Loading...
HomeMy WebLinkAboutResolution - 061363H - Street Improvements - Frank B. Hidges Contractors Inc - GWO 2770 66Th Street - 06_13_1963 RESOLUTION 06 1 scol 14 RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW. WHEREAS, the City of Lubbock heretofore passed various street improvement ordinances and resolutions and entered into contract with Frank B. Hodges Contractors, Inc. G.W.O. 2770, for the making and construction of street improvements on portions of streets and/or avenues in said city ' J including the following: 3 66th Street from its intersection with the East Lip Line of College Avenue to its intersection with a line 15' West of the West Property Line of Avenue W, known and designated as Sub-Unit 3 of Unit Number 2079. AND WHEREAS, the improvements upon the said portions of the above- mentioned streets and/or avenues, have been inspected and found to have been constructed in accordance with terms of said contract G.W.O. 2770. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned street and/or avenues be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the city's portion of the cost. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 13TH DAY OF JUNE, 1963. ,. Jack F. Strong, Mayak ATTES Lav nia Lowe, Ci Secretary AP OVED: J T. Hickerson, City Engineer APPROVED: red 0. Banter, Jr., City AtOrney City of Lubbock h POrter 3-3491 916 Texas Avenue Lubbock, Texas June 13, 1963 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Frank B. Hodges Contractors, Inc., paving contractor, under their contract dated March 19, 1962, designated as G.H.O. 2770 and find the improvements on 66th Street as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, John T. Sickerson City Engineer CONSOLIDATED FINAL. ESTIMATE GWO 2770 Accepted June 13, 1963 QUAM IT IES S.Y. S.Y. Each L.F. C.Y. Unit & S.Y* L.F. Alley Valley 5' 3610 Embant Sub-Unit Location Pavia C & G Ret. Gutter Inlets RCP meat 2079-3 66th Street from the E.Lip Line of College Ave. to 15' West of the WPL of Ave. W (N. Side) 7148.27 2631.90 13.67 47.79 2 103.00 9804.7E COST ESTIMATE 7148.27 S.Y. Paving @ $1.53 $ M 936.85 2631.90 L.F. Curb & Gutter @ $1.31 3:447.79 13.67 S.Y. Alley Return @ $4.75 64.93 47.79 S.Y. Valley Gutter @ $5.50 262.85 2 Each 51 Inlets @ $135.00 270000 103.00 L.F. 36" RCP @ $8.20 8440'60 9804.78 C.Y. Embankment @ $0.20 1,960o96 CONTRACT COST $ 17,787.98 COST DISTRIBUTION Unit & Contract City to Sub-Unit Cost Contractor 2079-3 $ 17,787.98 $ 17,787.98 Less first estimate (10,225.25) Total City to Contractor $ 7,562.73