HomeMy WebLinkAboutResolution - 091263C - Pavement Improvements - Kerr Construction Co - Green Lawn Addition - 09_12_1963 RES BLUT ION 011%sc
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND; OR'
REVENUES AS LISTED BELM:
WHEREAS, in conformance with the paving requirement provisions of
9 ' Z- City Ordinance 1331, the subdivider of Green Lawn Addition, made arrangements
with Kerr Construction Company for the construction of paving improvements on
certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Green Lawn
including the following streets:
The East 1/2 of Bangor Avenue from its intersection with a line 15 feet South
of the South Property Line of 33rd Street (East Leg) to its intersection with
the North edge of strip paving in 34th Street, known and designated as New
Subdivision Unit Number 431.
Chicago Avenue from its intersection with a line 3 feet South of the South
Property Line of the alley South'nof 32nd Street to its intersection with a line
3 feet South of the South Property Line of the alley South of 33rd Street,
known and designated as New Subdivision Unit Number 1316.
33rd Street from its intersection with a line 16 feet East of the East
Property Line of Chicago Avenue to its intersection with the center line of
Bangor Avenue, known and designated as New Subdivision Unit Number 1317.
Belmont Avenue from its intersection with a line 3 feet South of the South
Property Line of the alley South of 32nd Street to its intersection with a
line 15 feet North of the North Property Line of 33rd Street, known and desig-
nated as New Subdivision Unit Number 1318.
The W 1/2 of Bangor Avenue from its intersection with a line 19.65 feet South
of the South Property Line of 33rd Street (West Leg) to• its intersection
with a line 2.03 feet South of the South Property Line of the alley South of
33rd Street, known and designated as New Subdivision Unit Number 1319.
Chicago Avenue from its intersection with a line 3 feet South of the South
Property Line of the alley South of 33rd Street to its intersection with the
North edge of strip paving in 34th Street, known and designated as New
Subdivision Unit Number 1320.
The West 1/2 of Bangor Avenue from its intersection with a line 2.03 feet
South of the South Property Line of the alley South of 33rd Street to its
intersection with the North edge of strip paving in 34th Street, known and
designated as New Subdivision Unit Number 1321.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the -Cityls portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 12TH DAN OF SEPTEMBER, 1963.
Jack F. Strong, Mayor
7-
ATTE
Ar
Lc we,, 4ity Secretary
APPROVED:
2' on T. Hickerson, City Engineer
APPROVEVE7D:
Fred 0. Senter, ''Jr., C Attorney
City of Lubbock
POrter 3-3491
916 Texas Avenue
-` �roaeNFi�FA r�
"~ Lubbock, Texas
September 12, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen.
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under their contract with the
subdividers of Green Lawn Addition and find the improvements on Bangor
Avenue, Belmont Avenue, Chicago Avenue and 33rd Street as listed on the
final estimate sheet to have been completed in accordance with the plans
and specifications and recommend that you accept the improvements on
said streets and/or avenues, authorizing payment to the contractor the
amount shown on the attached consolidated final estimate sheet as due
them by the City of Lubbock.
Yours very truly,
?hnMT. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMTE
GREE NL4WN ADD IT ION
LOTS 239 - 275
Accepted September 12, 1963
0UANT IT IES
S.Y. S.Y. S.Y.
Unit & S.Y. L.F. Alley Valley Re-
Sub-Unit Location Paving C & G Ret. Gutter surfacing
NS 431 The E 1/2 of Bangor Ave. from 151 So of 662.53
the SPL of 33rd Ste to the N. edge of
strip of paving in 34th St.
NS 1316 Chicago Avenue from 31 S. of the SPL of 1445,11 605.08 12.22 91.04
the alley S. of 32nd St. to 31 S. of the
SPL of the alley S. of 33rd St.
NS 1317 33rd St. from 161 E. of the EPL of Chicago 4507.41 2391,38 119.64
Ave. to the L of Bangor Ave.
NS 1318 Belmont Ave. from 31 S. of the SPL of the 344,89 194.00
alley S. of 32nd St. to 151 N. of the
NPL of 33rd St.
NS 1319 The W 1/2 of Bangor Ave. from 19.65t S. 226.35 137.69 13.81
of the SPL of 33rd St. to 2,03 i S. of
the SPL of the alley S. of 33rd St.
NS 1320 Chicago Ave. from V S. of the SPL of 795,59 256.10
the alley S. of 33rd St., to the N. edge
of strip paving in 34th St.
NS 1321 W 1/2 of Bangor Ave. from 2.031 S. of 520.18 184.00
the SPL of the alley S. of 33rd St. to
the N. edge of strip paving in 34th St.
TOTALS 8502,06 3768.25 26.03 91.04 119.64
COST EST7MEITE
8502.06 S.Y. Paving @ $1.45 $ 129327.99
3768,25 L.F. Curb & Gutter @ $1.40 5,275.55
26,03 S.Y. Alley Return @ $4..50 117.14
91,04 S.Y. Valley Gutter @ $4.50 409.68
119.64 S.Y. Resurfacing @ $1.00 119.64
CONTRACT COST $ 18,250.00
COST DISTRIBUTION
Escrow
Unit & Contract Green Lawn City to to be Church
Sub-Unit Cost Cost Contractor Released Cost
NS 431 960.67 960,67
NS 1316 3,407.19 2,376.54 305.96 724.69
NS 1317 10,003.32 9,883.68 119.64
NS 1318 771.69 771.69
NS 1319 583.12 583.12
NS 1320 1,512.15 694.18 123.79 694.18
NS 1321 1,011.86 1,011.86
TOTAIS $18,250.00 15,321.07 549.39 960.67 1,418.87