HomeMy WebLinkAboutResolution - 080863A - Alley Improvements - City Engineer - 15Th Street - 08_08_1963 RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF AN ALLEY AS LISTED
BELOW:
WHEREAS, the City of Lubbock passed a resolution on June 13, 1963
authorizing the construction of alley improvements by Welch Brothers Cement
�,--� Contractors on a portion of the following alley:
The East-West alley between 15th Street and 16th Street from 122 East of the
\^ � West Property Line of Avenue X to 123.5t East of the East Property Line of
College Avenue, known and designated as Sub-Unit Number 29 of Unit Number A-344
AND WHEREAS, the improvements upon the said portion of the above-
mentioned alley have been inspected and found to have been constructed accord-
ing to the approved plans and specifications.
THEREFORE, BE Ir RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portion of the abovementioned alley be,
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's share.
II.
r^ This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 8TH DAY OF UGUST, 1963.
ack F. Strong, Mayor
ATTE .
f
Lavenia Lowe, gity Se retary
APPROVED:
J hn T. Hickerson, City Engineer
APPROVED:
Fred O. Senter, Jr., 511 Attorney
• * - City 'of Lubbock
POrter 3-3491
916 Texas Avenue
Lubbock, Texas
August 8, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Welch Brothers Cement Contractors, paving contractor, as authorized
by a resolution passed on June 13, 1963 and find the improvements on
the East-West alley between 15th & 16th Streets from Avenue % to
123.5' E. of College Avenue as listed on the final estimate sheet
to have been completed in accordance with the plans and specifications
and recommend that you accept the improvements on said alley, authorizing
payment to the contractor the amount shown on the attached consolidated
final estimate sheet as due them by the City of Lubbock.
Yours very truly,
C'�John T. Hickerson
City Engineer
CONSOLIDATED FIN&L ESTIMATE
GWO 2817
Accepted August 8,1963
QUANTITIES
Unit & S.Y. L.F.
Sub-Unit Location Paving C & G
A-344-29 The E-W alley between 15th St. and 556.29 34.2
16th St. from 121 E. of the WPL of
Ave. % to 123.5 1 E. of the EPL of
College Ave.
COST ESTIMTE
556.29 S.Y. Paving @ 5.00 2,78145
34.2 L.F. Curb & Gutter @ 2.00 68.40
CONTRACT COST $ 2,849.85
COST D ISTRIBUT ION
Property
Unit & Contract Owner City to
Sub-Unit Cost Cost Contractor
A-344-29 $ 2,849.85 $ 1,179.76 $ 1,670.09
(St. Johns Methodist Church $ 592.08)
(Saint Pauls Church of the Plains $587.68)