HomeMy WebLinkAboutResolution - 061462H - Street Improvements - City Engineer - 15Th Street, Orlando Avenue - 06_14_1962 C04 RESION
WHEREAS, the City Commission has heretofore determined that the city
would contribute the customary city portion of the cost of street paving im-
provements, as determined by City of 'Lubbock paving policy, to be constructed
in accordance with the standard City of Lubbock street plans and specifications
as approved by the City Engineer, and the owners of property abutting 15th
Street from Orlando Avenue to Norfolk Avenue, Orlando Avenue from 15th Street
to 16th Street (West Leg) have requested permission to have pavement improve-
ments constructed on the 'aforementioned streets and the paving of said streets
is needed to' provide access to the area during its construction period, and the
City Engineer has approved the plans and specifications for such improvements,
and,
WHEREAS, the owners of the property abutting on the herein described
street will contract separately with a competent contractor for the above stree
improvements, and said improvements will be constructed in accordance with the
abovementioned plans and specifications under the supervision of the City
Engineer, and the said owners desire that the city contribute its customary
share towards such paving, and,
WHEREAS, the contract cost of the paving improvements will not exceed
$7,697.01, the total cost not over $8,081.86, and the city's share in connec-
tion therewith would not exceed $1,044.35, leaving the property owners portion
not to exceed $7,037.51, such costs being well within the current prices for
paving obtained by competitive bidding, and that such payment to be made by the
city is reasonable, fair, and just to the abutting property owners, the city
�-- and all other persons affected thereby, and that the sum of $1,044.35 will be
duly budgeted, THEREFORE,
BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LUBBOCK:
k .
Section 1. THAT, the City gngineer be and he is hereby authorized
to approve plans and specifications for paving on the streets herein described,
provided that such plans and specifications meet the usual requirements for
paving on streets within the corporate limits of the City of Lubbock; said
streets being as follows, to-wit:
15th Street from its intersection with the nest Curb Line of Orlando Avenue to
its intersection with a line 6 feet {Test of the West Property Line of Norfolk
Avenue, known and designated as Unit Number 2007.
Orlando Avenue from its intersection with a line 3 feet South of the South
Property Line of 15th Street to its intersection with a line 8 feet South of
the South Property Line of 16th Street (West Leg) , known and designated as
Unit dumber 2005.
The City Engineer is further authorized and directed to dulyy inspect
said paving construction on said streets and to require strict compll. nee with
the approved plans and specifications, and upon completion of said paving, and
upon final approval by the City Engineer and acceptance of such improvements
by the City Commission, the City Engineer is authorized to pay the contractor
in fall and final payment of the cityts share of the cost of the abovementioned
improvements a sum not to exceed $659.50 which is the cityls share $1,044.35
less $384.85 engineering, leaving the amount due the contractor from the
property owners not to exceed $7,037.51.
/lr
v f '
M
Section 2. This authority is conditioned-tbat the owners of abutting
property and the contractor will pay for all material and labor and costs
incidental to such construction, 'indemnify the City of Lubbock against any
costs, claims or damages of every nature pertaining thereto, and that the
contractor furnish the City Engineer with acceptable evidence that the
contractor and his sub-contractors, if any, are adequately covered by public
I!iability and property damage insurance policies, that the said owners of
atting property will cause such paving to continue to be done according to
tt approved plans and specifications, and that upon completion thereof and
final approval of the City Engineer, all improvements designated herein shall
bye a permanent part of said streets and the property of the City of Lubbock,
£;without any liability whatsoever, except for the payment of a sum of $659.50
o the contractor.
On motion of Commissioner O'Mara --
seconded by Commissioner erson , the foregoing
' resolution was unanimously passed by the C y Cossmission this 14th day of June,
1:962.
Jack F. Strong, Mayor
11TTHST s
1,aveaa Love, City 13 cretary,
The owners of abutting property on the abovementioned street, and Pioneer
Pavers, Inc., Contractor,` .do hereby accept and agree to IfAlly abide by the
foregoing provisions for the considerations n stated.
Ale
By
By
Approved:
J hn T. Hiekerson, City Engineer
App .
�--, Fred O. Senter, Jr., CLE2Attothey
y ..
• p