HomeMy WebLinkAboutResolution - 091263E - Water_Sewer Improvements - Hemphill Contracting Co - Beverly Heights Addition - 09_12_1963 RE S OLUT ION 01 eAs
Resolution accepting water and sewer system improvements for hots
265 thru 296, Beverly Heights Addition
WHEREAS, the developers of Lots 265 thru 296, Beverly Heights
Addition have complied with the provisions of the City of Lubbock Code,
Chapter 34, Article 2, by providing the water and sewer improvements for said
j addition in accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $8580.37 with
the improvements constructed by Hemphill Contracting Company having a value of
$7125.84 as determined by the unit prices established by said Chapter 34, and
$1498.98 cash (engineering, wet tie-ins, paving repair, difference in Pro Rata
and actual cost) paid to the City with South College Developers and Municipal
Development Co., the developers, to receive a refund of $1535.97 in
accordance with Chapter 34 of the Code of the City of Lubbock, and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbockts plans and
specifications,
Nal THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the
City of Lubbock.
2. That refund of the refundable cost in the amount of $1535.97
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 12TH DAY SEPTEMBE 963.
ck F. Strong, May
Attes e ;
r 'n
Lav nia Lowe, Ci `"S•ecretary
Approved:
J hn T. Hickerson, City Engineer
Approved:
Fred 0. Senter, Jr., City orney