Loading...
HomeMy WebLinkAboutResolution - 1677 - Accept Paving Improvements - Ed Curbo - Lots 4-16 SWCP Addition - 05_10_1984RESOLUTION 1677 - 5/10/84 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of Southwest Commercial Park Addition, Lots 4-16 made arrangements with Ed Curbo Construction for the construction of paving improvements in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned addition including the following: Drainage channel from the south end of existing channel between lots 9 and 10 of Southwest Commercial Park Addition to a distance of 242.26 feet south designated as NS 2030-66. AND WHEREAS, the construction of the above improvements was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. That the improvements be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the Developer of acceptance by the Lubbock City Council. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS lOth DAY OF MAY -4;2z- - - "I VISA Alan Ifenry, Ma0yor ATTEST: Evb, Iyn G ga, City A e ry APPROVED AS TO CONTENT: Don J nning ity Engineer APPROVED AS TO FORM ohn Ross, Jr., City Att r y CONSOLIDATED FINAL ESTIMATE Southwest Commercial Park Addition Lots 4-16 May 10, 1984 QUANTITIES Unit & Sub Unit Location S. Y. Drainage Channel 2030-66 Drng. Ch. from south end 269.56 of existing channel bet- ween Lots 9 & 10 to 242.26`S. COST ESTIMATE 269.56 S. Y. Drainage Channel Lump Sum $6,000.00 ;COST DISTRIBUTION Unit..& Construction Developer `Sub Unit Cost Cost 2030-66 $6,000.00 $6,000.00