HomeMy WebLinkAboutResolution - 052363F - Pavement Improvements - Hodges And Tierney - West Gate Drive Addition - 05_23_1963 � RESOLUTION
0fZ963F*
C(ri
�- RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELM:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of West Gate-Drive Addition Inst. #8,
made arrangements with Hodges and Tierney for the construction of paving
improvements on certain streets dedicated in said subdivision under the
provisions of said ordinance prior to the recording of the subdivision plat of
West Gate Drive Addition Inst. #8 including the following streets:
llth Street from its intersection with the West Property Line of Lot 11,
Block 17, West Gate Drive Addition Installment No. 8 to its intersection with
the cul-de-sac East of Raleigh Avenue, known and designated as New Subdivision
Unit Number 1255,
Raleigh Avenue from its intersection with a line 3 feet North of the North
Property Line of the alley South of llth Street to its intersection with a line
15 feet South of the South Property Line of llth Street, known and designated
as New Subdivision Unit Number 1256.
West 1/2 of quaker Avenue (concrete only) from its intersection with a line
3 feet North of the North Property Line of the alley North of llth Street to
its intersection with a line 3 feet North of the 'North Property Line of the
alley South`of llth Street, known and designated as New Subdivision Unit
Number 1257,
.AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with city specifications and in accordance with
the provisions of City Ordinance 133le
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the cityts portion of the cost and to
release escrow money.
Iie
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 23RDt Y OF MAY, 1963.
r
Jack Strong, Mayor
ATTLST
ll�
iavehla Lowe, City Secretary
APPROVED: .
J T. Rickerson, City Engineer
APPROVED:
Fred oe Senter, Jr , ty Attorney
City of Lubbock
POrter 3-3491
' 916 Texas Avenue
Lubbock, Texas
May 23, 1963
Honorable Mayor and City Cmnission
Lubbock, Texas
Gentlemen:
I"have examined the paving improvements constructed by Hodges
and Tierney, paving contractor, under their contract with the subdividers
of hest Gate-Drive Addition Inst. #8 and find the improvements on: llth
street, Raleigh Avenue and the East l/2 of Quaker Avenue as listed on the
final estimate sheet to have been completed in accordance with the plans
and specifications and recommend that you accept the improvements on
a said streets and/or venues, authorizing payment to the contractor the
amount shown on 'the attached consolidated final- estimate sheet as due
them by the City of Lubbock.
ours very truly,
7
(�"Jtbn T. Hickerson
City Engineer
CONSOLID&TED FINAL ESTIMATE
WEST GkTE DRUE ADDS INSTg #8
Accepted May 23, 1963
IIANTITIES
S.Yo&lley S.Y. Drainagq
S.Y. L.F. Ret valley Channel
Unit Location Paving C.& G Drainage Gutter Blocks(e+
Channel
NS 1255 llth Street from the WPL of 4767.40 2610.73 57.50 52.54
Lot 11, Blk. 17, west Gate' -Drive
Addition. Inst. #8 to the cul-de-
sac East of Raleigh Ave.
NS 1256 Raleigh Ave. from 31 N. of the` 433.78 244,00
NPL of the alley S. of llth St.
to_151 Be of the SPL of llth St.
NS 1257 Wk of Quaker Ave. from 3 r N, of 377.00 31.94 3
the NPL'of the alley North of '
llth St. to.31 N. of the NPL of
the alley S. of llth St.
(conc. only)
^ TOTAL 5201,18 3231.73 89.44 52.54 3
COST ESTMATE
5201018 S.Y. Paving @ $1.40 $ 7;281.65
3231.73 L.F. Curb & Gutter @ $1,40 4,524.42
89.44 S.Y. Ailey Return @ $5000 447.20
52.54 S.Y. valley Gutter @ $5.00 262.70
3 Ea. Drainage Channel Blocks @ $20.00 60.00
CCNTR&Cr COST $ 12,575.97
COST DISTRIBUTION
Contract Property
Unit Cost Owner Cost
NS 1255 $ 100879.58 $ 100879056
NS 1256 948.89 948.89
NS 1257 747.50 747.50
TOTAL $ 12,575.97 $ 120575.97