HomeMy WebLinkAboutResolution - 080962C - Water_Sewer Improvements - Panhandle Construction Co - Crestwood Addition - 08_09_1962 C),&09 41
RESOLUTION
Resolution accepting water and sewer system improvements for Lots 1
thru 7, Crestwood Addition.
WHERFkS, the developers of Lots 1 thru 7, Crestwood Addition have
complied with the provisions of the City of Lubbock Code, Chapter 34, Article 2
by providing the water and sewer improvements for said addition in accordance
with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $933.29 with the
improvements constructed by Panhandle Construction Company having a value of
$2,779.87 as determined by the unit prices established by said Chapter 34, and
$135.42 cash (engineering, wet tie-ins, paving repair, difference in Pro Rata
and actual cost) paid to the City with the developer to receive a refund of
$798.79 in accordance with Chapter 34 of the Code of the City of Lubbock, And,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and specifi-
cations,
NOW THEREFORE BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City of
Lubbock.
2. That refund of the refundable cost in the amount of $798.79 be
made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 9THE DAY OF AUGUST, 1962.
Ja k F. Stfong, ayor
Atteste z
Lavenii Lowe, Cit'y Secretary
Approved:
ohn T. Hickerson, City Engineer
Ap roved:
Fred 0. Senter, City Atto y,_.