HomeMy WebLinkAboutResolution - 062862J - Water_Sewer Improvements - Panhandle Construction Co - Live Oak Addition - 06_28_1962 A NS
RESOLUTION
Resolution accepting water and sewer system improvements for Lots 1
thru 127, Live Oak Addition
WHEREAS, the developers of Lots 1 thru 127, Live Oak Addition have
complied with the provisions of the City of Lubbock Code, Chapter 34, Article 2
by providing the water and sewer improvements for said addition in accordance
with paragraph bl of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $53,468.73 with
the improvements constructed by Panhandle Construction Company having a value
of $39,432,69 as determined by the unit prices established by said Chapter 34,
and $14,036.04 cash (engineering, wet tie-ins, paving repair, difference in
Pro Rata and actual cost) paid to the City with .the developer to receive a
refund of $21,250.15 in accordance With Chapter 34 of the Code of the City of
Lubbock and a refund of deposit in the amount of $60.47 and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and
specifications,
NOW THEREFORE BE Ir RESOLVED BY THE CITY COMISSION OF THE CITY OF
LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $21,250,15
be made in accordance with said Chapter 34.
3. That a refund of deposit be made in the amount of $60.47.
4. This resolution shall take effe,et and be in force from and after
its passage.
PASSED AND APPROVED THIS 2 8 th " '3zme +.',. lg 62
ack btr6ing, Mayor
At ted:
r
venia Lowe, City S cretary
Approved:
hn T. Hickerson, City Engineer
APPROVED:
Fred 0. Senter, Jr., City Attorney