Loading...
HomeMy WebLinkAboutResolution - 082263I - Pavement Improvements - Kerr Construction Co - Crestwood Addition - 08_22_1963 + RESOLUTION -68ZZ43 3 RESOLUTION ACCEPTING DIPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Crestwood Addition, made arrangements 3 with Kerr Construction Co. for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Crestwood Addition including the following street: rol 59th Street from its intersection with a line 12 feet West of the East Property Line of Indiana Avenue to its intersection with center line of Hartford Avenue and designated as New Subdivision Unit Number 1330. AND WHEREAS, the construction of the above improvements on the abovementioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. . That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby �^ authorized to direct the payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 22ND AUGUST, 1963. -t—P�Ke � Jack Fe 'Strong, May r ATTEST. Lave is Lowe, Ci Becr tary AP OVED: nn J hn T. Hickerson, City Engineer APPROVED: Fred 0. Senter, Jr., Cit t rney •- City of Lubbock POrter 3-3491 1 Mir 916 Texas Avenue Lubbock, Texas August 22, 1963 Honorable Mayor and City C-r ission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Company, paving contractor, under their contract with the subdividers of Crestwood Addition and find the improvements on 59th Street as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said street, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, 1-0 IkT. Hickerson City Engineer � A CONSOLIDATED FINAL ESTIMATE CRESTWOOD ADDITION Accepted August 22, 1963 QUANTITIES S.Y. S.Y. Gal. Cu. DrainaE Unit & S.Y. L.F. Alley Extra Yd. Channel Sub-Unit Location Paving C & G Ret. Caliche AsEhalt Rock Block NS 1330 59th St. from 121 W. of 1946.63 1359.83 90.00 184.89 74.00 1.85 1 the EPL of Indiana Ave. to the ,L of .Hartford Aves COST ESTIMATE 1946.63 S.Y. Paving @ $1.45 $ 2,822.61 1359,83 L.F. Curb & Gutter @ $1.40 1,903.76 90.00 S.y. Alley Return @ $4.50 405.00 184.89 S.Y. Extra Caliche @ $0.75 138.67 74.00 Gal. Extra Asphalt @ $0.16 11.84 1.85 Cu. Yd. Extra Rock @ $6.00 11.10 1 Each Drainage Channel Block @ $25.00 25.00 CONTRACT COST $ 5,317.98 COST DISTRIBUTION Property City Unit & Contract Owner to Sub-Unit Cost Cost Contractor NS 1330 $ 5,317.98 $ 5,156.37 $ 161.61