HomeMy WebLinkAboutResolution - 082263I - Pavement Improvements - Kerr Construction Co - Crestwood Addition - 08_22_1963 + RESOLUTION -68ZZ43 3
RESOLUTION ACCEPTING DIPROVEMENTS ON A PORTION OF A STREET AS
LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Crestwood Addition, made arrangements
3 with Kerr Construction Co. for the construction of paving improvements on a
certain street dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Crestwood Addition
including the following street:
rol 59th Street from its intersection with a line 12 feet West of the East Property
Line of Indiana Avenue to its intersection with center line of Hartford Avenue
and designated as New Subdivision Unit Number 1330.
AND WHEREAS, the construction of the above improvements on the
abovementioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I. .
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is hereby
�^ authorized to direct the payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 22ND AUGUST, 1963.
-t—P�Ke �
Jack Fe 'Strong, May r
ATTEST.
Lave is Lowe, Ci Becr tary
AP OVED: nn
J hn T. Hickerson, City Engineer
APPROVED:
Fred 0. Senter, Jr., Cit t rney
•- City of Lubbock
POrter 3-3491
1 Mir
916 Texas Avenue
Lubbock, Texas
August 22, 1963
Honorable Mayor and City C-r ission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Construction Company, paving contractor, under their contract with the
subdividers of Crestwood Addition and find the improvements on 59th
Street as listed on the final estimate sheet to have been completed in
accordance with the plans and specifications and recommend that you
accept the improvements on said street, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due them by the City of Lubbock.
Yours very truly,
1-0
IkT. Hickerson
City Engineer
� A
CONSOLIDATED FINAL ESTIMATE
CRESTWOOD ADDITION
Accepted August 22, 1963
QUANTITIES
S.Y. S.Y. Gal. Cu. DrainaE
Unit & S.Y. L.F. Alley Extra Yd. Channel
Sub-Unit Location Paving C & G Ret. Caliche AsEhalt Rock Block
NS 1330 59th St. from 121 W. of 1946.63 1359.83 90.00 184.89 74.00 1.85 1
the EPL of Indiana Ave.
to the ,L of .Hartford Aves
COST ESTIMATE
1946.63 S.Y. Paving @ $1.45 $ 2,822.61
1359,83 L.F. Curb & Gutter @ $1.40 1,903.76
90.00 S.y. Alley Return @ $4.50 405.00
184.89 S.Y. Extra Caliche @ $0.75 138.67
74.00 Gal. Extra Asphalt @ $0.16 11.84
1.85 Cu. Yd. Extra Rock @ $6.00 11.10
1 Each Drainage Channel Block @ $25.00 25.00
CONTRACT COST $ 5,317.98
COST DISTRIBUTION
Property City
Unit & Contract Owner to
Sub-Unit Cost Cost Contractor
NS 1330 $ 5,317.98 $ 5,156.37 $ 161.61