HomeMy WebLinkAboutResolution - 082263E - Water_Sewer Improvements - Panhandle Construction Co - Crestwood Addition - 08_22_1963 d`
RESOLUTION
omosr
rI „�
-- �r Resolution accepting water and sewer system improvements for Lots 8
thru 21, Crestwood Addition
Cs
WHEREAS, the developers of Lots 8 thru 21, Crestwood Addition have
complied with the provisions of the City of Lubbock Code, Chapter 34, Article
2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $5,653.60 with
the improvements constructed by Panhandle Construction Co. having a value of
$4,562.28 as determined by the unit prices established by said Chapter 34, and
$1,185.16 cash (engineering, wet tie-ins, paving repaid. ii repce in Pro Rata
and actual cost aid to the City with the develo er to rece or on
p y p ,/ ve a refund of
$1,263.25 in accordance with Chapter 34 of the Code of the City of Lubbock and
a refund of deposit in the amount of $93.84 and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE TC RESOLVED BY THE CITY COMMISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $1,263.25
be made in accordance with said Chapter 34.
3. That a refund of deposit be made in the amount of $93,84.
4. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 22ND DAY OF AUGUST, 1963.
ack F. Strong, Mayor
Attested•
Laveni Lowe, City Secretary
A roved
ohn T. Hickerson, City Engineer
Approved:
Fred 0. Senter, Jr., Cit ttozney