Leg) to its intersection with a line 15 feet .
West of the West Property Line of Detroit Avenue on 68th Street, known and
designated as New Subdivision Number 1286.
AND WHEREAS, the construction of the above improvements on the
abovementioned .streets was performed under the supervision of the City
Engineer, and said improvements have been completed and have been inspected
and found to have been constructed in accordance with City specifications and
in accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned
streets be and the same are hereby accepted and the City Engineer be and he is
hereby authorized to direct the payment of the C ityls portion of the cost.
II.
This resolution shall take effect and be in force from and after
its passage.
r
PASSED AND APPROVED THIS 26TH DAY OF SEPTEM M, 1963.
Jack F. Strong, May
A.TTE ST
La nia Lowe, Cit Secretary
'-APPROVED:
J T. Hickerson, City"Engineer
APPROVED:
Fred"O. Senter, Jr, ty torney
City of Lubbock
POrter 3-3491
{
i 916 Texas Avenue
Lubbock, Texas
September 26, 1963
Honorable Mayor and City Commission
Lubbock, Texas -
Gentlemen;
I have examined the paving improvements constructed by Hodges
and Tierney, .Inc., paving contractor, under their contract with'the:'
subdividers of Caprock Addition, Lots 1222-1294 and .find the improvements
on 67th Street, 68th Street, 69th_Street and Detroit Avenue is Listed
on the final -estimate sheet to have 'been compteted_in accordance viith the
plans and specifications and recommend tbat 'you accept the improvements on
.said streets and/or avenues, authorizing payment to the contractor the
amount shown on the'"attached consolidated final estimate sheet as due them
by the City of Lubbock.
Yours very truly,
(�a 7, gck�
ohn T. Nickerson
City Engineer
CONSOLMTED FINAL ESTIMATE
C&MOCR ADDITION LOTS 1222-1294
Acce tamed September 26, 1963
QUANTITIES
S.Y. S.Y.
Unit- tx S.Y. L.F. 411ey Valley Drainag,
Sub-Unit Location Paving _ C_&_G get.• Gutter Block
N.S. 1283 67th'St. from 16t East of the
EPL of Elgin Ave. to 12"East
of..the-WPL of„Canton Ave. . 4,160.00 2,389.07 52.54
N.S. 1284 68th St. from 160 East of the
EPL of Elgin Ave. to 161 West
of-tbs WPL of Detroit ,lane.
(S. Leg) _ 2,906.67 1,635.00
R.S. 1285 69th St. from 161 East of the
EPL of Elgin Ave. to 15t,„West
of-t he WPL of Canton Ave*
4,233.32 2,369.43 21.42 63.82 1
N.S. 1286 Detroit Ave. from 15t North
Qf the NPL of 69th St. (W.Leg)
to 15, West of the WPL Qf -
Detroit Ave. on 68th $t. ' 1,451.32 721.12 12.22
" TOTAIS 12,751.31 7,114.62 33.64 116.36 1
COST ESTMTE -
1275101 'S.Y. Paving @ $1.40 $ 179851.83
7,114. 62 L.F. Curb & Gutter @ $1:40 9,960.47
33.64 S.Y. Alley, Return @ $40'75 159079
116.36 S.Y. Valley Gutter @ $5.00 5814'80
1 each drainage Blk. @ $15.00 15.00
CON1'RAZT COST $ 28,568.89
COST DISTRIBUTION
. Property
Unit Contract garner
Sub�-Unit Cost Cost
Nose, 1283 90431040 92431.40
N.S. 1284 6,358.34 6,358.34
N.S. 1285 919679.69 9,679.69
N.S. 1286 3,099:46 3:099.46
TOMS $ 28,568.89 $ 28-568 89