HomeMy WebLinkAboutResolution - 1677 - Accept Paving Improvements - Ed Curbo - Lots 4-16 SWCP Addition - 05_10_1984RESOLUTION 1677 - 5/10/84
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Southwest Commercial Park Addition,
Lots 4-16 made arrangements with Ed Curbo Construction for the construction
of paving improvements in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of the above
mentioned addition including the following:
Drainage channel from the south end of existing channel between lots 9 and
10 of Southwest Commercial Park Addition to a distance of 242.26 feet south
designated as NS 2030-66.
AND WHEREAS, the construction of the above improvements was performed
under the supervision of the City Engineer, and said improvements have been
completed and have been inspected and found to have been constructed in
accordance with City specifications and in accordance with the provisions
of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
That the improvements be and the same are hereby accepted and the
City Engineer be and he is hereby authorized to notify the Developer of
acceptance by the Lubbock City Council.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS lOth DAY OF MAY
-4;2z- - -
"I VISA
Alan Ifenry, Ma0yor
ATTEST:
Evb, Iyn G ga, City A e ry
APPROVED AS TO CONTENT:
Don J nning ity Engineer
APPROVED AS TO FORM
ohn Ross, Jr., City Att r y
CONSOLIDATED FINAL ESTIMATE
Southwest Commercial Park Addition
Lots 4-16
May 10, 1984
QUANTITIES
Unit &
Sub Unit Location S. Y. Drainage Channel
2030-66 Drng. Ch. from south end 269.56
of existing channel bet-
ween Lots 9 & 10 to 242.26`S.
COST ESTIMATE
269.56 S. Y. Drainage Channel Lump Sum $6,000.00
;COST DISTRIBUTION
Unit..& Construction Developer
`Sub Unit Cost Cost
2030-66 $6,000.00 $6,000.00