HomeMy WebLinkAboutResolution - 021463D - Paving Improvements - Frank B. Hodges Contractors, Inc. - GWO 2775 - 02_14_1963 RESOLUTION /irk Z lq 6 31>
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF ALIEYS AS LISTED
BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS
-� TENTED.
WHEREAS, the City of Lubbock heretofore passed various alley
N improvement ordinances and resolutions and entered into contract with Frank Be
Hodges Contractors, Inc. (G.W.O. 2775) for the making and construction of
alley improvements on portions of numerous alleys in said city including among
others the following:
The North-South alley between Avenue X and Waco Avenue from 20.5 feet South of
the North Property Line of 4th Street to the North Property Line of the alley
North of 4th Street (East Leg), kn*on and designated as Sub-Unit Number 1 of
Unit Number A-350.
The North-South alley between Avenue V and Vernon Avenue from 20.5 feet South
of the North Property Line of 4th Street to the North Line of Lot 2, Block 11,
Green Subdivision, known and designated as Sub-Unit Number 3 of Unit Number
A-350.
The North-South alley between Avenue U and Temple Avenue from 20.5 feet South
of the North Property Line of 4th Street to the North Line of Lot 14, Block 8,
Caver Subdivision, known and designated as Sub-Unit Number 5 of Unit Number
A-350.
The East-West alley between 34th Street and 35th Street from 12 feet East of
the West Property Line of Boston ,Avenue to 12 feet West of the East Property
Line of Canton Avenue, known and designated as Sub-Unit Number 50 of Unit
Number A-350,
The East- Test alley between 34th Street and 35th Street from 9 feet East of
the West Property Line of Vicksburg Avenue to 100 feet west of the West
Property Line of Vicksburg Avenue, known and designated as Sub-Unit Number 60
of Unit Number A-350.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned alleys have been inspected and found to have been constructed in
accordance with terms of said contract (G.W.O. 2775).
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys
be and the same are hereby accepted, and the City Engineer be and he is
hereby authorized to direct payment of the City's portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed o
execute and deliver certificates in evidence of the assessments levied against
the parcels of property abutting upon the said portions of the alleys listed
above and against the owners of such property in accordance with law and in
the manner provided in said contract, and the proceedings with reference to
said improvements and assessments where such assessments were levied.
I
III.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 14TH DAY OF FEBRUARY, 1963.
ck F. Strong, Mayor
ATTEST
c
Lav is Lowe, City 5ecretaiy
AP W.nTHickerson,
D:
� L
City Engineer
APPROVED:
red 0. Senter, Jr,01fty Attorney
CITY OF LUBBOCK
0� LtI,B
CK.
TEXAS
February 14, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed oy
Frank B. Hodges Contractors, Inc., paving contractor, under their
contract dated September 18, 1962, designated as G.W.O. 2775 and
find the improvements on Sub-Units A-350-1, 3, 5, 50 and 60 as
listed on the final estimate and assessment sheet to have been
completed in accordance with the plans and specifications and
recommend that you accept the improvements on said alleys, authorizing
payment to the contractor the amount shown on the attached consolidated
final estimate sheet as due them by the City of Lubbock and issue
assignable certificates against property owners for the respective
amounts shown on the attached final assessment sheets as being due
against them and their respective properties.
Yours very /truly.,
John T. Hickerson
City Engineer
CONSOLIDATED FINAL ESTIMATE
GWO 2775
Accepted February 14, 1963
2UANrT IT IES
Unit & S.Y. L.F.
Sub-Unit Location Paving C & G
A-350-1 The N-S alley between Ave. X and Waco Ave. from 135.67 40.80
20.5' S. of the NPL of 4th St. to the NPL of
the alley N. of 4th St. (E. Leg)
A-350-3 The N-S alley between Ave. V and Vernon Ave. from 134.78
20.5' S. of the NPL of 4th St. to the N. Line of
Lot 2 Green Sub.
A-350-5 The N-S alley between Ave. U and Temple Ave. from 136.89 40.70
20.5' S. of the NPL of 4th St. to the N. Line of
Lot 14 Caver Sub.
A-350-50 The E-W alley between 34th & 35th St. from 12' 711.08 50.60
E. of the WPL of Boston Ave. to 12' W. of the
E PL of Canton Ave.
A-350-60 The E-W alley between 34th St. & 35th St. from 120.69 15.20
9 ' E. of the WPL of Vicksburg Ave. to 100' W.
of the WPL of Vicksburg Ave.
TOTALS 1,239.11 147.30
COST ESTIMATE
1239.11 S.Y. Paving @ $4.65 $ 6,009.69
147.30 L.F. Curb & Gutter @ $1.50 220.95
CONTRACT COST $ 6,230.64
COST DISTRIBUTION
Property
Unit & Contract Owner City to
Sub-Unit Cost Cost Contractor
A-350-1 719.20 509.52 209.68
A-350-3 653.68 551.98 101.70
A-350-5 724.97 559.34 165.63
A-350-50 3,524.64 2,478.45 1,046.19
A-350-60 608.15 283.07 325.08
TOTALS $ 6,230.64 4,382.36 1,846.28
Acceptance Date 2-14-63
G.W.0. 2775
FINAL PAVING ASSESSHENT N-S ALLEY BETWEEN AVE. % & WACO Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 1 of
Width 10 Feet From 20.5' S, of the NPL of 4th St. to the NPL of the alley N. of 4th St. (E.Leg) Unit No, A-350
Paving
Owyter Lots B1k. $2.83071708 Rate/L.F. Total
Ne._ Addition No.Ft. Coat Coat
BAST BILE -
Brandon & Clark Electric North 47.51 of 1 & South 35' of 2 14 Merritt & Wild 82.5 233.53 233.53
WEST SIDE
American Petrofina Co. 23 & North 47.5' of 24 14 Merritt & Wild 97.5 275.99 275.99
of Texas
TOTAL PROPERTY OWNER COST $ 509.52
CITY'S SHARE 245.64
TOTAL FINAL SUB UNIT COST $ 755.16
■
Acceptance Date 2-14-63
G.W.O. 2775
FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVE. "V" & VERNON AVE. Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 3 of
Width 10 Feet From 20.5t S. of the NPL of 4th Ste to the N. Line of Lot 2 Green Sub. Unit No. A-350
Paving
Owner Lots B1k. $2,83071708 Rate/L.F. Total
No. Addition No.Ft. Cost Cost
EAST SIDE
Claude E. Phipps North 47.51 of 1 & all of 2 11 Green Sub. 97.5 275.99 275.99
WEST SIDE
Hutchison & Howard 23 & North 47.5' of 24 11 Green Sub. 97.5 275.99 275.99
TOTAL PROPERTY OWNER COST $ 551.98
CITY'S SHARE 134.38
TOTAL FINAL SUB UNIT COST $ 686.36
Acceptance Date 2-14-63
G.W.O. 2775
FINAL PAVING ASSESSMENT N-S ALLEY BETWEEN AVE. U & TEMPLE AVENUE Sheet No. 1 of 1
MY OF LUBBOCK Sub-Unit No. 5 of
Width 10 Feet From 20.5' S. of the NPL of 4th St. to the N. Line of Lot 14, Caver Sub. Unit No. A-350
Paving
Owner Lots Blk. $2.83071708 Rate/L.F. Total
No. Addition No.Ft. Cost Cost
EAST SIDE
A. J. Malouf 13 & 14 8 Caver Sub. 98.8 279.67 279 .67
WEST S IDE
F. L. Walker 11 & 12 8 Caver Sub. 98.8 279 .67 279 .67
TOTAL PROPERTY OWNER COST $ 559.34
CITY'S SHARE 201.88
TOTAL FINAL SUB UNIT COST $ 761.22
Acceptance Date 2-14-63
G.W.O. 2775
FINAL PAVING ASSESSMENT E-W ALIEY BETWEEN 34TH & 35TH STREET Sheet No. I of 1
CITY OF LUBBOCK Sub-Unit No. 50 of
Width 10 Feet From 12 ' E. of the WPL of Boston Ave. to 12' W. of the EPL of Canton Ave. Unit No, A-350
Paving
Owner Lots Blk. Total
No. Addition No.Ft. Different Rate Cost Cost
NORTH SIDE
C. A. Rodgers 10 1 Jefferson Ave. 65.00 2.83071708 184.00 184.00
Gerald Lokey 9, 8 1 Jefferson Ave. 120.00 2.83071708 339.69 339.69
James H. Robnett &
Dennis K. Kennedy 7 1 Jefferson Ave. 60.00 2.83071708 169.84 169.84
Trinity Baptist Church 1 thru 6 1 Jefferson Ave. 365.00 2,83071708 1033.21 1033.21
SOUTH SIDE
Trinity Baptist Church 11, 12, 17, 18, 19 & 20 1 Jefferson Ave. 370.00 1.57262060 581.87 581.87
R. M. Bourland 13, 14 1 Jefferson Ave. 120.00 NO ASSESSMENT
Trinity Baptist Church 15 1 Jefferson Ave. 60.00 NO ASSESSMENT
I Trinity Baptist Church 16 1 Jefferson Ave. 60.00 2.83071708 169.84 169.84
TOTAL PROPERTY OWNER COST $ 2478.45
CITY'S SHARE 1222.42
TOTAL FINAL SUB UNTT COST $ 3700.87
Acceptance Date 2-14-63
G.W.O. 2775
FINAL PAVING ASSESSMENT E W ALLEY BETWEEN 34TH & 35TH STREET Sheet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 60 of
Width 10 Feet From 9' E. of the WPL of Vicksburg Ave. to 1001 W. of the WPL of Vicksburg Ave. Unit No. A-350
Paving
Owner Lots Blk. $2.83071708 Rate/L.F. Total
No. Addition No.Ft. Cost Cost
NORTH SIDE
First National Bank of Boston 1 2 Hillcrest Resub. 100.00 283.07 283.07
Trustee for the General Motors
Salaried Employees Pension Trust
SOUTH SIDE NO ASSESSMENT
TOTAL PROPERTY OWNER COST $ 283.07
CITY'S SHARE 355.49
TOTAL FINAL SUB UNIT COST $ 638.56
9