HomeMy WebLinkAboutResolution - 1350 - CO#3 To Contract - Carrothers Co Inc - Digesters & Controls, WRF - 03_31_1983JWF:da
V 77CM rrmrnrr
{
RESOLUTION 1350 - 3/31/83
(See Reso. 865 for orig. contract)
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Change Order
No. 3 to the construction contract entered into by and between .said City (as
owner) and Carrothers Construction Co., Inc. for two 400,000 cubic feet
digesters, controls, equipment, heater building and related items at the City
of Lubbock Wastewater Reclamation facilities, attached herewith which shall be
spread upon the minutes of the Council and as spread upon the minutes of this
Council shall constitute and be a part of this Resolution as if fully copied
herein in detail.
Passed by the City Council this 31st
ATTEST:
Evelyn -Ga fga, Cit V
etary-Treasurer
APPROVED AS TO CONTENT:
;�(J'dx Q_In"�'&P�
Wilfb.d . Watson, Chief Engineer
APPROVED -AS TO FORM: _ s1
day of March ,1983.
r
Z L cALISTER, MAYOR
RESOLUTION 1350 - 3/31/83
., (See Reso. 865 for orig. contract)
CHANGE ORDER ND. 3
City of Lubbock, Texas
Project No. C-48-1252-13
March 31, 1983
{
J;
�d
TO: CARROTHERS CONSTRUCTION COMPANY, INC.
P.O. sox 269
Paola, Kansas 66071
General description of work included in original contract:
The construction of improvements to the City of Lubbock k'astewater
Reclamation Facilities. The work consists of the construction of two
400,000 cubic feet digesters, a digester control and heater building,
installation of digester equipment and related work items.
Original Amount of Contract . . . . . . . . . . . $2,780,000.00
Change Order No. 1 . . . . . . . . . . . . . . ADD 710.00
Change Order No. 2 . . . . . . . . . . . . . . . ADD 4,118.00
Change Order No. 3 . . . . . . . . . . . . . . ADD 24,705.25
Adjusted Contract Amount . . . . . . . . . . . $2,809,533.25
Adjustment in Construction Time . . . . . . . . 100 Days
Revised Project Completion Date . . . . . . . . May 26, 1983
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amount shown above.
1. One hundred day extension of time on
project due to inclimate weather in
December 1982 and January 1983 and to
allow for entrance road paving as de-
scribed in item 2.
ADD .,. $ -0-
CHANGE ORDER NO. 3
Page 1 of 2
2. Addition of entrance road paving to pro-
ject. Urit pr! -'c -ne
ties of work are listed below.
Estimates
Unit
Item
Quantity
Price
Extension
(a)
Excavation and sub-
1,725 S.Y.
$ 0.65
$ 1,121.25
grade preparation
(b)
6" flexible base and
1,500 S.Y.
9.60
14,400.00
1-1/2" iLMAC surface
(c)
6" concrete valley
30 S.Y.
38.00
1,140.00
gutter
(d)
30" curb and gutter,
730 L.F
10.30
7,519.00
laydown curb, or saw
tooth curb
Subtotal
$24,180.25
ADD. . . . . . . . .
.. . . . . . . .
. . . .
. . . . . $ 24,180.25
3. Furnishing a pipe marking kit consisting
of 1,000 black on yellow aluminum letters,
35 aluminum tag holders, tag storage kit,
30 nylon straps for 6" and smaller pipe and 30 nylon straps for 6" and larger.pipe. _
ADD. . . . . . . . _ . . . . . . . . . . . . . . . . . . . $ - 525.00
IN WITNESS THEREOF, the Owner and the Contractor have hereto set
their hand this 31st- day of March , 1983.
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By
,Proj . Engineer, , 1983
APPROVED: CARROTHERS CONSTRUCTION CO., INC., Contractor
By
APPROVED: CITY OF LUB , T , Owner
r
By i , Mayor
ATTEST:
Ci'fy ecreta
CHANGE ORDER NO. 3
Page 2 of 2
, 1983
3/31/ , .1983
RESOLUTION 1350 - 3131183
.� (See Reso. 865 for orig. contract)
CITY SECRETARY -TREASURER
t CHANGE ORDER NO. 3
City of Lubbock, Texas
Wastewater Reclamation Facilities
Project No. C-48-1252-13
:March 31, 1983
TO: CARROTHERS CONSTRUCTION COMPANY, INC.
P.O. Box 269
Paola, Kansas 66071
General description of work included in original contract:
The construction of improvements to the City of Lubbock Wastewater
Reclamation Facilities. The work consists of the construction of two
400,000 cubic feet digesters, a digester control and heater building,
installation of digester equipment and related work items.
Original Amount of Contract . . . . . . . . . . . . $2,780,000.00
Change Order No. 1 . . . . . . . . . . . . ADD 710.00
Change Order No. 2 . . . . . . . . . . . . . . . ADD 4,118.00
Change Order No. 3 . . . . . . . . . . . . . . . ADD 24,705.25
Adjusted Contract Amount . . . . . . . . . . . $2,809,533.25
Adjustment in Construction Time . . . . . . . . 100 Days
Revised Project Completion Date . . . . . . . . May 26, 1983
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amount shown above.
1. One hundred day extension of time on
project due to inclimate weather in
December 1982 and January 1983 and to
allow for entrance road paving as de-
scribed in item 2.
ADD ... $ -0-
a
.•
2. Addition of entrance road paving
to pro-
ject. Unit prices
and estimated
quanti-
ties of work are listed below.
Estimated
Unit
Item
Quantity
Price
Extension
(a)
Excavation and sub-
1,725 S.Y.
$ 0.65
$ 1,121.25
grade preparation
(b)
6" flexible base and
.1,500 S.Y.
9.60
14,400.00
1-1/2" HMAC surface
(c)
6" concrete valley
30 S.Y.
38.00
1,140.00
gutter
(d)
30" curb and gutter,
730 L.F
10.30
7,519.00
laydown curb, or saw
tooth curb
Subtotal
$24,180.25
.ADD. . . . . . . . . ..
. . . . . .
. . . .
. . . . . . . $ 24,180.25
3. Furnishing a pipe marking.kit consisting
of 1,000 black on yellow aluminum letters,
35 aluminum tag holders, tag storage kit,
30 nylon straps for 6" and smaller pipe
and 30 nylon straps for 6" and larger..pipe. _
ADD. . . . . ._ . . . . . . . . . . . . . . . . . . . . . $ 525.0-0
IN WITNESS THEREOF, the Owner and the Contractor have hereto set
their hand this 31st day of March , 1983.
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By ,Proj. Engineer, , 1983
APPROVED: CARROTHERS CONSTRUCTION CO., INC., Contractor
By. , 1963
APPROVED: CITY.OF-LU ZT, Owner
:By �%Mayor 3/31/ 1983
ATTEST:
Ci y ecret
CHANGE ORDER NO. 3
Page 2 of 2
RESOLUTION 1350 - 3/31/83
(See Reso. 865, 7/19/81)
CHANGE ORDER NO. 3
City of Lubbock, Texas
Wastewater Reclamation Facilities
Project No. C-48-1252-13
March 31, 1983
TO: CARROTHERS CONSTRUCTION COMPANY, INC.
P.O. Box 269
Paola, Kansas 66071
General description of work included in original contract:
The construction of improvements to the City of Lubbock Wastewater
Reclamation Facilities. The work consists of the construction of two
400,000 cubic feet digesters, a digester control and heater building,
installation of digester equipment and related work items.
Original Amount of Contract . . . . . . . . . . . . $2,780,000.00
Change Order No. 1 . . . . . . . . . . . . . ADD 710.00
Change Order No. 2 . . . . . . . . . . . . . . . ADD 4,118.00
Change Order No. 3 . . . . . . . . . . . . . . . ADD 24,705.25
Adjusted Contract Amount . . . . . . . . . . . $2,809,533.25
Adjustment in Construction Time . . . . . . . . 100 Days
Revised Project Completion Date . . . . . . May 26, 1983
WHEREAS, it is desirable to make changes in the work to be constructed
under this project.
THIS AGREEMENT WITNESSETH: In consideration of the mutual advantage
gained, the Owner and the Contractor agree to the changes indicated below
and further agree that the amount of the contract shall be adjusted by the
amount shown above.
1. One hundred day extension of time on
project due to inclimate weather in
December 1982 and January 1983 and to
allow for entrance road paving as de-
scribed in item 2.
ADD. ... . . ... . . ... . . . . . . . . . . . $ -0-
CHANGE ORDER NO. 3
Page 1 of 2
2. Addition of entrance road paving
to pro-
ject. Unit prices
and estimated
quanti-
ties of work are listed below.
Estimated
Unit
Item
Quantity
Price
Extension
(a)
Excavation and sub-
1,725 S.Y.
$ 0.65
$ 1,121.25
grade preparation
(b)
6" flexible base and
1,500 S.Y.
9.60
149400.00
1-1/2" HMAC surface
(c)
6" concrete valley
30 S.Y.
38.00
1,140.00
gutter
(d)
30" curb and gutter,
730 L.F
10.30
7,519.00
laydown curb, or saw
tooth curb
Subtotal
$24,180.25
ADD. . . . . . . .
. . . . . . .
. . . . .
. . . . . . $ 24,180.25
3. Furnishing a pipe marking kit consisting
of 1,000 black on yellow aluminum letters,
35 aluminum tag holders, tag storage kit,
30 nylon straps for 6" and smaller pipe
and 30 nylon straps for 6" and larger pipe.
ADD . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 525.00
IN WITNESS THEREOF, the Owner and th Contractor h ve hereto set
their hand this day of 1983.
RECOMMENDED: PARKHILL, SMITH & COOPER, INC., Consulting Engineers
By. rwsv ,Proj. Engineer,_ 1983
APPROVED: CARROTHERS CONSTRUCTION CO., INC., Contractor
BA L,Prof. Manager ��- 3 , 1983
APPROVED: CITY OF L B T S Owner
r
By 3_ 3/ 1983
ATTEST:
City Secretary
CHANGE ORDER NO. 3
. , I If'