HomeMy WebLinkAboutResolution - 061363H - Street Improvements - Frank B. Hidges Contractors Inc - GWO 2770 66Th Street - 06_13_1963 RESOLUTION 06 1 scol 14
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW.
WHEREAS, the City of Lubbock heretofore passed various street
improvement ordinances and resolutions and entered into contract with Frank B.
Hodges Contractors, Inc. G.W.O. 2770, for the making and construction of
street improvements on portions of streets and/or avenues in said city
' J including the following:
3 66th Street from its intersection with the East Lip Line of College Avenue to
its intersection with a line 15' West of the West Property Line of Avenue W,
known and designated as Sub-Unit 3 of Unit Number 2079.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets and/or avenues, have been inspected and found to have been
constructed in accordance with terms of said contract G.W.O. 2770.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned street
and/or avenues be and the same are hereby accepted, and the City Engineer be
and he is hereby authorized to direct payment of the city's portion of the
cost.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 13TH DAY OF JUNE, 1963.
,. Jack F. Strong, Mayak
ATTES
Lav nia Lowe, Ci Secretary
AP OVED:
J T. Hickerson, City Engineer
APPROVED:
red 0. Banter, Jr., City AtOrney
City of Lubbock
h
POrter 3-3491
916 Texas Avenue
Lubbock, Texas
June 13, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Frank B.
Hodges Contractors, Inc., paving contractor, under their contract dated
March 19, 1962, designated as G.H.O. 2770 and find the improvements on
66th Street as listed on the final estimate sheet to have been completed
in accordance with the plans and specifications and recommend that you
accept the improvements on said streets and/or avenues, authorizing payment
to the contractor the amount shown on the attached consolidated final
estimate sheet as due them by the City of Lubbock.
Yours very truly,
John T. Sickerson
City Engineer
CONSOLIDATED FINAL. ESTIMATE
GWO 2770
Accepted June 13, 1963
QUAM IT IES
S.Y. S.Y. Each L.F. C.Y.
Unit & S.Y* L.F. Alley Valley 5' 3610 Embant
Sub-Unit Location Pavia C & G Ret. Gutter Inlets RCP meat
2079-3 66th Street from the E.Lip
Line of College Ave. to 15'
West of the WPL of Ave. W
(N. Side) 7148.27 2631.90 13.67 47.79 2 103.00 9804.7E
COST ESTIMATE
7148.27 S.Y. Paving @ $1.53 $ M 936.85
2631.90 L.F. Curb & Gutter @ $1.31 3:447.79
13.67 S.Y. Alley Return @ $4.75 64.93
47.79 S.Y. Valley Gutter @ $5.50 262.85
2 Each 51 Inlets @ $135.00 270000
103.00 L.F. 36" RCP @ $8.20 8440'60
9804.78 C.Y. Embankment @ $0.20 1,960o96
CONTRACT COST $ 17,787.98
COST DISTRIBUTION
Unit & Contract City to
Sub-Unit Cost Contractor
2079-3 $ 17,787.98 $ 17,787.98
Less first estimate (10,225.25)
Total City to Contractor $ 7,562.73