RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Southgate Addition, made arrangements
with Pioneer Pavers, Inc. for the construction of paving improvements on
certain-streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Southgate Addition
including the following streets:
52nd Street from its intersection with a line 16.00 feet east of the east
property line of Orlando Avenue to its intersection with-.a line 16.00 feet West
of the west property line of Memphis Avenue, known and designated as New
Subdivision Unit Number 1116.
53rd Street from its intersection with a line 16.00 feet east of the east
property line of Orlando Avenue to its intersection with a line 16.00 feet west
of the west property line of Memphis Avenue, known and designated as New
Subdivision Unit Number 1117.
W 1/2 Memphis Avenue (concrete only) from its intersection with a line 15.00
feet north of the north property lime of 52nd Street to its intersection with
a line 3.00 feet south of the alley south of 53rd Street, known and designated
as New Subdivision Unit Number 1118.
*^ AND WHEREAS, the construction of the above improvements on the
abovementioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.,
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the Cityts portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 12TH DAY OF JULY, 1962.
Jack F. Strong, Mayor
ATTES
0
Lav nia Lowe, City Secretary
AP OVED:
J T. Hickerson, City Engineer
' AP O'VED
Fred O. Senter, Jr., C 'kttorney
i
CITY OF LUBBOCK
ocK.
TEXAS
July 12, 1962
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Pioneer Pavers, Inc., paving contractor, under their contract with
the subdividers of Southgate Addition and find the improvements on
52nd Street, 53rd Street and W 1/2 of Memphis Avenue as listed on
the final estimate sheet to have been completed in accordance with
the plans and specifications and recommend that you accept the
improvements on said streets and/or avenues, authorizing payment to
the contractor the amount shown on the attached consolidated final
estimate sheet as due them by the City of Lubbock.
ours very truly,
John T. Hickerson
City Engineer
r ,
E
CONSOLIDATED FINAL ESTIMATE
SOUIHGATB ADDITION
LOTS 36-63, 66-78
Accepted July 12, 1962
QUANTITIES
S.Y. S.Y.
Unit Location S.Y. L.F. Alley Valley
Paving C_& G Reta Gutter
N.S. 1116 52nd St. from 16' E. of the E.P.L. of 4368.82 2457.46
Orlando Ave. to 161 We of the W.P.L.
of Memphis Ave.
N.S. 1117 53rd St. from 16' E. of the E.P.L. of 4366.22 2456,00
Orlando Ave. to 161 W. of the W.P,.L.
of Memphis Ave.
N.S. 1118 Wj of Memphis Ave, from 15' N. of the 541.58 24.44 69.53
N.P.L. of 52nd St. to 31 S. of the
alley S. of 53rd St. (concrete only)
T TOTALS 8,735.04 5,455.04 24.44 69.53
COST ESTIMATE
8,135.04 S.Y. Paving @ $1.35 $ 11,792.30
5,455.04 L.F. Curb& Gutter @ $1.37 7,473041
24.44 S.Y. Alley Return C $4.50 109.98
69.53 S.Y. Valley Gutter @ $5.00 347.65
CONTRACT COST $ 19,723.34
,COST DISTRIBUTION
Contract Property
Unit Cost Owner
Cost
N.S. 1116 $ 99264.63 $ 9,264.63
N.S. 1117 9,259.12 9,259.12
N.S. 1118 1.199:59 1,199:59
TOTALS $ 19,723.34 $ 19,723.34