Loading...
HomeMy WebLinkAboutResolution - 071163E - Pavement Improvements - Kerr Construction Co - Mackenzie Terrace Addition - 07_11_1963 RESOLUTION 01?116w000, BELOW: RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF f\ STREET AS LISTED � M WHEREAS, in conformance with the paving requirement provisions of h}j City Ordinance 1331, the subdivider of Mackenzie Terrace Addition, made arrangements with Kerr Construction Co. for the construction of paving improvements on certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Mackenzie Terrace including the following street: East one-half of Quirt Avenue (curb and gutter only) from the south paving line of East 4th Street to its intersection with a line 3 feet South of the South Property Line of the alley South of East 4th Street AND WHEREAS, the construction of the above improvements on the above- mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with city specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. "+ That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the city's portion of the cost and to release escrow money. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 11TH DA JULY, 196 . Jack F. Strong, Mayor ATTEST, LaveXia Lowe, Cit/ Secreta y AFFtOVED: 11A y,.. cc e hn T. Hickerson, City Engineer APPROVED: Fred 0. Seater, Jr., Cit ttorney --� City of Lubbock .' POrter 3-3491 916 Texas Avenue Lubbock, �wc , Texas July 11, 1963 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Construction Co., paving contractor, under their contract with the subdividers of Mackenzie Terrace Addition and find the improvements on East 1/2 of Quirt Avenue (curb and gutter only) as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, j4on tHicie4r�son City Engineer CONSOLIDATED FIN&L ESTIMATE MACKENZIE TERRACE ADD., LOT 3 - TRACT D Accepted July 11, 1963 QUANTITIES S.Y. Unit & L.F. Alley Sub-Unit Location C & G Ret. N.S. 1197 East 1/2 of Quirt Avenue (curb & gutter only) from south paving line of 4th St. to 3' South of the alley South of 4th St. 328.87 9.86 COST ESTIMATE 328.87 L.F. Curb & Gutter @ 1.44 $ 473.57 9.86 S.Y. Alley Ret. @ 5.00 49.30 CONTRACT COST $ 522.87 COST DISTRIBTTPION Escrow Unit & Contract to be Sub-Unit Cost Released N.S. 1197 $ 522.87 $ 522.87