HomeMy WebLinkAboutResolution - 022863H - Water_Sewer Improvements - Panhandle Construction Co - Beverly Heights Addition - 02_28_1963 RESOLUTION 0702$(93 f 4
Resolution accepting water and sewer system improvements for'Lots
297 thru 373, Beverly Heights Addition,
WHEREAS, the developers of Lots 297 thru 373', Beverly Heights
Addition have complied with the provisions of the City of Lubbock Code,
Chapter 34, Article 2, by providing the water and sewer improvements for said
f,.. addition in accordance with paragraph 61 of said Chapter 34, and,
\41 WHEREAS, the total utility cost to the developer is $25,146.67
� . with the improvements constructed by Panhandle Construction Company having a
° value of $23,960.56 as determined by the unit prices established by said
Chapter 34, and $1186.11 cash (engineering, wet tie-ins, paving repair,
6 difference in Pro Rata and actual cost) paid to the City with the developer to
receive a refund of $6771.67 in accordance with Chapter 34 of the Code of the
City of Lubbock
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF
LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $677t,67
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 28TH DAY OF FEBRUARY, 1963.
Jack F. Strong, ayor
Attes e .
La enia howe, C' y Secretary
Approved:
1001
/Ti,hn T. -Hick.erson, City Engineer
Approved:
Fred 0. Senter, Jr., Cit torney
USOLtiITON
Resolution accepting water and sewer system Improvements for Lots
19 thru 33, Southgate Addition
WMMEA.S, the developers of Lots 19 thru 33, Southgate Addition have
complied with the provisions of the City of Lubbock Code, Chapter 34, Article
2. by providing the water and sewer improvements for said addition in
accordance with paragraph b1 of said Chapter 34. and,
WHEREAS, the total utility cost to the developer is $6,027." with
the improvements constructed by Hemphill Contracting Company having a value of
$5493.67 as determined by the unit prices established by said Chapter 34,, and
0536.77 cash (engineering, wet tie-ins, paving repair, difference in Pro Rats
and actual cost) paid to the City with the developer to receive a refund of
$1595.69 in accordance with Chapter 34 of .the Code of the City of Lubbock,
WHEREAS, the construction of the ;said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's Mane and
specifications,
MW TFIEtEFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF
LUBBOCK:
1. That the improvements be and the same are hereby accepted
as an integral part of the water and sewage system of the
City of Lubbock.
2. That 'refund of the refundable cost in the amount of $1595,69
be vale in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 2M DAY OF BRUARY, 1963.
Attested:
Lavenia Lowe, City Secretary
Approved:
John T. Hickerson, City Engineer
Approved:
Fred O. Senter, Jr., City Attorney*