HomeMy WebLinkAboutResolution - 091263F - Water_Sewer Improvements - Hemphill Contracting Co - Richland Hills Addition - 09_12_1963 FNor
RESOLUTION
Resolution accepting water and sewer system improvements for Lots 273
thru 309, Richland Hills Addition
WHEREAS, the developers of Lots 273 thru 309, Richland Hills Addition
have comp lied with the provisions of the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $8722.36 with the
improvements constructed by Hemphill Contracting Company having a value of
$8125.85 as determined by the unit prices established by said Chapter 34, and
$596.51 cash (engineering, wet tie-ins, paving repair, difference in Pro Rata
and actual cost) paid to the City with George Fields, the developer, to
receive a refund of deposit in the amount of $27.53 and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That a refund of deposit be made in the amount of $27.53.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 12TH DAY SEPTEMER 19
Jack . Strong, Mayor
Antes
la fin Lowe, CA y Secret$ry
Approved:
ohn T. Hickerson, City Engineer
Ap roved:
Fred 0. Senter, Jr., Ci ttarney
r^.