RESOLUTION ()L9 ;N (42
RESOLUTION ACCEPTING DMOVEMMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Mackenzie 'Terrace Addition, made arrangements
with Kerr Paving Company for the construction of paving improvements on certain
street dedicated in said subdivision under the provisions of said Ordinance
prior to the recording of the subdivision plat of- Mackenzie Terrace Addition
including the following street:
Redbud Avenue from its intersection with a line 74.00 feet North of the South
Property Line of East 4th Street to its intersection with a line 3.00 feet
South of the South Property Line of the alley South of East 4th Street, known
and designated as New Subdivision Unit Number 1151.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK$ TEXAS.
I•
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 28TH JUNE, 1962.
4—
Jack F• Strong, Mayor
ATTES s
La enia Lowe, City Secr Lary
APPROVED:
J T. Hickerson, City Engineer
APPROVED;
--
FE#K enter, Jr., City Attorney
CONSOLM&TED FINAL ESTIt+1ATE
MACKEIRZIE TERRACE ADDITION
LOT 2, TRACK D
Accepted June 28, 1962
QUANTITIES _ .
S.Y.
Unit Location S.Y. L.F. Alley
Paving� et.
N.S. 1151 8edbud Ave. from 74' N.of 926.08 530,40 15.54
S.P.A.of E.4th'St.tc 3 S.
of the alley Ss-of 8.4th Sty
TOTALS 926.08 530.40 15.54
COST ,JSTIMTB
926.08 S.Y. Paving @ 1.45 $1,342082 .
530.40 L.F. Curb & Gutter.,@ 1.45 769.08
15.54 S.Y. Alley Return @,5.00 77.70
CONTxACr COST 42,189.60
QOST DISTRIBUTION
Contract Property
Unit Cost Owner Cost
N.S. 1151 $ 2189.60 $ 2189.60
TOTAIS $ 2,189.60 $ 2,189.60
7
CITY OF LUBBOCK
CIL
TEXAS
June 28, 1962
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Barr Paving Company, paving contractor, under their contract with
the subdividers of Mackenzie Terrace Addition and find the
improvements on lRedbud Avenue. as listed on the final estimate sheet
to have been completed in accordance with the plans and specifications
and recommend that you accept the improvements on said streets and/or
avenues, authorizing payment to the contractor the amount shown on the
attached consolidated final estimate sheet as due them by the City of
Lubbock.
Yours very truly,
61hn T. Hickerson
City Engineer