HomeMy WebLinkAboutResolution - 1572 - CO#18 To Contract - John R Lavis - Labratory Washroom, Health Facility - 02_09_1984DGV:cl
RESOLUTION
RESOLUTION 1572 - 2/9/84
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
No. 18 to a contract between the City of Lubbock and John R. Lavis General
Contractor, Inc., in the amount of $79015.00 for finishing of the labora-
tory washroom with prefinished gypsum wallboard, a suspended ceiling,
lights and an evaporative cooler, which Change Order No. 18 is attached
herewith and which shall be spread upon the minutes of the Council and as
spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this
ATTEST:
J
elyn Ga fga, City S601e y
APPROVED AS TO CONTENT:
uoug uooaU9 rudlic
APPROVED AS TO FORM:
d G. Vandiver,
9th day of February ,1984.
y
r
-'.�}iHNV t UAUz. i NUMbr;X (1b ) LlUnl r,r,N -t j �•.:....�
RESOLUTION 1564 - [ J CONTRACTOR
2�9�84 I ARCHITECT
PROJECT: A NEW HEALTH FACILITY FOR ��� s:_r.,�rf.��.-q:, *•-r,
THE CITY OF LUBBOCK
LUBBOCK, TEXAS
ARCHITECT: BILL COX, ARCHITECT
1710 — 15TH STREET
LUBBOCK, TEXAS 79401 fa
. F
CONTRACTOR: JOHN R. LAVIS GENERAL CONTRACTOR, INC.
2900 ROSA AVENUE
P.O. BOX 3608
EL PASO, TEXAS 79923
,DATE ISSUED: JANUARY 10, 1983
!The General Contractor .isidirected to make the following change(s) to the
above project, upon acceptance by all parties.
Finish the Labratory Washroom area as indicated on the accompaning
plan. This space would not have any finished floor but would require
the addition of vinyl base, prefinished gypsum wall board and suspeni
ceiling with the addition of lights as noted. The addition of a
evaporative cooler in this area is also required as noted on the
accompaning print. Provide for the hanging of 48 linear ft. of meti
wall cabinets as shown.
The amount of the- XXs, t-1t-� VContract will be increased/ X)N-a:tM�X by the
sum of
Seven Thousand and Fifteen Dollars and N0/100 ($ 7,015.00 )
with a change of 20 days in the contract time.
Bill Cox John R. Lavis City of Lubbock
Architect General Contractor Owner
By
f�
Date Date Date FE9 9
r _
i✓
P�aTI N 6
LA
/5.r�n- 23ooGFM • � � 1 .
2" sPEGP Evd PL JEM
- . "Down rya-caFT o.•+ � _
o " IZ F wr/ 4 wA f
d i Cw
0 K
N 1
t ` i
'T
�i►�i1Ld2 a Dot �t9, [ i , , t w=J5.� 1.iCG
i � ! i � �"1?�vr c � s•�v�scrFlr
�`i I ! 1c�JJ►...
FY'l
=A-T RL 4r>
14
=�rvti cYP. e� .vat-�� .....,
t'�1S3=ram Pl N
aw_ E,&L{T{ Apr- C{Z~i, UF= Lumsock