Loading...
HomeMy WebLinkAboutResolution - 050963B - Alley Improvements - Frank B. Hodges Contractors Inc - GWO 2775 - 05_09_1963 RESOLUTION 0"433 RESOLUTION ACCEPTING IMPROVEMENTS ON PCRTIONS OF ALIEYS AS LISTED BELOW AND OBDERING.THE ISSUANCE CF CERTIFICATES IN EVIDENCE a?? ASSESSMENTS \ IEVIED* WHEREAS, the City of Lubbock heretofore passed various alley JJ improvement ordinances and resolutions and entered into contract with Frank B. Hodges Contractors, Inc., G.W.O. 2775 for the making and construction of alley improvements on portions of numerous alleys in said city including among f_ others the following: �) The north-south alley between Avenue Q and Avenue R from 14 feet south of the north property line of loth Street to 55 feet south of the south property line of 9th Street, known and designated as tub-Unit Number 13 of Unit Number Af350. The north-south alley between Avenue F and Avenue G from the south property line of Broadway to 12 feet south of the north property line of 13th Street, known and designated as Sub-Unit Number 24 of Unit Number A-350. The east-west alley between Broadway and 13th Street from 12 feet east of the west property line of Avenue F to the east property line of Avenue G, known and designated as Sub�Unit Number 25 of Unit Number A-350. The north-south alley between Avenue H and Texas Avenue from 12 feet north of the south property line of 16th Street to 15 feet south of the north property line of 19th Street, known and designated as Sub-�Unit Number 36 of unit Number Ap350. The east&west alley between 33rd Street and 34th Street from 12 feet east of the west property line of Avenue V to 300 feet west of the west property line of Avenue V, known and designated as Sub-Unit Number 45 of Unit Number A-3506 AND WMEREAS, the improvements upon the said portions of the above- mentioned alleys, have been inspected and found to have been constructed in accordance with terms of said contract G.W*O. 2775. THEREFCRE, BE IT RESOLVED BY THE CITY CF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys, be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the cityIa portion of the cost. II. That the Mayor and City Secretary be, and they are hereby instructed to execute and deliver certificates in evidence of the assessments levied again t the .parcels of property abutting upon the said portions of the alleys listed above and against the owners of such property in accordance with law and in the manner provided in said contract, and the proceedings with reference to said improvements and assessments where such assessments were levied. III This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9TH DAY CF MAY, 1963. J ck F. Strong, Mayor ATTEST: lav nia ?,owe, City Secretary APPROVED: �J hn T. Hickerson, City Engineer APPROVED: Fred 0. Seater, Jr., CTy Attorney 1 City of Lubbock �3 ! , POrfer 33491 916 Texas Avenue Lubbock, Texas May 9, 1963 Honorable Mayor and City Commission Lubbock, Tezas Gentlemen: 1 have examined the paving improvements constructed by Frank Be Hodges Contractors; MMC'G, 'paving contractor, under their contract.dated, $eptember W 1963, designated as 6.V,G. 2775 and find the improvements on dub units 13, 24, 25, '36 and 45 of-Unit 1,-i350 as listed on'ihe final estimate and assessment sheet to bave been completed in accordance with the plans and specifications and recommend that you-accept the improvements on said alleys, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet its due them by the City of Lubbock and issue assignable certificates against property owners for the respective amannts shown on the attached final assessment sheets as being due against them and their respective properties. Yours very truly, �'7 John T. Hickerson City gugineer CONSOLIDATED FINAL ESTIMIMTE GWO 2775 Accepted May 9, 1963 QUANTITIES Unit & S.Y. L.F. Sub-Unit Location Paving C G A-350-13 The N-S alley between Ave. Q and Ave. R 250.54 from 141 S. of the NPL of loth St. to 550 S. of the SPL of 9th St. A-350-24 H-S alley_ between Ave. F and Ave. G 288.56 35.2 from the SPL of Broadway to 121 go of the NPL of 13th St. A-350-25 The E-W alley between Broadway and 13th 336.60 32.2 St. from 12"E. of the.WPL of Ave. F to the EPL of Ave. G A-350►36 The H-S alley between Ave. H & Texas Ave. 379,61 48.6 from 121 N. of'the SPL of 18th St. to 152 S. of the NPL of 19th.St. A-350-45 The E-W alley between 33rd St. and 34th 349.44 36.0 St. from 12' E. of the WPL of Ave• v to 3601 W. -of the WFL of Ave. V TOTAIS 1604.75 152.0 COST ESTIMPrTE 1604075 S.Y. -Paving @ $4e85 7,783.04 152.00 L.F. Curb & Gutter @ $1.50 228.00 CONTRACT COST $ 8,011.04 COST DISTRIBUTION unit &, Contract Property City to Sub-Unit Cost Owner Cost Contractor A-350-13 $ 1,215.12 $ 1,037.93 $ 177.19 A-350-24 1,452.32 10387,05 65.27 A-350-25 1,6800'81 1,415.38 265e43 A-350-36 1-914,01 1,746.22 167.79 A-350-45 1 748.78 1 132.26 616.52 TMAIS $ 8,011.04 $ 6,718.84 $ 1,292.20 •' Acceptance Date Hay 9 1963 FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVE. Q &AVE. H G.W.O. 2775 . CITY.OF LUBBOCK Sheet No. 1 of 1 Width 10 Foot From 14' S. of the NFL of loth St. to 55' S. of the SPL of 9th St. Sub-Unit No. 13 of Unit No. A-350 - Paving owner Lots Blk. Total No. Addition No. Ft. Different Bate Cost Cost EAST SIDE Imperial 400 Motels, Inc. 2 & 3 117 Overton 110.00 2.83071708 311.38 311.38 J. E. Griffis 4 & 5 117 Overton 110.00 2.83071708 311.38 311.38 WEST SIDE J. H. Ing 9 117 Overton 55.00 2.83071708 155.69 155.69 A. B. Greer 8 117 Overton 55.00 1.57262060 86.49 86.49 Tom J. Foster 7 & 6 117 Overton 110.00 1.57262060 172.99 172.99 TOTAL P80PSM OWNER. COST $ 1037.93 CTTYt3 Sam 237.95 TOTAL FINAL SUB UNIT COST $ 1275.88 AccoPtanca Date May 9. 1963 o.W.O. 2775 FINA7. PAVING ASSESS&NT N-S AIM BETWEEN ME. F & AVEp. G Sheet No. l of 1 CITY-OF LUBBOCK _.. _. _. Sub-unit No. 24 of Width 10,Feat From 16' N. of the SPL of Broadway to 12' S. of the NPL of 13th St. unit No. A«350 Paving Owner Lots Blk. $2.83071708 Bate/L.F. Total No. Addition No. Ft. Coat Cost EAST S= J. A. Hodges 11 thru 15 136 Original Town 130 367.99 367.99 Wm. Fritz 20 136 Original Town 115 325.53 325.53 WEST SIDE Hiram Parks 5 136 Original Town 115 325.53 325.53 Moses Sadallah 6 & 7 136 Original Town 52 147.20 147.20 Mrs. 0. A. McCaskill 8 136 Original Town 26 73.60 73.60 J. A. Hodges 9 & 10 136 Original Town 52 147.20 147.20 TO'PAL PROPERTY OWNER COST $ 1387.05 CTPY'S SHAKE 135.59 TOTAL FINAL SUB UNIT COST $ 1522.64 Acceptance Date May 9, 1963 G.W.O. 2775 FINAL PAVING ASSESSMENT E-W &MY BETWEEN BaW=AY & 13TH STREET Sheet No. 1 of 1 CITY.OF LUBBOCK Sub-Unit No. 25 of Width 10 Feet From 12' S. of the W.P.L. of Ave. F to 161 W. of the EPL of Ave. G Unit No. A-350 Paving Owner Lots Blk. $2.83071708 Rate/L.F. Total No. Addition No. Ft. Coat Cost NORTH SIDE 0. V. Bagwell 1 136 Original Town 25 70.77 70.77 Mrs. Katie Reed 2 136 Original Tam 25 70.77 70.77 R. Z. Hogan 3 136 Original Town 25 70.77 70.77 Hiram Parks 4 & 5 136 Original Tam 50 141.54 141.54 Wm. Fritz 20 136 Original Town 25 70.77 70.77 C. N. Hodges 18 & 19 136 Original Town 5R 141.54 141.54 Joe Stewart 16 & 17 136 Original Town 50 141.54 141,54 SOUTH SIDE Moses Sadallah 6 136 Original Town 125 353.84 353.84 J. A. Hodges 15 136 Original Town 125 353.84 353.84 TOTAL PROPERTY OWMR COST $ 1415.38 CITY'S SHARE 349,47 TOTAL FINAL SUB UNIT COST $ 1764.85 Acceptance Date May :_9, 1963 G.W.O. 2775, FINAL PAVING ASSESSMUr N-S ALLEY BETWEEN AVE, H & TEXAS AVENUE Sheet No. 1 of 1 CITY.CF LUBBOCK Sub-Unit No. 36 of Width 10-Foot From 121 N. of the S.P.4L. of 18th Street to 15 S. of the NPL of 19th Street Unit No. A-350 Paving Owner Lots Blk. $2.83071708 Rate/L.F. Total No. Addition No. Ft. Cost Cost EAST SIDE John L. Merrell 24, 23 230 Original Town 52,00 147.20 147.20 A. M. Leftwich, Jr. 22, 21, 20, 19, 18, 17 230 Original Town 156.00 441.59 441.59 Alfred B. Greer 16, 15, 14, 13 230 Original Town 100,44 284,32 284,32 WEST SIDE D. D. Lacy & L. W. Lsach 1, 2, 3, 4 230 Original Town 104,00 294.39 294.39 B. g. Berry 5, 6 230 Original Town 52,00 147.20 147.20 J. L. Peters Estate 7, 8 230 Original Town 52.00 147.20 147,20 Alton Sedbarry Exec. Chas. C. Burns 9, 10, 11, 12 230 Original Town 100,44 284.32 284.32 TOTAL PROPERTY OWNER COST $ 1746.22 CTrY'S SHARE 263.49 TOTAL FINAL SUB UNIT COST $ 2009,71 Acceptance Date May 9, 1963 G.W.O. 2775 . FINAL PAVING ASSESSMENT ErW AL78Y BETWEEN 33RD ST & 34TH STRUT Sheet No. 1 of 1 CTPY.OF LUBBOCK sub-Unit No. 45 of Width 10 Foet From 129 E. of the WPL of Ave. V to 300' W. of WPL of Ave. V Unit No. A-350 Paving Owuar Lots Blk. Total No. Addition No. Ft. Different Rate Cost Cost NORTH SIDE Bob Huff 1, 2 12 Highland Park 120.00 NO ASSESSMENP Horace Garrett 3, 4, 5 12 Highland Park 180.00 1.57262060 283.07 283,07 SOUTH SIDE Bob Huff 20 12 Highland Park 60.00 2.83071708 169.84 169.84 M & M Development, Inc. 19, 18 12 Highland Park 120.00 2.83071708 339.69 339.69 Be L. Jeter E. 21' 4" of 17 12 Highland Park 21' 4" 2.83071708 60.38 60.38 Frank mcGlaun W. 38' 8" of 17 & all of 16 12 Highland Park 98' 8" 2.83071708 279.28 279.28 TOTAL PROPERTY OWNER COST $ 1132.26 CITY'S SHA88 703,96 TOTAL FINAL SUB UNIT COST $ 1836,22