HomeMy WebLinkAboutResolution - 091263H - Water_Sewer Improvements - Hamphill Contracting Co - West Gate Drive Addition - 09_12_1963 RESOLUTION 4
c�IIZ 3
Resolution accepting water and sewer system improvements for Lots 1
thru 22, Blocks 16 & 17, West Gate Drive Addition
WHEREAS, the developers of Lots 1 thru 22, Blocks 16 & 17, West Gate
Drive Addition have complied with the provisions of the City of Lubbock Code,
f Chapter 34, Article 2, by providing the water and sewer improvements for said
addition in accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $10,568.42
with the improvements constructed by Hemphill Contracting Company having a
value of $8524#56 as determined by the unit prices established by said
Chapter 34, and $2043.86 cash (engineering, wet tie-ins, paving repair,
difference in Pro Rata and actual cost) paid to the City with G.E.M.S. Co.,
the developer, to receive a refund of $1208.77 in accordance with Chapter 34
of the Code of the City of Lubbock, and
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of .Lubbock.
2. That refund of the refundable cost in the amount of $1208.77
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 12TH Y OF SEPTE 1963.
�14Jac F. Strong,
Atte stA d:
l�
Lav nia Lawe, Ci y Secre ary
Approved: /
Jahn T. Hickerson, City Engineer
u
Apr
Fred 0. S ter, Jr., ' y Attorney