HomeMy WebLinkAboutResolution - 4161 - CO #1 To Contract- Red River Construction- WTP Improvements, TSR Rehabilitation - 05_27_1993Resolution No. 4161 May 27, 1993 Item #30 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock a Change Order No. I to a contract previously entered into by and between the City of Lubbock and Red River Construction Company for Water Treatment Plant Improvements and Terminal Storage Reservoir Rehabilitation, attached herewith, which shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this ATTEST: �J Betty o on, City Secretary APPROVED AS TO CONTENT: xe' Mi a Murp y, a VfEngineer APPROVED AS TO FORM: A41'eu lUarold Willard, Assis ant ity Attorney HW:js/REDRIVER.RES DI-Agenda/May 18, 1993 Change Order No. 1 Project Name: HDR Project No.: 00008-1 1 1-037 City of Lubbock Water Treatment Plant Improv. Terminal Storage Reservoir Rehabilitation Project Owner: (Name, Address) Owner's Project No.: City of Lubbock P.O. Box 2000 Lubbock, Texas 79116 Date of Issuance: 04-27-93 Project Contractor: (Name, Address) Date of Contract: 1 1-16-92 Red River Construction Company, Inc. 13725 Omega Road Dallas, Texas 75244 Contract Period: 120 days It is aareed to modifv the Contract referred to above as follows: Item No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease Increase 1 Change Proposal Request No. 1 $10,943.75 0 3 2 Change Proposal Request No. 2 $ 0.00 0 3 Change Proposal Request No. 3 $ 3,175.20 0 2 4 Change Proposal Request No. 4 $ 2,702.00 0 3 5 Change Proposal Request No. 5 $ 1,007.75 0 2 6 Change Proposal Request No. 6 $ 3,014.50 0 0 7 Time Extension Re: Letter of March 5, 1993 10 8 Time Extension Re: Letter of May 5, 1993 23 Sub -Total Difference Net $20,843.20 43 Summary: It is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order f $1,247,750.00 I 120 days Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order $20,843.20 143 days I Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders I $1,268.593.20 I 163 days I The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. to �3 Accepte or Pontractor by: Date ZLW� -04 )— Recommended for Approval By (HDR Engineering c.) Date (Ver 1.0 Oct 1990) III-5020-2 CHANGORD.FRM RED RIVER CONSTRUCTION COMPANY, INC. • GENERAL CONTRACTOR • • WATER TREATMENT FACILITIES • April 27, 1993 HDR Engineering, Inc. 12700 Hillcrest Dr., Ste. 125 Dallas, Texas 75230-2096 Pni RIORITY Attn: Joe Ezzell Re: Terminal Storage Reservoir Rehabilitation Dear Sir: Enclosed are recaps of Change Order Proposals No. 1, 3, 4, and 5. Please note on Change Order Proposal No. 5, no removal or replacement of liner was done at the Southeast corner of the reservoir. However, we were required to make several repairs as directed by the Owner's representative. We use this CPR to show those additional repairs. Please issue a change order in the amount of $20,843.20, along with an additional forty days. This encompasses the four enclosed Change Order Proposals, along with Change Order Proposal No. 6 and our letter of March 5, 1993 to Ron Shuffield with the City of Lubbock. The recap of this Change Order cost is as follows: CPR Cost 1 - Northeast Corner Repairs $10,943.75 2 - Liner Installation Change 0.00 3 - Northeast Corner Line Replacement 3,175.20 4 - Southwest Corner Repairs 2,702.00 5 - Other Line Repairs 1,007.75 6 - Liner Vents 3,014.50 TOTAL CHANGE ORDER: $20,843.20 Should you have any questions concerning this, please feel free to contact us. We will be submitting our current month Is Pay Estimate with all work shown as complete and request that retainage be reduced to 10. Including this Change Order, that would leave the City roughly 33,000.00 to take care of any problems which might arise concerning seeding. Once this change order has been approved, we will submit our final Pay Estimate. Thank you, RED RIVER CONSTRUCTION COMPANY, INC. — PRIORITY Dean Porter Secretary / Treasurer Enclosure 13725 Omega Road Phone: (214) 980-4972 Dallas, Texas 75244 FAX: (214) 980-7005 CITY OF LUBBOCK MEMO TO: Bob Cass, Interim City Manager FROM: Dan A. Hawkins, P.E., Director of Water Utilities SUBJECT: Agenda Items and Comments for City Council Meeting for May 27, 1993 DATE: May 17, 1993 VI. WATER UTILITIES ITEM #/SUBJECT Consider a resolution authorizing the Mayor to execute a Change Order agreement with Red River Construction Co. for necessary additional work for the City of Lubbock Water Treatment Plant Improvements, Terminal Storage Reservoir Rehabilitation. BACKGROUND/DISCUSSION Initial Contract amount for construction of this project is $1,247,750.00. The scope of this rehabilitation project was to remove badly damaged liner, repair and rework interior embankments and replace damaged liner with approximately 30,000 square yards of concrete. In the course of this project it was necessary to perform additional work that was unforeseen due to the fact that this work was not obvious until the existing liner was removed and deterio- rated slopes were revealed. The majority of the additional work performed was in the corner sections where the damage was the most severe (see attached letter with break down of Change Order Costs). SUMMARY/RECOMMENDATIONS: Due to the nature of this project and the need to have a sound and solid terminal storage reservoir for the water treatment plant operation it is our recommendation to accept the Change order of $20,843.20 as presented by HDR, engineering consultant for this project, and Red River Construction resulting in a total cost of construction of $1,268,593.20 which would be approximately 1.7% over the original contract amount. The Council budgeted $1,800.000 in FY 92-93 for this work, providing a large contingency fund primarily t llow for such unknown conditions. r Da A. Hawkins, P.E. Director of Water Utilities