HomeMy WebLinkAboutResolution - 022863A - Paving Improvements - Frank B. Hodges Contractors, Inc. - GWO 2775 - 02_28_1963 M
RESOLUTION 04�4 A
RESOLUTION ACCEPTING IMPROVEMENTS ON P#"ITIONS OF ALLEYS AS LISTED
BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE 62 ASSESSMENTS
LEVIED.
WHEREAS, the City of Lubbock heretofore passed various alley
improvement ordinances and resolutions and entered into contract with Frank B.
Hodges Contractors, Inc. (G.W.O. 2775) for the making and construction of
alley improvements on portions of numerous alleys in said City including
among others the following:
The North-South alley between Avenue L and Avenue M from 17.6 feet North of t]t
South Property Line of 4th Street to 12 feet South of the North Property Lin+ ,
of 5th Street, known and designated as Sub-Unit Number 8 of Unit Number A-35"110
The North-South alley between Avenue M and Avenue L from 12 feet North of the
South Property Line of loth Street to the North Property Line of the alley
South of loth Street, known and designated as Sub-mUnit Number 16 of Unit
Number A»350.
The East»West alley between 16th Street and 17th Street from 22 feet West of
the East Property Line of Avenue Q to 355.5 feet East of the East Property
Line of Avenue Q, known and designated as Sub«Unit Number 30 of Unit
Number A»350.
The East-West alley between 24th Street and 25th Street from 22 feet East of,
the West Property Line of Avenue Q to 180 feet West of the West Property Lin'.
of Avenue Q, known and designated as SuboUnit Number 40 of Unit Number A«3500
AND WHEREAS, the improvements upon the said portions of the above#
mentioned alleys have been inspected and found to have been constructed in
accordance with terms of said contract G.W.O. 2775.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
z.
That the improvements on said portions of the abovementioned
alleys be and the same are hereby accepted, and the City Engineer be and he is
hereby authorized to direct payment of the City`s portion of the cost.
zI.
That the Mayor and City Secretary be* and they are hereby
instructed to execute and deliver certificates in evidence of the assessmentit
levied against the parcels of property abutting upon the said portions of 06
alleys listed above and against the owners of such property in accordance with
law and in the manner provided in said contract, and the proceedings with
reference to said improvements and assessments where such assessments were
levied.
III.
This resolution shall take effect and be in force from and aftet
its passage.
0220643A
PASSED AMID APPROVED THIS 28TH DAY OF FEBRUARY, 1963.
�a 'h + . :1�--z�
77 Jack F. Strong, Mayor
ATTEST:
t
La enia Lowe, Cdty Secretary
APPROVED:
JO n T. Aickeerson, City Engineer
�D.:Z
Fred 0. Senter, Jr., City At r y
City of Lubbock
POrter 3-3491
916 Texas Avenue
Lubbock, Texas
February 28, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Frank
B. Hodges, Contractors, Inc., paving contractor, under their contract
dated September 18, 1962, designated as G.W.O. 2775 and find the improve-
ments on Sub-Units A-350 » 81 16, 30 and 40 as listed on the final
estimate and assessment sheets to have been completed in accordance with
the plans and specifications and recommend that you accept the improvements
on said alleys, authorizing payment to the contractor the amount shown
on the attached consolidated final estimate sheet as due them by the
City of Lubbock and issue assignable certificates against property owners
for the respective amounts shown on the attached final assessment sheets
as being due against them and their respective properties.
Y,9 rs ver/y rul ,
ohn T. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMATE
GWO 2775
Accepted February 28, 1963
QUANTITIES
Unit & S.Y. L.F.
Sub-Unit Location Paving C & G
A-350-8 The N-S Alley between Ave. L and Ave. M
17.6' N.of the SPL of 4th St. to 12' S.
of the NPL of 5th St. 378.86 84.50
A-350-16 The N-S alley between Ave. M & Ave. L
from 12t N. of the SPL of loth St, to the
NPL of the alley south of loth St. 152.50
A-350-30 The E-W alley between 16th St. & 17th St.
from 22' W. of the EPL of Ave. Q to
355.5' E. of the EPL of Ave. Q 376.58
A-350-40 The E-W alley between 24th St. & 25th St.
from 22' E. of the WPL of Ave. Q to
180' W. of the WPL of Ave. Q 240.95 73.80
TOTALS 1148.89 158.30
COST ESTIMATE
1148.89 S.Y. Paving @ $4.85 $ 5572.12
158.30 L.F. Curb & Gutter @ 1.50 237.45
CONTRACT COST $ 5809.57
COST DISTRIBUTION
Property City
Unit & Contract Owner to
Sub»Unit Cost Cost Contractor
A-350-8 1964.22 1722.79 241.43
A-350-16 739.63 735.98 3.65
A-350-30 1826.41 1729.57 96.84
A-350-40 1279.31 921.97 357.34
TOTALS $ 5809.57 5110.31 699.26
r Acceptance Date Feb. 28, 1963
G.W.O. 2775
FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVE. M & AVE. L Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 8 of
Width 10 Feet From 17.6' N. of SPL of 4th St. to 121 S. of the NPL of 5th St . Unit No. A-350
Paving
Owner Lots Blk. $2.83071708 Rate/L.F. Total
No. Addition No.Ft. Cost Cost
EAST SIDE
General Telephone Co. 22, 23 & 24 Less Street Dedication 4 Original Town 68.80 194.75 194.75
Forrest Lumber Co. 211% 20 4 Original Town 52.00 147.20 147.20
Bigham Investment Co. 19, 18 4 Original Town 52.00 147.20 147.20
Ambico, Inc. 17, 16, 15, 14, 13 4 Original Town 130.00 367.99 367.99
WEST SIDE
Porter Oil Co. Lot 1 less Street Dedication, Lot 2 &
N. 11' of 3 4 Original Town 56.81 160.81 160.81
Pioneer Nat. Gas Co. 15'xl5' in S.E. Cor. of Lot 3 4 Original Town 15.00 42.46 42.46
General Telephone Co. 4, 5, 6, 7 4 Original Town 104.00 294.39 294.39
Ricketts Butcher Supply 8, 9, 10, 11, 12 4 Original Town 130.00 367.99 367.99
TOTAL PROPERTY OWNER COST $ 1722.79
CITY'S SHARE 339.64
TOTAL FINAL SUB UNIT COST $ 2062.43
Acceptance Date Feb. 28, 1963
G.W.O. 2775
FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVE. M & AVE. L Sheet No. 1 of 1
CITY CF LUBBOCK Sub-Unit No. 16 of
Width 10 Feet From 12' N. of the SPL of loth Ste to the NPL of the E-W Alley S. of loth St. Unit No. A-350
Paving
Owner Lots Blk. Addition $2.83071708 Rate/L.F. Total
No. No. Ft. Cost Cost
FAST SIDE
Thomas Rutledge Estate 16 thru 20 100 Original Town 130.00 367.99 367.99
WEST SIDE
Dr. Sam Dunn 1 thru 5 100 Original Town 130.00 367.99 367.99
TOTAL PROPERTY OWNER COST $ 735.98
CITY 9S SHARE 40.63
TOTAL, FINAL SUB UNIT COST $ 776.61
Acceptance Date Feb. 28, 1963
• G.W.Q. 2775
FINAL PAVING ASSESSMENT E-W ALLEY ,BETWEEN 16TH ST. & 17TH ST, Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 30 of
Width 10 Feet From 221 W. of the EPL of Ave. Q to 355.5' E. of the EPL of Ave, Q Unit No. A-350
Paving
Owner Lots $2.83071708 Rate/L.F. Total
Addition No.Ft. Cost Cost
NORTH SIDE
A. M. Leftwich, Kenneth D. 15, 14 Robinson Subd. of Blk. 2, 80 226.46 226.46
& Julian R. Leftwich Overton Add.
Century Apartments 13 & W. 201 of 12 Robinson Subd. of Blk. 20 60 169.84 169.84
Overton Add.
SOUTH SIDE
Guy L. McAfee 16 Robinson Subd. of Blk. 2, 40 113.23 113.23
Overton Add.
Columbia Waldrop 17 Robinson Subd. of Blk. 2 40 113.23 113.23
Overton Add.
A. M. Leftwich, Jr. 18 & W. 201 of 19 Robinson Subd. of Blk. 23 60 NO ASSESSMENT
Overton Add,
Century Apts. Special Agreement with F. B. Hodges 391 1106.81 1106.81
TOTAL PROPERTY OWNER COST $ 1729.57
CITY'S SHARE 188.16
TOTAL FINAL SUB UNIT COST $ 1917.73
Acceptance Date Feb. 28, 1963
G.W.O. 2775
FINAL PAVING ASSESSMENT E-W ALLEY BETWEEN 24TH ST. & 25TH STREET Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 40 of
Width 10 Feet From 22' E. of the WPL of Ave. Q to 180,0' W. of the WPL of Ave. Q Unit No. A-350
Paving
Owner Lots Blk. $2.83071708 Rate/L.F. Total
No. Addition No.Ft. Cost Cost
NORTH SIDE
Howard & Hudgins W. 21,92' of 1, & all of 2 & 3 & 22 McCrummens 2nd 145.70 412.44 412.44
E. 29.94' of 4
Tom Main W. 16,98' of 4 & E. 17.32' of 5 22 McCrummens 2nd 34.3 NO ASSESSMENT
SOUTH SIDE
American Legion Allen Beginning at a point 20 feet south and 22 McCrummens 2nd 180.00 509.53 509.53
Bros. Post #148 21.92 feet east of the southwest corner
of Lot 1, Block 22, McCrummens 2nd
Addition to the City of Lubbock, Lubbock
County, Texas; Thence south 100 feet;
Thence west 180.00 feet; Thence north
100 feet; Thence east 180,00 feet to the
place of beginning
TOTAL PROPERTY GIVER COST $ 921.97
CITY'S SHARE 421,31